EFFECT OF DIFFERENT CARBON SOURCES ON THE GROWTH OF ANTIMICROBIAL PRODUCING Bacillus Species IN Citrillus vugaris.
ABSTRACT
Effect of different carbon sources on
the growth of antimicrobial producing Bacillus species in ogiri-egusi
sold in Ogbeta, Orie, Artisian, Kenyatta, Enugu State were evaluated
using standard microbiological and analytical methods. 12 bacteria were
isolated and identified such as Bacillus subtilis,(33.33), Bacillus
pumulis (41.66), Bacillus licheniformis (25) were identified based on
their colony biochemical characteristics.The isolates of the highest
occurrences is bacillus pumilus. Agar well diffusion method was used to
determine the antimicrobial activity against two pathogenic organisms,
Escherichia coli, Staphylococcus aureus. Bacillus subtilis and Bacillus
pumulis, gave a zone of inhibition Escherichia coli 0.6mm and 0.8mm
after 24 hours of incubation also carbon sources of 5% and 10% sucrose,
Glucose and soluble starch were used to check their different carbon
sources on the isolates using the spectrophotometer.5% had the highest
optimum growth of 1.400 for glucose 1.545 for sucrose,2.376 for soluble
starch which can be added in maximum quantity to a medium to produce
antibiotics.
CHAPTER ONE
1.0 INTRODUCTION
Traditional fermented condiments
(OGIRI-EGUSI) based on vegetable proteins are consumed by different
ethnic groups in Nigeria, have been the pride of culinary traditions for
centuries. It is evident that these products have played a major role
in the food habits of communities in the rural regions serving not only
as nutritious non-meat proteins substitute but also as condiment and
flavoring agents in soup.
Traditional methods of manufacture
should take advantage of biotechnological progress to assure reasonable
quality and at the same time assure safety of these products. The
requirements for a sustainable biotechnological development of Nigerian
condiments are discussed in the scope of the microbiology and
biochemical changes of the raw materials. Fermented vegetables, proteins
have potential food uses as protein supplements and as functional
ingredients in the fabricated food (Achi. 2005).
Seeds of legumes may account for up to
80% of dietary protein and maybe the only source of protein for some
groups. Their cooked forms are eaten as meals and are commonly used as
fermented form as meals and are commonly used in fermented forms as
condiments to enhance the flavors of food (Odunfa, 1985). With high
content of protein, legume condiments can serve as a tasty condiment to
sauce and soups and can substitute for the food flavoring condiments are
prepared by traditional methods of uncontrolled solid subtract
fermentation resulting in extensive hydrolysis of the protein and
carbohydrate components (Fetuga et al. 1973).
Fermented foods are essential parts of
the world, particularly African (Odunfa. 1985). Fermentation is one of
the oldest and most economical methods of producing and preserving foods
in developed countries (David and Aderibigbe 2010). In Africa, many
proteineous oily seeds such as cotton seed (Gossypium hirsutum), African
locust bean (Parkia) and melon seed (Citrillus vulgaris) are fermented
to produce soup condiments (Odunfa, 1981), which give pleasant aroma to
soups and sauces. In many countries especially Nigeria and India where
protein calories. Malnutrition is a major problem, these condiments
serve as food source of energy, low cost protein and fatty acids in
diets (Odumodu. 2007).Ogiri is an oily paste produced by fermented melon
seeds (Citrillus vulgaris) in the western part of Nigeria. Oyenuga
(1986) have the composition of melon seed.
A melon seed has high protein and low
Carbohydrate content. Citrullus vulgaris is a member of the family
Cucurbitaceae (Alfred, 1986). Ogiri is characterized with very strong
pungent odour. Among the consumers, there are preferences fir Ogiri
produced from specific locality. The production process being a local
art makes the quality varies. The fermented products are also stored at
ambient temperature (28+2) oC. For varied length of time (days or
weeks). The population and types of micro organisms involved during
fermentation and storage could have affected the quality of the product.
