THE ROLES OF TRADITIONAL RULERS IN NATIONAL DEVELOPMENT
(A CASE STUDY OF MAI-GARI OF LOKOJA)
ABSTRACT
This research work is centred on
‘’The Role of Traditional Rulers in National Development with a case
study of ‘’The Maigari of Lokoja. The major objective of the work is to
access the impact of traditional rulers in nation building, primary and
secondary sources of data were used while simple percentage method was
used in analyzing the data. The findings revealed that traditional
rulers contributes to national development, equally that they are an
agent of change in the society. At the end of the research, the
researcher recommended that: traditional ruler at present and in future
be allowed a conducive environment to perform their operational roles
towards the conventional nation building.
CHAPTER ONE
INTRODUCTION
1.1 BACKGROUND TO THE STUDY
Nigeria traditional rulers often derive
their title from the rulers of independent states or communities that
existed before the formation of modern Nigeria.
Although they do not have formal
political powers in many cases they continue to command respect from
their people and have considerable influence within their domain and the
people.
Modern Nigeria encompasses lands
traditionally occupied by highly diverse ethnic groups with very
different languages and traditions. In broad terms, the southeast
including the Niger Delta was occupied mainly by Igbos and related
people, the Southwest by Yoruba and related people and north by Hausa
and Fulani people, with a complex intermingling of different ethnic
groups in the middle belt between north and south.
Before the arrival of the British in the late 19th
century, the history of the area was turbulent, with periods when
empires such as those Oyo, Kanem-Bornu and Sokoto gamed control over
large areas, and other periods when the state were more fragmented.
Although political structures different
widely between different ethnic groups, it was common for each town or
collection of towns to have a recognized ruler, who might in turn be
subordinate to the ruler of a large polity.
Thus the Sokoto caliphate wad divided
into emirate, with the emirs loosely subordinate to the Sultan of
Sokoto, although at times, acting as independent rulers.
Europeans had long traded with the
coastal, primarily exchanging cotton and other manufactured goods for
slaves and palm oil products at centres such as Calabar, Benin and
Lagos. The Niger Coast Protectorate was established in 1891 holding a
small area along the coast.
During the period 1879-1900, the Royal
Niger Company made a concerted effort to take control of the interior,
using disciplined troops armed with the maximum and making treaties of
‘’protection’’ with the local rulers.
The company’s territory was sold to the
British Government in 1900, with the Southern region merged with the
Niger Coast Protectorate to become the Southern Nigeria Protectorate and
the Northern Nigeria Protectorate remaining separate.
In 1914 the two were merged into the
colony and protectorate of Nigeria, with roughly the same boundaries as
the modern state of Nigeria.
The first British High Commissioner for
Northern Nigeria, Fredrick Lugard, tried to rule through the traditional
rulers, and this approach was later extended to the south. Lugard’s
successor Hugh Clifford left this system in place in the north, where
the emirate system had long traditions, but introduced a legislative
council with some elected numbers in the south, relegating the
traditional rulers to mainly symbolic roles.
Overtime, the relationship between the
colonial administration and the traditional rulers evolved. For example
the Tiv people, the fourth largest ethnic group, had always been
extremely decentralized with no single ruler. The British created the
office of Tor Tive in 1947, appointing Makere Dzakpe as the first
builder of the title in order to have a ‘’TRADITIONAL RULER’’ to speak
for Tiv people.
With independence in 1960, followed by
alternating democratic and military governments, the status of the
traditional rulers evolved even further. In the north, the emirs finally
lost power to the government administration, through said
administration was often staffed by traditional notables.
Where rulers had previously acquired
office strictly through inheritance or through appointment by a council
of elders, the government now increasingly became involved in the
succession. Thus, in May 1994, the military ruler General Sani Abacha
deposed subsequently reinstated in January 2000.
In some cases, the government has merged
or split traditional domains. For example, there had been two rulers of
the Efik people in the area around Calabar, but in December 1970, it
was agreed to combine the office into a single one that was to be held
by a ruler known as the Obong.
The government has maintained colonial
classifications. Thus the appointment of monarch are attached with
grades and level of monarch into FIRST GRADE, SECOND GRADE and THIRD
GRADE Monarch.
Traditional ruler today are still highly
respected in many communities, and have considerable political and
economic influence. Although, they have no formal role in the democratic
structure, there is intense competition for royal seats amongst the
finite pool of eligible dynast.
The rulers plays useful roles in
brokering between the people and the state, enhancing national identify
resolving minor conflicts and providing an institutional safety-value
for often inadequate state bureaucracies.
One reason for their influence may be
that the people of many ethnic groups have limited ability to
communicate in the official English Language; so the traditional ruler
serves as an interpreter and spokesperson.
1.2 STATEMENT OF PROBLEMS
The utmost concern of this study is to examine the major or primary roles of traditional rulers in national development.
