Monday, 9 July 2018

FACTORS AFFECTING PROPERTY VALUE

FACTORS AFFECTING PROPERTY VALUE

Property value is influenced by many factors. Some of the factors include

  1. Location of the property: Land located in urban areas is of higher value than that of rural areas. This is often due to the demand for it; there is high competition for a land in an urban area. Professionals in real estate business will  always acknowledge the initial importance of location to property investment even within urban areas. Ifediora (1993) postulated that any part of the city cut off from the rest of the metropolis as a result of poor access road, lack of transportation roads will command a relatively low value. Whereas areas with good network of roads which can lead them to different parts of the city is capable of commanding a higher value.
  2. Planning control: The power of planning in today’s world is very great indeed. Restriction policies might cause values to be higher than would normally occur. Balchin and Kieve (1982) observed that the prohibition of office development in central London between 1965 and 1970 created scarcity and resulted in rapidly rising rents and capital value. Control of land uses by the government takes place through laws like zoning regulations which can be land use zoning, bulk zoning, height zoning and density zoning. Developers must comply with zoning regulations and obtain planning approval for the usage and improvement of land. Haphazard development is not only prevented but land value is also enhanced t through various planning regulations.
  3. Population: Oyebanji (2003) described population change as occurring in two ways namely decrease in population or increase in population. Any increase or decrease in population will obviously affect property values (Millington, 1982). Take for instance, an increase in population with other factors held constant, means an increase in demand.
  4. Environment and Features: Akintunde (2009) sees environment as an external factor that impact on property value. To him environment factor include neighbourhood, in term of its general security, servicing and state of public infrastructure ( good access roads and drains, water and electricity) topography, soil type ( dry or swampy), amenity provision level ( i.e. accessibility to schools, hospitals, shopping/ market facilities, sports, social club etc.) as well as the aesthetic quality of the area. Features on the other hand includes; green area, adequate provision for parking, good perimeter fence with security devices, children play area, swimming pool, gymnasium, water treatment plant, well paved road, quality plumbing work etc. Any property with all the above will definitely command high value than the one that have less of these features and environment quality. Some scholars refers to feature as utility
  5. Quality design and finishing: The internal arrangement of bedrooms with a provision for bathroom and toilet portends convenience. A house that has good ventilation will no doubt enhance healthy living.
  6. Good maintenance practices: Akintunde (2009) observed that for properties to command high value, owners must ensure that there is adequate provision for maintenance of the building. This will prevent frequent repair and ensure that the property is in good state of repair.
  7. Economic Factors: This factor influences the value of land and property a great deal. Where many activities take place the value of land will surely rise because there is always a possibility to recoup back the money after a short period of time. While areas of low economic activities will bring about a low level in land value.
  8. Institutional Factors: These are factors relating to the people’s culture, religious belief and government which invariably dictate what land is used for in the society. The consequential effect is either low or high property value. People’s culture and religious belief tend to limit or shield away valuable land area for economically viable uses such as hotel. In an attempt to make land and housing available for every member of the public at affordable cost, government can introduce certain policy or enact laws to that effect (land reforms programmes).
  9. Technological Factors: The level of technological development can affect the value of a land. The value of property is high in certain areas because improved technological equipments and social amenities such as central sewage system, good lift system as well as central cooling system to mention a few are available.
  10. Complementary Uses: Since land uses are independent with man and his economic activities, this thereby brings about mixed uses and areas with complementary uses have high values. As such, economic activity blossom where there are other complementary uses and concentration of activities such as Motor Park and a nearby shopping center.
  11. Change in Taste and Fashion: People tend to develop taste for modern buildings. This is as result of civilization and new innovations. Potential purchasers prefer to purchase or lease a house of modern design coupled with fashionable finishes. This thereby brings about an increase in value of land in the urban areas while values fall in the rural areas.

REFERENCES

OLANIPEKUN T. A. (2010) IMPACT OF URBAN RENEWAL ON PROPERTY VALUES. DEPARTMENT OF ESTATE MANAGEMENT YABA COLLEGE OF TECHNOLOGY YABA, LAGOS. A Journal of Estate Surveying Research, (December 2010) 80 -89

 

Akintunde, Femi. (200 ): Facility management as a defensive strategy to maximize value of real estate assets during economic recession.

Oyebanji, A.O. (2003): Principle of Land use Economics, Lagos, Sam Otu Nigeria Company

Balchin P.N & Kieve J.L (1982): Urban land economics, Hong Kong, The Macmillan Press limited,

Wednesday, 27 June 2018

IMPACT OF FINANCIAL LIBERALIZATION ON THE EFFICIENCY OF THE NIGERIAN STOCK MARKET: 1986-2011

 

IMPACT OF FINANCIAL LIBERALIZATION ON THE EFFICIENCY OF THE NIGERIAN STOCK MARKET: 1986-2011

Abstract

Using Nigeria aggregate level data for 26 years: 1986-2011, the study estimates the impact of financial liberalization on stock market efficiency in Nigeria. The study used the Generalised Least Square (GLS) to estimate the four hypotheses formulated for the study. The ratio of stock market capitalization to gross domestic product, ratio value of shares traded to gross domestic product, ratio of all share index to gross domestic product, and ratio of value of shares traded to market capitalization were adopted as the dependent variables, while the independent variable was financial liberalization (percentage in foreign equity ownership). The study also controlled for some macroeconomic variables such as exchange rate, inflation rate and interest rate that might impact on the dependent variables. The results showed that the regression coefficient for financial liberalization was negative and non-significant in predicting or promoting four proxies of stock market efficiency, which supports the preposition that financial liberalization does not transform or promote stock market efficiency. Based on the results, the study recommends inter alia: promotion of favourable macroeconomic environment; formulation of policies that will reduce the impact of speculative hot money, strengthening of the legal system, stronger transparency in terms of information disclosure, the need for the establishment of effective and efficient Dispute Resolution Mechanism, the urgent need to rethink the tenure of the market; among others.

