DETERMINATION OF ACTIVE SWEET COMPONENTS OF COMMON ARTIFICIAL SWEETENERS THAT ARE USED AS REPLACEMENT FOR SUGAR
ABSTRACT
This research investigated how the
sweetness of sugar substitute compares to the sweetness of sugar. In
this research different percentage solution of sugar, artificial
sweetener and natural sweetener (10%, 1%, 0.1% and 0.01%) were prepared.
Ten volunteers were gathered for the sensory evaluation in this case
tasting of the solution, the volunteer‟s taste threshold of data was
gotten. The artificial sweetener was found out to be the sweetest among
the substances experimented and at the percentage of 0.1% and 0.01%
saccharin an artificial sweetener was able to mimic the taste of sugar.
Research prove that artificial sweetener are non-nutritive they have
virtually no calories in contrast to sugar which contains 4 calories at
each gram, a teaspoon of sugar is about 4 grams, for weight lose
artificial sweetener may be an attractive option to sugar. Artificial
sweetener may also be a good alternative for diabetic patient, unlike
sugar; artificial sweeteners generally don‟t raise blood sugar levels
because they are not carbohydrates.
CHAPTER ONE
1.0 INTRODUCTION:
A sugar substitute is a food additive
that duplicates the effect of sugar in taste, usually with less food
energy. Some sugar substitutes are natural and some are synthetic. Those
that are not natural are in general, called artificial sweeteners.
Artificial sweeteners and other sugar substitutes are found in a variety
of food and beverages marketed as sugar free or diet including soft
drinks, chewing gum, jellies, baked goods, candy, fruit juice and
ice-cream and yoghurt. [Whitney 2011].
People may not all like the same kind of
baked treats but one thing we all agree on is that baked treats should
be sweets usually, sugar is used to lend sweetness to foods but would
cake taste just as good if the baker used a sugar substitutes instead of
sugar? Many people prefer not to use sugar often due to health reasons
and instead depend on sugar substitutes to sweeten their foods. But are
sugar substitutes the same as sugar? What exactly are the differences
between sugar and sugar substitutes?
Sugar also known as sucrose comes from
plants like sugar cane and sugar beets and is a carbohydrate. Sugar adds
bulk to cakes, cookies and all kinds of treats; sugar also causes
browning and caramelizing in foods when it is heated as when cookies
turn golden brown in the oven sugar is a natural substance, something
that our bodies can use for energy.
Sugar substitutes come in three
categories; artificial sweeteners, sugar alcohols and natural
sweeteners. Artificial sweeteners are attractive because they add almost
no calories to foods and are sometimes a part of weight loss programs.
Also they do not increase blood sugar levels which mean that diabetics
can use them. Many artificial sweeteners like sucralose were discovered
by accident in the laboratory. In 1976, a scientist in England was
studying different compounds made from sugar. The scientist asked a
student to test the compounds but instead the student tested them.
Another category of sugar substitutes is sugar alcohols. Sugar alcohols
are not alcoholic beverages they do not contain ethanol which is found
in alcoholic beverages. Sugar alcohols like sugar have calories and
energy but not as much as sugar. Sugar alcohols like artificial
sweeteners do not contribute to tooth decay and affect blood sugar
levels slowly so diabetics can use them. Although sugar alcohols like
xylitol, sorbitol and erythritol are manufactured products the sources
are often natural.
The last category of sugar substitutes
is called natural substitutes. The categories include maple syrup, agave
nectar and honey. These substances are absorbed by our digestive system
and contain calories and nutrients that our bodies can use. [Michelle
2002]
1.1 AIM AND OBJECTIVES OF THE STUDY
AIM: To create an alternative to sugar by replicating the sweetness found in natural sugar.
Objectives:
- To determine how the sweetness of sugar substitutes compare to the sweetness of sugar. In this research sugar and sugar substitutes will be tested and the sweetness will be compare in relation to sugar.
- To compare the availability and affordability of the active components in the artificial sweetener and sugar
- To know the components of this artificial sweetener and what makes them taste sweet
Artificial sweetener mimicking the taste of sugar will be a better alternative to people who are suffering from diabetics. Unlike sugar, artificial sweeteners generally don’t raise blood sugar levels because they are not carbohydrates.
CHAPTER TWO
REVIEW OF LITERATURE
2.0 TABLE SUGAR (SUCROSE):
Sugar was brought to the Americas by
Christopher Columbus. At the time, sugar was processed by boiling the
cane juice and then harvesting the crystals left behind after the water
evaporated. These crystals contained protein, fiber, vitamins and
minerals. Sugar is generally extracted from plants sugar beet and sugar
cane or a main ingredient in many foods and recipes available as sucrose
or saccharose (household sugar), lactose (milk sugar), fructose (fruit
sugar), glucose (dextrose). [Abishak, 2009].
SOLD BY:
No comments:
Post a Comment