DESIGN
AND IMPLEMENTATION OF A DIGITAL LIBRARY SYSTEM
ABSTRACT
Libraries
have been an important part of educational and information sector of any
school. The success of any library largely depends on proper management.
Several libraries have suffered failure as a result of inadequate management
and incapacitations in handling sensitive information as regards members of the
library. This research therefore, aimed at developing a digital library system,
which will help direct and position library to meets its ever increasing
demands. In the course of the development of this new system, the current
system was analytically and critically studied or assessed and thus the
identified strengths and weaknesses were highlighted and a new system was
designed for the weakness. The present system was analyzed using a standard
procedure recognized worldwide for such purpose and this is called Structured
System Analysis and Design Methodology (SSADM). The visual basic 6.0
programming language was used to code the program modules developed for the
system using some computer aided design tools.
CHAPTER
ONE
1.0 INTRODUCTION
Digital
Library System (DLS) extends and integrate approaches adopted in traditional
libraries as well as in distributed information systems, to yield high-end
information systems, services and institutions. Here we will explore some of
the parts or components of digital libraries and discuss several of the developments
in this emerging field.
Building a comprehensive digital library system will
help users to manage all phases of the information lifecycle. Of
particular importance is to simplify the authoring and creation process so that
wider population can participate by adding all types of multimedia content
directly into digital libraries. Downstream access allows readers to benefit
from this type of computer-mediated communication, across time and space.
Ultimately, it is believed that knowledge will be shared and then lead to yet
another cycle of discovery, authoring and utilization that is facilitated by
digital libraries.
1.1 BACKGROUND OF THE STUDY
Times are fast changing; we now live in a jet age which is
mainly characterized by rapid changes in technology, lifestyle and value. This
is indeed an age of information explosion.
One of the major inventions that have driven the world to a
fast pace of technological advancement is the computer. The computer is
primarily an electronic information processor that is rapidly changing the way
we acquire, organize, recall, access, analyze, synthesize and apply
information. The effectiveness with which the information is generated and
communicated determines the rate of progress of a society and the fulfillment of
its people. Modern society is information driven and information today is a
universal need.
Moreover, computers have affected the ways which people use
information. It has changed the rate of work done, the method for accomplishing
the work alongside the relationship among the people carrying and using the
information. However, computers and libraries are not left out in the
utilization of computer to carry out their day-to-day activities especially as
it concerns the amount of information generated. Libraries have evolved over
the years which gave rise to digital libraries.
1.2 STATEMENT OF THE PROBLEM
There are numerous problems with the traditional libraries.
These in-adequacies are enumerated below.
1. The users of the traditional library
need to go the library physically which most times could lead to congestion of
the library?
2. Inability for the library resources
to be accessed 24/7.
3. The library resources cannot be
simultaneously used. It is one at a time.
4. Traditional libraries are limited by
storage space.
1.3 GENERAL OBJECTIVES OF THE
STUDY
The proposed system Digital Library
System has it’s general objectives which it is set out to achieve. They are as
follows:
1. To create variety of access services
for searching, browsing and discovering resources.
2. To organize and index digital
objectives for different purpose which includes cataloging, finding aids and
database.
3. Reduction of loan and acquisition
through the use of digital library.
4. Comprehensive storage of large
repository of data that can be accessed by authorized users.
5. Reduce the cost of maintaining a
traditional library.
1.4 SPECIFIC OBJECTIVE OF THE
STUDY
The objectives of this proposed system has been narrowed.
This is geared towards ensuring that the objectives are achieved. They are as
follows:
- Removal of Physical Bounding: Ensure that the users do not always go to the library physically, but can access library resource once he/she is connected to the server.
- Round the Clock Availability: To enable users to be able to gain access 24/7 to the information.
- Information Retrieval: To make it easy and convenient for the user to use any search term (Title OR Authors name) to search the entire collection, thus providing user-friendly interfaces, and giving clickable access to it’s resource.
- Preservation and Conservation: Provide access to materials that would otherwise fall to degradation from repeated use.
- Multiple Access: Ensure that the same resources can be used simultaneously by a number of persons.
- Space: Able to provide storage for information digitally by using little physical space to contain them.
1.5 SIGNIFICANCE OF THE STUDY
In implementing the objectives of this study, the advantages
of a digital library over the traditional library are enormous. Users will be
able to access library resource digitally without the inconveniences of users
carrying books, journals, magazines etc which could result in rapid wear and
tear of this library resource. Besides, it will afford users the opportunity to
access digital books simultaneously without waiting for the book to be returned
to the library.
The proposed system will provide security to help track
library resources through the development of a comprehensive database that will
be used to house the library resources. The system will also eliminate some of
the routine manual work prevalent in a traditional library.
1.6 SCOPE OF THE STUDY
The findings of this research work for the proposed system
(Digital Library System) was carried out in the Nnamdi Azikiwe University (NAU)
in their digital library section. The scope of this study will include the
following:
1. Information indexing/cataloguing.
2. Classification of library resource.
3. Searching and retrieval
(downloading).
4. Registration of books/uploading of
digital resources
5. Registration of users.
6. Database management.
1.7 LIMITATION OF THE STUDY
This proposed system will not take into consideration audio
collections. It is web based not a stand alone delivery system with its own
user file and login ID and password. Also, time constraint during the time for
this project work is short. Financial resources is a limitation encountered in
the course of this research work.
1.8 DEFINITION OF RELATED
TERMS
- Digital: Relating to or using signals or information represented by discrete values of a physical quantity.
- Library: A building or room containing collections of books, periodicals and sometimes films and recorded music for people to read, borrow or refer to.
- Digital Library: Is a type of information retrieval system in which collections are stored in digital format.
- Information: This is a collection of facts or data.
SOLD BY:
No comments:
Post a Comment