CHEMICAL ENGINEERING

CHEMICAL ENGINEERING PROJECT TOPICS

Enems project provides you with comprehensive research material on CHEMICAL ENGINEERING suitable for ND, HND, Bsc etc final year project at affordable price.

Below are several project topics relevant to CHEMICAL ENGINEERING for your consideration:

  1. INVESTIGATING THE INFLUENCE OF ACTIVATION TEMPERATURE ON YIELD AND METHYLENE BLUE ABSORPTION OF ACTIVATED CARBON
  2. ASSESSMENT OF CARBON MONOXIDE (CO) LEVEL IN ENUGU METROPOLIS MONITORING INDUSTRIAL AND RESIDENTIAL AREA
  3. A COMPARATIVE STUDY OF CHEMICAL AND MICROWAVE SYNTHESIZED ACTIVATED CARBORN FROM CORN COB
  4. ANALYSIS OF BUSH PEAR AND ITS OIL
  5. COMPARATIVE ANALYSIS OF COAL, FUEL OIL AND NATURAL GAS FOR CEMENT PRODUCTION
  6. EFFECT OF PARTICLE SIZE ON OIL YIELD USING SCENT BEAN SEED (‘OZAKI’).
  7. EXTRACTION AND FORMULATION OF PERFUME FROM PLANT
  8. EXTRACTION AND FORMULATION OF PERFUME FROM LEMON GRASS LEAVES
  9. HEAD LOSES IN HORIZONTAL AND VERTICAL ORIFICEMETER A COMPARATIVE EVALUATION AND ANALYSES WITH APLLICATION OF STATISTICAL METHOD OFDATA RELIABILITY
  10. MODIFICATION OF SURFACE, PHYSICAL AND CHEMICAL PROPERTIES OF ACTIVATED CARBONS FOR WATER PURIFICATION
  11. REFINING OF SOYA BEAN OIL
  12. REFINING OF PALM KERNEL OIL
  13. THE KINETIC STUDY ON HYDROLYSIS OF CELLULOSE (SAW-DUST)
  14. THE EFFECT OF TEMPERATURE ON HYDROLYSIS OF CELLULOSE (SAW-DUST)
  15. THE PRODUCTION OF YAM FLOUR
  16. A COMPARATIVE ENTHALPY APPROACH FOR CO- AND COUNTER CURRENT FLOW IN CONCENTRIC TUBE HEAT EXCHANGER
  17. ASSESSMENT OF THE PHYTOCHEMICAL CONSTITUENTS AND PROXIMATE COMPOSITION OF AFRICAN PEAR.
  18. EXTRACTION AND CHARACTERIZATION OF VEGETABLE OIL USING BREAD FRUIT SEED.
  19. THE STUDY OF PROPERTIES OF BRIQUETTES PRODUCED FROM GROUNDNUT SHELL COAL BLEND

No comments:

Post a Comment

undefinedSOLD BY: Enems Project| ATTRIBUTES: Title, Abstract, Chapter 1-5 and Appendices|FORMAT: Microsoft Word| PRICE: N5000| BUY NOW |DELIVERY TIME: Immediately Payment is Confirmed

undefinedSOLD BY: Enems Project| ATTRIBUTES: Title, Abstract, Chapter 1-5 and Appendices|FORMAT: Microsoft Word| PRICE: N5000| BUY NOW |DELIVERY TIME: Immediately Payment is Confirmed