DEVELOPMENT OF DOCUMENT ROUTING SYSTEM ONLINE APPLICATION AND APPROVAL OF LOAN
(A CASE STUDY OF ACCION MICROFINANCE BANK LAGOS)
ABSTRACT
An online loan website would allow
AccionMFB to access online application, website, application information
from any convenient location, using a single user ID and password. They
would be able to do transactions online. The central goal of this
initiative is to transform the day-to-day operations of the Bank by
reducing paperwork; putting information services and transaction online;
streamlining access to information, applicants results and content.
Making it easy for applicant’s to find and use online services, and thus
increasing the likelihood that the Bank can attain the strategic goals
laid out in this initiative. I used a combination of surveys, focus
groups, and one-on-one interviews to gather information from Accion MFB,
staff, and from key personnel at other institutions that have related
system.
CHAPTER ONE
INTRODUCTION
1.1 Background of study
The need to develop document routing and
tracking system has given rise to automated methods of solving such
problems. Necessity has inspired man to develop the information and data
processing technique we now use to provide required information as
quickly and as economically as possible. This is because once a firm
begins to expand, the information requirements expands proportionally
too.
Document routing and tracking have the
characteristics of input, processing, output and feedback. If we
consider a microfinance bank as a system of subsystems, we may discover
document routing system has been a manual process subject to all the
traditional business problems. Documents get lost, there is no personnel
accountability and it takes way too long. An attempt to determine its
status is the definition of absolute inefficiency. Most large
organizations use a computerized executive documents management system
(EDMS) to manage the tracking and transfer of files prepared for senior
management.
The document tracking will keep track of
who is responsible for the file, who has it at any given time, when it
is due to arrive at the next step in the process, and whether it is
overdue in arriving there.
The document tracking also controls the
movement of the e-file of the document itself. When the hardcopy of a
file moves to another office, the e-file of the document itself is
transferred to that office at the same time.
At that point, no other office is able
to modify the e-file. Until the file is transferred elsewhere through
the EDMS, that office alone is responsible for:
- Reviewing whatever action has been requested or taken to date; and
- Prepare documents as needed.
However, this work concentrates on the
loaning aspect of the document routing and tracking system in general
and the application in particular. Various manual systems and devices
have been used in time past in collection of loans by customers. The
most recent of such devices is the computer with an advantage of speed
and accuracy over the previous devices.
In view of this, certain information
about the customers are stored in a database- a collection of related
fields; and this data is manipulated to give rise to the loaning system.
The need for this medium of application is for approval/transfer of
document at a faster rate than before has been highly called for. The
computer programmers aim at ensuring that the application by customers
is processed on time in the computer to generate an effective loaning
system for the microfinance bank.
1.2 STATEMENT OF THE PROBLEM
The manual system involves storage of
paper files, recording on kalamazoo forms and the cumbersome
computations of numerical quantities.
Having colobrated to an extent what the
manual sytem entails and depicts, we can call look at the weakness of
this system that we can trade off for some method that is more
rewarding. The disadvantages of this system include duplication of files
and records insecurity of data that can arise through fire, theft,
sabotage, etc.
Apparently, there arises delay in processing. Data is difficult to retrieve due to bureaucracy.
Computation of numerical quantities could be cumbersome and error prone since they are done by humans.
Data mutilation may arise as files move
from one hand to the other in the department. All this problems have
risen and are still playing in the organizations still using the manual
system.
Hence, in identifying these problems, I
was able to clarify the new systems objective and users, desire outputs,
and desired processing.
1.3 Objectives of study (elimination of manual loan program)
The objectives of this research is to develop a system that will Eliminate manual loan program
To make it easy for applicants to apply for loans from the comfort of their home and also from any location in the country.
To enable online approval of loan.
Make it easy for grouping of applicants to their respective categories they fall under.
1.4 Significance of study
Viewing critically the inefficiencies in
the manual loan system presently in Accion MFB, the need to develop
online loan approval that will handle such inefficiencies cannot be over
emphasized.
1.5 Scope of study (The computerized system)
Due to the complexities and rigors that
assail the manual system, the computerized system is used to solve our
manual loan problems. It was improved to be a great improvement on the
manual system. The computer system is the series of programs, which will
be used to process the data available with an aim to solve the problems
at hand. It is designed to curtail the ineffectiveness inherent in the
old system (manual system). It is an improvement or manual system
because it takes care of the problems encountered by the manual system.
1.6 LIMITATION OF STUDY
I encountered numbers of constraints that made this research difficult to get beyond this scope. This constraints includes:
1. Length of time for development
2. Integration of existing services
3. Inadequate data supply by the bank
4. Lack of good internet connection
2. Integration of existing services
3. Inadequate data supply by the bank
4. Lack of good internet connection
1.7 Definition of terms
Document routing system: Document
routing is a manual process subject to all the traditional business
problems. Documents get lost, there is no personnel accountability and
it takes way too long. An attempt to determine its status is the
definition of absolute inefficiency. The Document Routing System (DRS)
provides automated document routing to the user.
Document tracking system:
This keeps track of who is responsible for the file, who has it at any
given time, when it is due to arrive at the next step in the process,
and whether it is overdue in arriving there.
Loan: Money lent at interest, something lent for the borrower’s temporary use.
Lend: To give for
temporary use on condition that the same or its equivalent be returned.
To give the assistance or support of afford furnish ‹a dispassionate and
scholarly manner which great force to his criticisms — to adapt or
apply (oneself) readily accommodate ‹a topic that itself admirably to
class discussion.
Automation: The
replacement of human workers by technology. A system in which a
workplace or process has been converted to one that replaced or
ministries human labour with electronic or mechanical equipment.
Online: connected via computer attached to or available via a computer or computer network.
Database: Any collection of data organized for storage in a computer memory and designed for easy access by authorized users.
Database update: This simply means applying and maintaining changes on a database after data must have been added, removed or modified.
Database update: This simply means applying and maintaining changes on a database after data must have been added, removed or modified.
SOLD BY:
No comments:
Post a Comment