DESIGN AND IMPLEMENTATION OF A COMPUTERIZED FARM MANAGEMENT INFORMATION SYSTEM
( A CASE STUDY OF A PIGGRY FARM)
ABSTRACT
In this study the researcher aimed at
computerizing piggery farm management information system. A piggery farm
is a kind of farm management where pigs are been reared and care for,
for the purpose of production to do this the researcher under want a
thorough interview where she was able to discover some problems
associated with the existing system of management information system
which is manual system. This problems have been hindering the growth of
the management till date and that is what called for this research work
(computerized farm management information system). The
attempt of other researchers, authors are reviewed to know their
opinions patterning this computerized farm management information
system. Oral interview were used to connect the datas needed for this
research work, and to researcher also added some of observation made
during the collection of datas. In the chapter three, the researcher
described and analysis the existing system in order to tackle the
problems in the existing system. Chapter 4 and 5, the new system were
designed and implemented to replace the old / existing system which is
manual system. Finally, the researcher summarized the findings from the
data gotten. And resolved into making some reasonable recommendations
before concluding the work at last.
CHAPTER ONE
1.0 INTRODUCTION
Diggery farm is a part of animal section
in NIGERIA PRISON AGRICULTURE PROJECT, STATE COMMAND ENUGU (NPAPSE)
Agriculture itself is a science of farming. It can be practice for
either animal production or crop production purposes. This study is
based on farm management information system” a case study of a piggry
farm. Piggry farm is an example of animal farm which is practiced for
the purpose of animal production. Before a piggry farm could stand,
there must be a boar at least, sow / sows, pockers and piglet of
different stages.
Once more the direction intention of
this project is to computerize farm management information system have
been operated manually. Mis in this organization was essentially
operated with a great deal of human efforts, and infact the activities
of the organization in this system is less challenging, less complex and
hence organizations do this extents small sized. Management information
systems remain the system that aim at providing information for the
management on a regular basis. This call to mind the time value of
information which implies that when the required information is received
behind the period it will be used, the information become useless. Mis
dries to inform the manager how to provide the information.
Management always aim at reaching the
climax in the decision performance fort attainment of organizational
objective but this existing system could not attract such performance
due to the lack of effective information tool which can provide the
management with quality and needed information and at needed time. This
system always result to information over local which actually decreases
the decision performance in any management. Information they say is
power. Quality information is very vital do check in organization. The
only information tha can accelerate the management decision performance
is the information that process the good quality of information. Such
qualities of information comprises:
- Relevance
- Accuracy
- Completeness
- Reliability
- Timeliness
Despite these qualities management
cannot achieve their objectives. The decision performance also depend on
the manager himself. The manager must be able to identify problem,
define the problem, analyse it and suggest a possible solution to the
problem. And for manager to do these, he must be backup with
informations required.
Due to the above mentioned faults and
errors associated with the existing system of management information an
alternative system is suggested which is a computerized farm management
information system.
The technology have created an
interesting opportunities for all managers and as the technology is
growing the researcher demand it necessary to let the blowing wind reach
the farm managers (piggry farm managers) in their management
information system. A software is developed to replace this manual
operation of Mis. This form of software is an expert system.
Computerized farm management information
system is a software package that contains a lot of files and records
the file that was designed in detail is a sales file which each of it
record consist of files like varieties of pigs, quantity, price, weight,
subtotal, total amount grand total etc.
1.1 BACKGROUND OF THE STUDY
Nigeria Prison Agriculture Project,
State Command (NPAPSCE) stated its operation in Nigeria Prison State
Command Enugu between 1980-1981 under the management of MRS MARIA
EBUCHE. NPAPSCE started it operation with about three kinds of animals
sections, poultry department and crop department. As Nigeria Prison
State Command seems to be a world of its owner, the manager (DSP) did
not relent at all instead he worked indefatigably expand and introduce
other animals to the animal department
Around 1990, there came the expansion of
the organization / management. That was when the idea of introducing
piggry farm section was accepted in anticipation of the management goals
achievement. This led to the origin of piggry farm in this management.
The piggry farm they said has provide worthwhile, it has contributed a
lot to the labor market and to the management itself. The piggry farm
are divided into subsection headedby DSP (manager). The sections are.
(1) Boar Section
(2) Sow
Section
(3) Pocket Section
(4) Piglet Sections.
The management is also divided into management sections. Thus.
(1) Stock keeping (2) Feeding (3) Maintenance
(4) Health care,
(5) finance, (6) Accounting
(7) Marketing and Sales
Piggry Sales management is discussed in detail here.1.2 OBJECTIVE OF THE STUDY.
The objective that led to this research
work is basically to expose the Nigeria farmers in general and
especially NPADSCE farmer manager with the effective, efficient,
accurate and timely form of management information system. That is to
replace manual mis with computerized Mis. The researcher hope to achieve
the following after this research thus
- To equip all the manage with quality information on regular basis.
