CONSTRUCTION OF 5 VOLT DUAL POWERS SUPPLY
ABSTRACT
The title of this project is
design and construction of 5v dual regulated power supply for
laboratory use. This project is begin designed and constructed to
overcome the draw backs being encountered by most of the laboratory
d.c. electronics equipment from unregulated d.c. power supply, which
their d.c. output voltages changes with variation in load or input
voltages. This type of d.c. supply is termed regulated d.c. power supply
and can be obtained by voltages regulation circuit. This regulation
circuit is an electronic control circuit which is capable of providing a
nearly constant d.c. output voltages even when there are variation in
load or input voltage. This project consists of four basic unit, the
transformer unit, ratification unit, altering unit and regulator unit.
The units so mentioned have been received and designed to meet up with
the desire objective of the project. This dual rail power supply circuit
is a fixed voltage type and are recommended essentially for all
communications, instrumentation, computers and any other electronic
system or equipment, provided that the voltage of the equipment it is
going to supply is within the rated output value.
CHAPTER ONE
1.1 INTRODUCTION
Nowadays accurate personal
identification is becoming more and more important. Usual means (smart
cards, passwords…) have shown their limits (falsification, loss…).
Biometrics (i.e. analysis of personal biological characteristics) can
bring a satisfying answer to those latter problems. Currently
fingerprint recognition is the most widely used technique for personal
identification. Fingerprints are made up of locally parallel ridges with
singular points (minutiae), and they constitute a unique permanent
universal pattern. The use of ink and paper to get an image from a
finger was used for a long time, but technological advances have enabled
to automate the acquisition stage by means of solid-state sensors.
These sensors exploit different techniques to acquire the image
(pressure, electrical field, temperature…) and require a static (matrix
sensor) or mobile finger position (sweeping mode sensor).
Our project is developed to provide
security for a Organization. In this project the fingerprint sensor
sense the thumb impression of the corresponding person and that image
will be compared with registered image, if the both images are unique,
then the finger print device activates particular task like access
control to a secured area, identification of the employee etc. The
project contains 2 modes, the first one is master mode and the second is
user mode. The master mode is used to register the new user and gives
the mode of authorization. The master mode has the ability to create and
delete the users. The user mode is an ordinary mode used for the
authentication of the employees. In user mode of authorization, creation
and deletion of a user cannot be performed.
The Master mode operations are done
directly through interfacing the FM10 (Finger Print Module) to the COM
PORT of the computer. The application program is developed using java
API in Swings. The Java communication API is used for communicating with
the Fingerprint device. The employee details along with biometric
information database are stored in the flash memory of the Fingerprint
module. The Microcontroller 89S52 is programmed to operate under user
mode. Microcontroller is programmed using C51 cross compiler.
Fingerprint image is scanned by the fingerprint device. If the scanned
image matches with the registered image then Microcontroller sends the
authorized persons Id to the computer when the person enters and leaves
the organization. By this daily attendance of employees, many employee
records are maintained. The employee records are stored in
1.2 OBJECTIVES OF STUDY
The aim and objectives of this project
work is to design and constructs a dual power supply for use in
industries, homes, etc or any property.
1.3 PROBLEM STATEMENT
This project provide a comprehensive of a
finger print security alert system with LCD display with a central
alert unit and the technique employed in the design,
Construction and analysis of the various
circuit components. The technology employed in constructions of a
security system such as this shows how each component relatively
function with each other and the combined operations of sub-circuits
placed at each exit response to any intrusion.
1.4 SIGNIFICANCE OF STUDY
The study is important in numerous
aspect as it may find its application in almost all electronics
appliances. It can be applied in homes, hospitals, factories or
industries etc to give positive and negative feedback.
1.5 SCOPE OF STUDY
Short comings may be experience due to
inherent weakness in designs considering the time frame which the
project was carried out.
CHAPTER TWO
LITERATURE REVIEW
2.0 INTRODUCTION
A power supply is an
electronic device that supplies electric energy to an electrical load.
The primary function of a power supply is to convert one form of
electrical energy to another and, as a result, power supplies are
sometimes referred to as electric power converters. Some power supplies
are discrete, stand-alone devices, whereas others are built into larger
devices along with their loads. Examples of the latter include power
supplies found in desktop computers and consumer electronics devices.
Every power supply must obtain the
energy it supplies to its load, as well as any energy it consumes while
performing that task, from an energy source. Depending on its design, a
power supply may obtain energy from various types of energy sources,
including electrical energy transmission systems, energy storage devices
such as a batteries and fuel cells, electromechanical systems such as
generators and alternators, solar power converters, or another power
supply.
SOLD BY:
No comments:
Post a Comment