INVENTORY MANAGEMENT AND CONTROL SYSTEM
(A CASE STUDY OF LOREMM HOTEL NASSARAWA, NASSARAWA LOCAL GOVERNMENT)
Abstract
Inventory management and control system
is a tool used in the store department to manage its inventory by the
store officers together with other detailed list. Information is stored
for maintenance purpose in order to effect administration and decision
making in the store department. This project shows the type of goods
available, how they are purchased, and the method of ordering, how they
are maintained in the central store of loremm suite and fitness center
Nassarawa.
CHAPTER ONE
1.0 INTRODUCTION
The need for “inventory management and control system” in LOREMM HOTEL cannot be over emphasized.
Firstly, it is necessary to know what an
inventory management is all about. The inventory control system can be
described as the utility equipments, drugs, furniture and other
equipment used in an office. The inventory management system is designed
in order to control the products by keeping them in a good place with
adequate maintenance. Hence in the LOREMM hotel as the case may be, the
management is concerned with entry of stock into store sections. That
is, the way they are collected, ordered and how it is distributed to
various departments and sections each according to what is needed at
that particular time while other stock is still being ordered into the
store. At this particular time it is necessary to carry out maintenance
in other to control the stock within the department store, therefore the
topic “inventory management and control system” is a way of making work
(things) easy, faster and accurate etc because the use of computer is
called upon, the need to appreciate the new trend in information
technology is very necessary.
1.1 BACKGROUND OF THE STUDY
The need for inventory management and
control system is any organization/ institution has been considered from
the fact that there is a need for management system in terms of
resources allocation along side with booking of rooms of users. In other
words the uses of computer system, is help reduces total dependability
on the manual stuff and above all, it produces a machine oriented and
error free process. This new development could be seen a welcome idea
since the keeping of records of such inventories in terms of ordered,
collection and distribution on daily basis are kept considering the
aforesaid. It is all about implementation that inventory management and
control system will then increase the effectiveness efficiency and
distribution of daily records keeping of stock room.
1.2 STATEMENT OF PROBLEM
Manual system is the current
method/system used in LOREM HOTEl Nasarawa. This implies that everything
has been done with hard labour in terms of carrying out so many
activities such as equipment Furniture and fittings general maintenance
and rehabilitation in the HOTEL department/sections as a whole. The
department management is faced with following problems.
i. Time consumption
ii. Illegal access by unauthorized users
iii. Inaccurate keeping of events records
iv. Error in keeping of information(records)
v. The use of computer in dairying out duties/function is not in use (not important) since the establishment of LOREMM HOTEL.
ii. Illegal access by unauthorized users
iii. Inaccurate keeping of events records
iv. Error in keeping of information(records)
v. The use of computer in dairying out duties/function is not in use (not important) since the establishment of LOREMM HOTEL.
1.3 AIMS AND OBJECTIVES OF THE STUDY
The aim and objective of this study is
to develop a software package that will maintain a system which will
manage the event and the total cost to the hotel. They are as follow:-
i. To facilitate decision making
ii. To know the total stock allocated to various sections of the hotel at a particular given period of time.
iii. To ease the hotel department and sections on its effort to carry out maintenance and rehabilitation of the hotel assets.
iv. Proper documentation of staff records and supply orders to various sections and to the other departments of the hotel
v. The period between orders to secure and keep appropriate control of the hotel assets is to go by online system.
1.4 SIGNIFICATION OF THE STUDY
It is believed that after the completion
of study, a lot will be achieved and the following benefits shall be
deduced. To achieve the below mention benefits, the staff will know the
proper channel (medium) used in gathering items that are needed from the
store which will also trigger the management to give more priority
attention and a listening in setting up an inventory management and
control system. The benefit includes:
i. The staff will be relieved of manual recording system
ii. The use of inventory management control system will be faster and easy for jobs to be executed
iii. The HOTEL management will be poised to know the total assets available.
iv. This will also help in minimizing fraud.
1.5 SCOPE/LIMITATION OF THE STUDY
Most of the research work is faced or
confronted with a gigantic number of problems and therefore the
following problems were encountered. There is no available past record
to lay hand. If there is the time given to worker for use as a guide is
too short. Hence the available one’s are not enough to get any from the
HOTEL library in Nasarawa. Finally the cost of materials needed for this
study contributed immensely in limiting and set back of the study.
1.6 RESEARCH METHODOLOGY
This research or study in particular
makes use of questionnaire which was dim necessary to collect data and
information that can be used in the manipulation of a computer program
in respect to inventory management and control system and any other
organization in need.
The questionnaire was well designed and
structured to explain the information that was brought to encourage it
disclosure more so, the observation method of data capturing or
collection is also carefully examined and observed the problems and a
possible solution to it. Oral interview (face to face) communication
between the researcher and respondent and other information where
involved.
1.7 DEFINITION OF TERMS
Inventory: This is the
collection of useful and valuable items as a field used in the process
of production. The production involved the creation of utilities in
satisifying human want. These goods could be consumed in the production
of other goods so as to make it available for use.
Inventory cost: This is the measurer of the value of input in the acquisition of materials in the present condition and location.
System code: This is the period of time between the ordering and replenishment of inventory.
Management: Is the act of running and controlling a business or an organization.
Internal control: This is the whole system of control (ie financial or otherwise established by enterprises in an orderly manner).
Maximum stock: This is the level used as an indicator, which indicates what stock is too high.
SOLD BY:
No comments:
Post a Comment