REGENERATION OF USED ENGINE OIL USING ACTIVATED CARBON AS A BLEACHING AGENT
ABSTRACT
This work presents the result on the
regeneration of used engine oil using activated carbon as the bleaching
agent. The used oil undergoes acidification and bleaching processes to
remove the aromatic contents and also improve the color and quality of
the oil. The analysis carried out showed that when the formulated grades
were compared with the standard grade (fresh oil), formulation A
containing 300ml of used oil and 30m1 of sulfuric acid showed a better
quality of regenerated oil among the different formulations with
viscosity of 52. ‘6CP at 40°c, specific gravity of 0.865 and total acid
number of 0.44. Followed by formulation B containing 300ml of used oil
and 50rn1 of sulfuric acid shOwed a better quality of regenerated oil
among the different formulations with viscosity of 40.23cP at 40°c,
specific gravity of 0.784 and total acid number of 0.54, formulation C’
containing 250m1 of used oil and 30m1 of sulfuric acid showed a better
quality of regenerated oil among the different formulations with
viscosity of 38.94cP at 40°c. specific gravity of 0.779 and total acid
number of 0.50, formulation D containing 300ml of used oil and 2Oml of
sulfuric acid showed a better quality of regenerated oil among the
different formulations with viscosity of 36.7OCP at 40°c, specific
gravity of 0.790 and total acid number of 0.55, On the other hand,
formulation E containing 250m1 of used oil and lOmI of sulfuric acid
gave a fair quality because of the low volume of acid used and using
activated charcoal all through.
CHAPTER ONE
INTRODUCTION
Engine or Lubricating oils are viscous
liquids that are used for lubricating moving part of engines and
machines. These oils are derived from petroleum base feed stocks which
mainly consist of complex mixtures of hydrocarbon molecules. According
to these hydrocarbon molecules usually range from low viscosity oils to
high viscosity oil.
Lubricating oils help to protect rubbing
surfaces, reduce friction between moving and connected parts, eliminate
build up of temperature on the moving surfaces and keep the engine
clean.
The main service properties of Engine
oil are their viscosity, properties, fluidity at low temperatures,
chemical stability and protective properties.
Lubricating oils have viscosities ranging from 10 to 1000 centistokes at 100°F to °C Analysis have shown that lube oil consist of aromatics in the range of 4 to 12 % free, sulfur and other impurities depending on the source of the hydrocarbon crude oil process and the production method. The color and odor of lubricating oil are largely caused by the nitrogen, sulfur and oxygen (NSO) compound concentrated in the crude oil and residue fraction. Investigation into the aromatic present in the lube base oil show that the aromatics are in homogeneity with the other compounds in the oil. Studies by America petroleum Institute (API) show that most of the aromatics present in lube base oil arc polynuclear in nature. (Ogbeide, 2011)
The used lubricating oils like the automobile lubricating oils are petroleum derived and originally produced through acid and bleaching treatment, vacuum distillation, solvent extraction dew axing, multiple refining steps and hydro finishing.
However, used lubricating oil are contaminated by contaminants or impurities obtained from undesirable oxidation product of automobile, sediment, metallic wear particles and water degraded additive and hazardous substances from lead compound. This contaminants or impure lubricant is what is drained off cars and disposed off as used or waste oil.
Large quantity of used lubricating oil is generated globally. As at 1996, Nigeria accounted for about 364,166,000 liters of used lubricating oil annually.
It is a common practice in Nigeria that used oil is disposed into gutters, water drains, open plots and farms. This leads to pollution of streams, ground water, lakes and oceans. II has been reported that one gallon of used oil has the potential to contaminate million gallons of fresh drinking water (EPA 530-F-94.-008). Used oil dump on the ground reduces soil productivity and makes the plants growing on the soil to be unsuitable for food. (Cooke, 1982)
1.1 WASTAGE OF THE OIL
Waste engine oil is a high pollutant
material that requires responsible management. Waste engine oil may
cause damage to the environment when dumped into the ground or into
water streams including sewers. This may result in groundwater and soil
contamination. Recycling of such contaminated materials will be
beneficial in reducing engine oil costs. In addition, it will have a
significant positive impact on the environment. The conventional methods
of re-cycling of waste engine oil either requires a high cost
technology such as vacuum distillation or the use of toxic materials
such as sulfuric acid These methods also produce contaminating
by-products which have highly sulfur levels, especially in the Kurdistan
region/Iraq. Lubricant oils have been used primarily for reducing
friction between moving puts of various machinery or equipment, minimize
material wear, and improve the efficiency equipment /machinery and for
fuel and energy savings. Access to lubricant is essential to any modem
society and not only does lubrication reduce friction aid wear by
interposition of a thin liquid film between moving surfaces, but it also
removes heat, keeps equipment clean and prevents corrosion. One of its
important applications includes gasoline and diesel engine oils. Waste
lubricating oil refers to the engine oil, transmission oil, hydraulic
and cutting oils after use. It is also refers to the degradation of the
fresh lubricating component is that become contaminated by metals, ash.
carbon residue, water, vanish, gum , and other contaminating materials,
in addition to asphaltic compounds which resist from the bearing surface
of the engines. These oils must be changed and removed from the
automobile after few thousand kilometers of driving because of stress
from serious deterioration in service.
The amount of lubricating oils that is collected annually in Europe and USA is very large, approximately 1.7 to 3.5 million tons. This large amount of waste engine oils has a significant impact on both economical and environmental aspects. They cost millions of dollars to manufacture and Represent a high pollutant material when disposed of. If discharged into the land, water or been burnt as a low grade fuel, this may cause serious pollution problem because they release harmful metals and other pollutants into the environment. (Weinstein, 1974).