- To eliminate the steady decline in the management.
- To autonate all the activities of Mis
- To accelerate decision performance
- To design an expert system.
1.3. STATEMENT OF THE PROBLEM
It is very unfortunate that the
technology potentials has not been fully or even adequately realized in
the field of farm management information. Very little farm managers has
grabbed this powerful it opportunities. This has put managers and
researchers behind. Some of the problems militating against high
decision performance and achievement of management goals are as follows:
- Lack of quality information tool.
- Lack of specialist in the field. Lack of technical – known how.
- Lack of sufficient fund
- Poor service render by the government
- Poor perception of economic benefit.
- Management decline
- Immobility etc.
1.4 SIGNIFICANCE OF THE STUDY
In the event of the above mentioned
faults and errors discovered in the manual system. It is believed that
the introduction of a computerized system of Mis will change the whole
thing positively. It will totally eliminate the inherent problem which
will in turn bring about immense cash value to Nigeria Prison State
Command, Enugu and to all farm managers in Nigeria.
It will definitely expose and enlighten
the staff and managers of farm in NPAPSCE on what they supposed to know
about their management. In addition, it will bring about more noticeable
contribution and improvements to both the headquarters and other
branches nationwide to be able to defined their problems and find out
large on the favourable side.
Through the researcher restricted the
study to NPAPSCE, the result of the findings will let of immense
benefits to all Nigeria farm managers and as well to students conducting
similar research work on the same or related topics.
1.5 SCOPE OF THE STUDY
In the study of this nature, one would
like to accumulate information from many areas, But, in the view of the
time given for this research such a wide range could not be reached. The
researcher therefore, concentrated on the sales management information
of pig in Nigeria Prison Agric Project state command Enugu. The choice
of sales Mis was due to the time factor.
1.5 METHODOLOGY
The source from which the necessary data were elicited for carryout this research work is basically from primary source.
The researcher underwent a thorough interview, the farm manager Mrs
Maria Ebuche was interviewed and she was kind enough to respond to the
interview questions. Finally, informations were elicited from the
observation techniques during the investigation.
1.6 DEFINITION OF TERMS
Terms associated to this topic are to be define below. Thus.
ASP
– Assistant
superintendent of Prison concerning Piggery farm management. ASP is an
assistant manager in the management.
AIP –
Assistant Inspector of Prison. He is a person who visit all department
to check rules are being obeyed and standard and acceptable. He checks
to ensure that things are going on fine.
Boar – This a male pig that has grown to a point that can pregnant a sow.
Confine System – This is type of
management system that does not interact with the system’s environment.
The pigs under this system are controlled they are not expose to the
environment, their feeding and all management are controlled by a prison
or persons.
Computer – A machine used in modern times in organization and homes do manipulate data.
DSP – Deputy Superintendent of Prison.
This is a person that oversees what is going on in the management. He
controls, arrange, organize, plan, manage and makes decision in the
management.
Data – Is a row fact that has no meaning.
Database – A collection of interrelated data stared with controlled redundancy to serve one or more application.
Information – Information is a data that has been evaluated. It is a processed data.
Information Overload – A situation which
the sheer amount of information in an system is simply too great to be
coped with by the information management available. It is overflow of
information which slow down decision performance.
Information system-
A systematic way of organizing the handling of
information, from information gathering to information retrieval and
use.
Management
– The process of procuring, allocating,
combing and utilizing or organizational resources expressed usually as
3ms (men, materials and money) through planning organizing directing and
controlling activities of work of the organization member to reach
certain stated objectives.
Management Information System – Mis is
an integrated and holistic reporting network system in an organization
that provides planning and controlling information for effective
decision making.
Mobility – This ability of information to move from one point to another, from one person to another easily and timely.
Open System – This a system that
interact with its environments. The pigs reared in this system are
always expose to the environment, its feeding and every other thing
about the management is not controlled
Pocker – A pig at the sluter stage.
Piglet – Young pigs. That is the earlier first stage of pigs.
System – It is a collection of
interrelated and interdependent procedures that are joined together to
perform an activity or a task.
Software – The programs that control the
computer operation the system programme controls the hardware component
of computer which application program controls task performed by
computer.
Sow – The female pig.
1.7 THESIS / PROJECT ORGANIZATION
This project is more or less organized in seven chapters which includes
CHAPTER ONE: This introduces you to the
topic, runs through the background of the study, problem statement,
objective, scope of the study, method of investigation adopted and terms
definitions
CHAPTER
TWO: The ideas
opinions and contribution of other researchers and authors were review.
CHAPTER THREE: Is about description & analysis of the existing system.
CHAPTER FOUR / FIVE: These handle the design and implementation of the new system
CHAPTER SIX –
SEVEN: In these chapters the work was
documented, concluded and finally, recommendation and reference were
made.
SOLD BY:
No comments:
Post a Comment