Fermented foods are essential parts of
diets in all parts of the world particularly Africa (Odunfa, 1985).
Fruits, vegetables, cereals, root crops, legumes and oil seeds are used
in the production of fermented food. Fermentation is one of the oldest
and most economical methods of producing and preserving foods in
developing countries (David and Aderibigbe, 2010).
In Africa, many proteinaceous oily seeds
such as cotton seeds (Gossypium hirsutum), castor bean (Parkia
biblobosa) and melon seed (Citrullus vulgaris) are fermented to produce
food condiments (Odunfa, 1981 ), which gave pleasant aromas to soups and
sauces. In many countries especially Nigeria and India where
protein/calories malnutrition is a major problem, these condiments serve
as good source of energy, low cost protein and fatty acids in diets
(Odumodu, 2007). Thereby, supplement the nutritive quality of the
respective diets where they consumed Ogiri is one of the condiments
consumed in the Eastern and Western parts of Nigeria especially by the
Ibos. Ogiri is an oily paste produced by fermenting melon seeds
(Citrullus vulgaris) in the Eastern and Western parts of Nigeria.
Oyenuga (1988) have the composition of melon seed to be dry weight
(88.9%); crude protein (32.6%); ether extract (50.2%); crude fibre
(3.7%); silica free ash (3.45%). Minerals (mg\100g) content of shelled
melon seed were Calcium(112); Phosphorus (1777); Magnesium (578);
Potassium (538); Sodium (5); Chlorine (32); Vitamins (N/g); A (30.65); D
(11.20) and E (0.25). Melon seed has high protein and low Carbohydrate
content. Citrullus vulgaris is a member of the family cucurbitatea
(Alfred, 1986).
Ogiri is characterized with very strong
pungent odour. Among the consumer, there are preferences for Ogiri
produced from specific locality. The production process being a local
art makes the quality of the product varies. The fermented products are
also stored at ambient temperature (28.2+2)oC for varied length of time
(days or weeks),(David and Aderibigbe, 2010). The population and types
of micro organism, involved in fermentation can result in food
poisoning. Others are responsible for producing antibiotics (Obeta,
1983).
1.1 AIM AND OBJECTIVE OF THE STUDY
1) Isolation of antimicrobial producing Bacillus species in Citrullus vulgaris
2) To elucidate reasons data for preferences in ‘Ogiri’ from the four different market in Enugu town.
3) To identify the characteristic ability of microorganisms responsible for fermentation of Citrillus vulgaris to produce Ogiri
4) To identify the potential microorganisms and to study the effect of different carbon sources on isolates.
CHAPTER TWO
2.0 LITERATURE REVIEW
Fermentation is a process where food
substrate is transformed by micro organisms to obtain a better final
product: nutrition, hygiene, stability, odor, color, taste,
digestibility, safety. (Jacobsen et al. 2007).
Food is fermented for many reasons which include;
a) Improvement of sensory characteristics by development of diverse flavor and aroma compounds.
b) Improvement of safety; absence of toxins and partial and/or complete elimination of antimicrobial factors.
c) Increase of nutritive value through
the breakdown of proteins, carbohydrates and lipids to essential amino
acids easily, digested sugars and essential fatty acids. It also brings
about synthesis of some vitamins.
d) Decrease in cooking time and thereby fuel requirement.(Jacobson et al. 2007)
2.1 TRADITIONAL FERMENTED FOODS
Fermented foods are defined as potable
products, which are prepared from raw or heated materials and which
acquire their characteristic properties by a process that involves
Microorganisms micro-organisms (Bucken Huskes, 1993). Fermented
condiments give pleasant aroma to soups and sauces in many countries
especially in Africa and India where protein calorie malnutrition is a
major problem (Sarker et al. 1993).
They also have great potential as key protein and fatty acid sauces and are good sources of gross energy.
SOLD BY:
No comments:
Post a Comment