Nigeria had hoped to attain or achieve a
sustainable development since the attainment of independence to build a
strong, self reliance and initial nation with a great and dynamic
economy, it is also hoped to resuscitate the economy with a just and
egalitarian society and a land of bright full opportunity for all
citizens.
However the study will proffer answers to some fundamental questions like;
To what extent are the roles of traditional rulers in the attainment of national development.
How effectiveness of the roles played by traditional rulers to the grassroots development.
What are the political, economic and
socio-cultural implications of the roles of the traditional rulers to
the development of a nation.
1.3 AIMS AND OBJECTIVES OF THE STUDY
The aims and objectives of this study are manifold. They include;
To provide a better understanding on the
concept of traditional institution, it roles, potentials and relevance
as an agent of national development.
To look at the short comings and
problems faced by the traditional rulers and how to proffer lasting and
enduring solution to them.
To examine the landmark achievement of a
particular traditional ruler in Kogi State (The Mai-Gari of Lokoja) in
the course of its impacts in the development of a nation.
1.4 SIGNIFICANCE OF THE STUDY
This research project is significant in a
numbers of ways, it offers a basis for further academic discourse and
the extension of the frontier of knowledge in the area of study.
It acts or serves as a form of handbook
for historian, policy makers and administrators in general especially
towards the formation of effective policies needed for national growth
and development.
The research work also gives insight
into the operations, potentials and necessity of the traditional rulers
in national development
The significance of this study can also be seen in the topically of issue and its contentions nature.
1.5 RESEARCH HYPOTHESIS
In the words of Asika (2000:14),
hypothesis can be defined as ‘’a prediction or a conjecture stated well
in advance of observation (or actual collection of data), about what can
be expected to occur under stated or given conditions’’. As for Ofo
(1999:45), hypothesis could mean ‘’a prediction or expectation about the
differences or relationships between variables identified in the
problem to be studied’’. In the case of Omolaye (1986), he views
hypothesis as ‘’a suggested answer to the identified problem under
investigation’’.
With the understanding of the concept of hypothesis, the following are the hypothesis formulated for the testing.
Ho: Traditional rulers as an agent of grassroots development has significant roles to national development
Hi: Traditional rulers as an agent of grassroots development has no significant roles to national development
Ho: The existence of traditional rulers brings about development
Hi: The existence of traditional rulers does not bring about development.
1.6 SCOPE AND LIMITATIONS OF THE STUDY
The scope of this study embraces a
consideration of the operation, impact and potentials of traditional
rulers, it contribution to the national development.
However, the study is limited by
factors, such as time constraints, financial impediment (No enough fund
to guarantee access to some sources of information and all information
in this research project is obtained within the confines of data the
researcher is disposed to:
1.7 DEFINITION OF TERMS
The key words or idea utilized in the
research work have their own operational definition as to give insight
to the subject matters. They are;
Traditional ruler: This
refers to as the traditional head of ethnic unit or clan and whose
title is recognized as a traditional ruler by the government of the
state.
Development: The
process of economic and social transformation that is based on complex
cultural and environmental factor and their interactions.
National development:
National development refers to the ability of a country or countries to
improve the social welfare of the people, this can also mean the
expansion and growth of people in an area or government.
1.8 ORGANIZATION OF WORK
This research work, The Role of
Traditional Rulers in National Development, a case study of the Maigari
of Lokoja encompasses the standard project guide with five chapters.
The chapter one which is the
introduction has the following sub-headings, background to the study,
statement of problems, aims and objectives of the study, significance of
the study, scope and limitations of the study, research hypothesis,
definition of concepts, organization of work and references.
The chapter two of this research work,
which is the literature review covers the concept of traditional
institution, meaning and operations of traditional rulers, history of
Nigeria traditional rulers, concept of development, concept of national
development, the roles of traditional rulers in national development,
appraisal and summary of literature review and reference.
The chapter three of this research work
is the research methodology, with the following sub-headings. Source of
data collection, method of data collection, sampling method, population
of the study, research design and problem of data collection and
references.
The chapter four of the study focuses on the data presentation, data analysis, discussion of findings, and references
The chapter five, holds summary,
conclusions and recommendations, it also contain the reference,
bibliography and appendix including questionnaire.
REFERENCES
Christ E. (2010): Nigeria go Crazy for Title: BBC News 3 September, 2010.
Culture and Society (2007) Greek Town (Iboku Esit Edik) Foundation.
Johnson A.S. (1967), Fulani Empire of Sokoto: Oxford University Press.
Olayemi, A. (2002). The Colonial Contest for the Region 1984-1900. A History of German Participation.
Shaibu M.E. et al (2001), Issues in Local Government Administration in Nigeria Lokoja Medupin Success Printers.
Willaim F.S. (1993) Traditional Rulers and Development Administration. Chieftaincy in Nigeria.
SOLD BY:
No comments:
Post a Comment