Thursday, 23 November 2017

DESIGN AND CONSTRUCTION OF INDUCTION COOKER SENSOR



DESIGN AND CONSTRUCTION OF INDUCTION COOKER SENSOR

CHAPTER ONE
           1.1  INTRODUCTION
This application note describes an induction cooking design which can be used to evaluate component or to get started quickly with your own induction cooking development project.
Induction cooking is not radically new invention, it has been widely used all around the world. With recent improvement in technology and consequent reduction of component costs, induction cooking equipment is now more affordable than ever. The design provides an opportunity to understand how an induction cooker works and to make an in debt examination of the various blocks and part of this type of cooking application such the driving topology, how the resonant tank works, how the pot get hot and to remove it safely from the cooking plates. The design is entirely controlled by a simple ST7FNITE09Y0 8-bit controller, and drives the fan and relay control to the plate feedback.
1.2       BACKGROUND AND JUSTIFICATION
This presentation report is based on the design and construction of amicroprocessor based induction steel sensor cooker. The project is mainly concerned with the development of an electric device for fast and hygienic cooking, and warming food for human consumption thereby reducing human energy wasted in the use of firewood and stove and the dirtying of cooking utensils will also be minimized. The microprocessor based induction ferrous sensor electric cooker can be very easy to manage and operate but for safety usage there must be total adherence or compliance to the prescription and procedure of handling the cooker. This is inevitable to prevent electric hazard or burn i.e. adequate care must taken by the user. Cooked food is commonly consumed by all classes in the society. The commonly used means of cooking is the firewood which is likely to expose the food to toxics by-product of wood combustion and smoke hence rendering the process unhygienic. The large scale consumers
are and have no choice than to consume the food irrespective of the size, type and sometimes the low quality as produced and supplied by local cooks who maximizes their profit at the expense of the consumer.
The microprocessor based induction steel sensor electric cooker makes the combine work of cooking, baking, drying of food items an easy household task. It is faster, hygienic and easily operated. Heat conduction issue is one of the hot topics in research area. It has wide applications in industry and our daily life, such as electrical furnaces, electrical heating appliances, and ventilation of computer chips. Among those heat conduction problems, the heating elements are the core topic of the heat conduction problems. Different heating elements demonstrate different characteristics in heat conduction. Among many different structures of the heating elements, the coil has been used in many areas because of its compact structure and large thermal expansion (McLain, 2003).
Heat conduction issue is one of the hot topics in research area. It has wide applications in industry and our daily life, such as electrical furnaces, electrical heating appliances, and ventilation of computer chips. Among those heat conduction problems, the heating elements are the core topic of the heat conduction problems. Different heating elements demonstrate different characteristics in heat conduction. Among many different structures of the heating elements, the coil has been used in many areas because of its compact structure and large thermal expansion ( Ololade, 2007).
This study has analyzed the heat transfer of the heating coils under different conditions by using an induction based cooker. It provides some useful information on designs and applications of heating coils. Therefore, the concept of induction cooker is a special kind of transformer. When a good-sized piece of magnetically conducting material such as, for example, a cast-iron frying pan, is placed in the magnetic field created by the cooking element, the field transfers (“induces”) energy into the metal. That transferred energy causes the metal the cooking vessel (cookware) to become hot ( Dorf, 2002 ).
1.3       AIM OF  RESEARCH
The aim of this project is as follows:
        i.               Offer the project executors the opportunity of self-employment after graduation.
      ii.               To offer an opportunity to the student to combine the theory and practical experience gathered in the course of study for man’s development.
    iii.               To produce home-made cooking device at an affordable price to the people.
1.4       OBJECTIVES
A comparative analysis of the cost of production of this electric cooker unit with oven and the relative cost of similar types available in the market indicates that the project is cheaper, maintainable and easy .to control. It therefore makes the project to be preferred over similar types and moreover it is constructed from locally available materials even discarded materials. Below are the main objectives for this project
           i.         To develop a device that can offer employment which will result in reducing the number of teeming youths on the labor market
         ii.         To stimulate more interest on the use of electrical principle on food processing such as confectionaries.
       iii.         To promote economic industrial growth of the nation by the design and construction of cooker unit that is exportable.
1.5       MOTIVATION
The rate at which stainless kitchen utensils are been stained is alarming and discomfort on the side of the users. In most cases hard and sharp substances like sand or ashes have to be applied or used to remove the stain.
Hence, this project aims at eliminating the aforementioned above in order to create the ease of cleaning of kitchen utensil.
1.6       SCOPE AND LIMITATION OF THE PROJECT
Certainly, studying the potential of raw materials and applying basic engineering principles for design and construction is a very essential task. Though, several studies have exploited some tactical principles to generated heat for constructive deeds. Based on this study the limitation is based on the design and construction of a cooker unit using electromagnetic effects.
1.7       STATEMENT OF THE PROBLEM
The problem in which this project work is aimed at solving is the challenges associated with power failure and fuel scarcity which among others include:
The erratic power supply from Power Holding Company of Nigeria  (PHCN).
Excessive uses of wood and charcoal for cooking which is thereby associated with harmful effects especially on cardiovascular infection.
The high cost of production for small and large scale business owners as a result of lack of constant power supply.
The high cost of fuel and seasonal fuel scarcity in Nigeria.
The high cost of generating sets and close down of industries and companies.
1.8       SIGNIFICANCE OF THE REPORT
The microprocessor based induction steel pot sensor electric cooker equipment which is of importance to the economic growth of the nation. Induction cooking has several advantages over traditional methods of cooking as outline below:
                    i.            It makes cooking faster
                  ii.            Speed: conductive heat transfer to the food is very direct because the cookware is heated uniformly and from within. Induction cooking is even faster than gas cooking
                iii.            Safety: there are no open flames. This reduces the chances of fire and the cold stove top is also more child safe
                iv.            Efficiency: around 90%. Heat is generated directly in the pot, while for electric and gas the efficiency is around 65% and 55% respectively due to heat transfer loss.
                  v.            It helps to preserve foods like fish and meat.
                vi.            It is used for baking food such as cake and bread etc.
              vii.            The cooker is commonly used to remove moisture, steam liquid of any material that is placed inside it.
            viii.            The cooker can also be used to heat materials to the desire temperature.
1.9       STRUCTURE OF THE REPORT
Chapter 1:introduction, background and justification, aim of research, objectives, motivation, scope and limitation, statement of the problem and significant of the report.
Chapter 2: Will look at literature on implementation of induction steel sensor cooker using microprocessor.
Chapter 3: This involved adopting engineering methodology, then implement the methodology of the research.
Chapter 4: This section will discuss test result, all measurement and analysis will be carried out in this chapter.
Chapter 5:Will state the conclusion, project appraisal, and recommendation the implementation of implementation of induction steel sensor cooker using microprocessor.

No comments:

Post a Comment

undefinedSOLD BY: Enems Project| ATTRIBUTES: Title, Abstract, Chapter 1-5 and Appendices|FORMAT: Microsoft Word| PRICE: N5000| BUY NOW |DELIVERY TIME: Immediately Payment is Confirmed

undefinedSOLD BY: Enems Project| ATTRIBUTES: Title, Abstract, Chapter 1-5 and Appendices|FORMAT: Microsoft Word| PRICE: N5000| BUY NOW |DELIVERY TIME: Immediately Payment is Confirmed