A recommended solution for this issue is the recovery of the lubricating oil from the waste oil. Recycling processes using nontoxic and cost effective material can be an optimum solution. Acid-clay has been used as a recycling method for used engine oil for a long time. This method has many disadvantages; it also produces large quantity of pollutants, is unable to treat modern multi grade oils and it is difficult to remove asphaltic impurities. Solvent extraction has replaced acid treatment as the method of choice for improving the oxidative ability and viscosity/temperature characteristics of base oils. The solvent selectively dissolves the undesired aromatic components (the extraci), leaving the desirable saturated components, especially alkanes, as a separate phase (the raffinate). In one study a mixture of methyl ethyl ketone (MEK) and 2-propanol was used as an extracting material for recycling used engine oils. Although the oil resulting from this process is comparable to that produced the acid-clay method, its cost is high. Expensive solvents and vacuum distillation are required to carry out this method. Recently propane was used as a solvent. Propane is capable of dissolving paraffinic or waxy material and intermediately dissolved oxygenated material.
Asphaltenes which contain heavy
condensed aromatic compounds and particulate matter are soluble in the
liquid propane. These properties make propane ideal for recycling the
used engine oil, but there are many other issues that have to be
considered. Propai4e is hazardous and flammable therefore this process
is regarded as a hazardous process. Also the extraction olves solvent
losses and highly skilled operating maintenance.
Membrane technology is another method for regeneration of used lubricating oils. In this method three types of polymer hollow fiber membranes [polyethersulfone (PES),
plyvinvlidene fluoride (PVDF), and polyacrylonitrile (PAN)] were used for recycling the
engine oils. The process is carried out
at 40 °C and 0.1 MPa pressure. The process is a continuous operation as
it removes metal particles and dusts from used engine oil and improves
the recovered oils liquidity and flash point. Despite the above
mentioned advantages, the expensive membranes may get damaged and fouled
by large particles.
Vacuum distillation and hydrogenation are two other methods that can be used for recycling the engine oil. The Kinetics Technology International (KTI) process is a
combination of distillation and hydro
finishing. This method removes most of the contaminants from the waste
oil. The process starts with atmospheric distillation to eliminate water
and light hydrocarbons. This is then followed by vacuum distillation at
a temperature of 250 °C. The stage is hydrogenation of the products to
eliminate the sulfur, nitrogen and oxygenated compounds. This stage is
also used to improve the color and odor of the oil. The product can be
of quality standard (Gp.I) with a yield of approximately 82% and
minimized polluting byproducts. The disadvantage of this method is the
high investment cost.
1.2 REGENERATION OF USED LUBRICATING OIL
Regeneration of used lubricating oil
simply means the removal of the contaminants or impurities by
sulfonating agents such as sulfuric acid, oleum or sulfur trioxide.
About 80 % of the aromatics and other impurities are removed in the
first circle while the remaining 20 % are removed in the second cycle of
the operation.
During operation of engine, lubricating oil temperature builds up and degrades the oils leading to decline in important properties like: viscosity, specific gravity and flash point. Aside this dirt particle and worn out metal parts from engine surfaces are deposited into the oils. With the passage of time, this engine oil loses its functional properties and must be replaced with fresh lubricant Considering the fact that huge quantity of lubricating are oils used on daily basis, the frequent dumping of lubricating oils has now become a source of serious concern. It is on this premises that most countries of the world are presently paying serious attention.to the menace of environmental degradation caused by the disposal of waste or used lubricating oils. (Schmitz, 2003).
The rapid depletion of fossil fuel reserve which provide feedstock for the production of lubricating oil in Nigeria, shortage of fresh oil, increasing prices and high demand for lubricating oil have necessitated most industries and private users to seek or adopt ways of regenerating the oil.
Hence, this work is aimed at
regenerating used engine oil using industrial bleaching earth and
activated carbon as the bleaching agent. In this work, acid and
bleaching treatment will be highly emphasized.
1.3 RECYCLING
Unlike the 1885 ancestors, the
challenges for the design of modem car engines were meeting the emission
requirements, increased speeding, engine weight reduction, production
cost reduction, operating cost and fuel economy, then oils are not oil,
just as the modem automobiles have advanced from raw base oil to pre —
1947 to those containing additives to help achieve the performance
advantage required by the modem automobile.
1.3.1 IMPORTANCE OF RECYCLING USED ENGINE OIL
Used engine oil is incredibly toxic
stuff and a gallon can contaminate one million gallon of water as well
as rendering the soil in capable of sustaining plant life. Used oil
doesn’t wear out, it just gets filthy. It can be cleaned of contaminants
and recycled continuously. The dirty oil goes through the same refining
process as oil that is extracted from wells, so it’s exactly a “a
green” process, but it doesn’t have the added environment impact of the
extraction.
1.3.2 RECYCLING PROCESS
The recycling process is as follows:
- Removal of any water
- Filtering to remove solid and additives
- De — asphalting to remove bituminous contents
- Distillation
1.4 AIM AND OBJECTIVE
The aim and objective of the study is aimed at assessing the recycling of used engine oil.
The need for conservation of crude reserves.
Minimizing unemployment through construction of used lubricating oil recycling plant.
The elimination of environmental pollution source of used lubricant.
1.5 SIGNIFICANCE OF THE STUDY
Many people are aware that old engine
oil shouldn’t be dumped, but recycled. Unfortunately, up to 100 million
litres (approximately 26.4 million used gallons) of the
stuff is improperly disposed of each year in Autralia alone,
According to the Department of the Environment, Water Heritage and Arts.
The global figure would be staggering used engine oil is dumped as
house hold trash, used as weed killer, pour in ditches, left laying
about or illegally dumped.
SOLD BY:
No comments:
Post a Comment