 

CHAPTER ONE

1.0       INTRODUCTION

1.1       Background of the Study

The issue of market efficiency, as espoused by Fama (1965, 1970), which posits that prices fully reflect available information has remained at the heart of financial economics literature. Lim and

Brooks (2011), state that the efficient market hypothesis defines an efficient market as one in which new information is quickly and correctly reflected in its current security price. Generally, the argument is based on the assumption that at any given time, prices of stocks fully reflect all the available information related to them. This is the path toed by Marashdeh and Shrestha (2008), Maghyereh (2003), Bashir, Ilyas and Furrukh (2011), among others.

For the market to be efficient, the prices of stock must reflect company fundamentals, state of the economy and most importantly, the law of demand and supply, which can only come to fruition through liberalising the stock market (Kawakatsu and Morey, 1999; Waliullah, 2010). Proponents of this theory have documented extensive evidence to show that financial liberalization promotes stock market development (Ortiz, Cabello and Jesus, 2007). Against this background, the effects of financial liberalization on stock market efficiency has remained a core issue in finance literature, more so, considering efforts by governments especially in the developing countries to liberalize their financial markets in order to catch up with the developed countries on one hand and to integrate their economies to the global economy on the other. The impact of financial liberalization on the stock returns and volatility is an important issue for researchers, regulators and investors (Nazir, Khalid, Shakil and Ali, 2010).

An illustrative list of studies of the effects of financial liberalization on stock market efficiency includes those by Henry (2000) who found that stock market liberalization may reduce the liberalizing country’s cost of equity capital by allowing for risk sharing between domestic and foreign agents; Kim and Singal (2000) found that stock returns increase immediately after market opening without a concomitant increase in volatility; Bekaert, Harvey and Lundblad

(2003) report that integration affects the functioning of the equity market, the cost of capital, the diversification ability of local participants, the level of prices, the business focus of local companies, and foreign capital flows while the empirical findings of Levine and Zervos (1998) show that stock markets tend to become larger, more liquid, more volatile, and more integrated following liberalization and Grabel (1995) states that financial liberalization induces increased asset price volatility. On his part, Miles (2002) reports that reforms has a statistically significant impact in almost three fifths of the emerging markets surveyed, but more often than not, the effect is actually to raise, rather than lower the volatility of stock returns. In this connection, therefore, the highly articulated view of Levine (2001) which states that international financial integration can promote economic development by encouraging improvements in the domestic financial system is worth noting.

Specifically, Bekaert and Harvey (1995) explain that markets are completely integrated if assets with the same risk have identical expected returns irrespective of the market. A prominent line of research suggests that financial development has a causal influence on economic growth (Ujunwa and Salami, 2010). However, Stigliz (2004) in his criticism of the International Monetary Fund (IMF) policy of pressuring countries into liberalizing their capital markets, reports that economists, particularly in developing countries, had long expressed doubts about the virtues of capital market liberalization.

The foregoing effects especially the aspects detailing the positive imparts of liberalization, may have formed part of the reasons why liberalization became a matter of choice in Nigeria in the 1980s. Financial liberalization which involves banking reforms, insurance reforms and stock market development, without doubt, could have significant effect on stock returns and volatility Ojo and Adeusi (2012) state that in Nigeria, financial sector reform was a component of the Structural Adjustment Programme (SAP) which was introduced in 1986. They further state that some of the reforms created for the money market indirectly affected the capital market activities simultaneously. Quoting Nnanna, Englama and Odoko (2004), these reforms according to Ojo and Adeusi (2012) include deregulation of interest rates, exchange rate, entry/exit into the banking business, establishment of the Nigeria Deposit Insurance Corporation (NDIC), strengthening the regulatory and supervisory institutions, upward review of capital adequacy, sectorial credit guidelines, capital market deregulation and introduction of direct monetary policy instruments.

Opening of capital markets represents an important opportunity to attract the necessary foreign capital (Kim and Singal, 2000). Foreign capital in the nature of portfolio flows may take a different pattern when the market is made more open following liberalization. On the issue of regaining access to foreign capital by developing countries, Bekaert and Harvey (2003) argue that portfolio flows to developing countries (fixed income and equity) and foreign direct investment replaced commercial bank debt as the dominant sources of foreign capital. They argue further that portfolio flows to developing countries could not have happened without these countries embarking on a financial liberalization process, relaxing restrictions on foreign ownership of assets, and taking other measures to develop their capital markets, often in tandem with macroeconomic and trade reforms. Specifically, Nigeria was in dire economic crisis in the period preceding liberalization. Omotoye, Sharma, Ngassan, and Eseonu, (2006) are of the view that the oil glut of the mid-1980s exposed the fundamental weakness of the Nigerian economy and greatly intensified the country’s debt management problems. On their part, Omoleke, Salawu, and Hassan, (2010) point out that it is a trite fact that, deregulation and privatization in Nigeria are consequences of failure of the state owned enterprises. Also, Adeyemo and Salami (2008) see privatization as a strategy for reducing the size of government and transferring assets and service functions from public to private ownership and control.

According to Alabi, Onimisi and Enete (2010), the argument for economic reforms in Nigeria in the 1980/1990s could be attributed to several reasons among which were: the need for more money to fund imports, policy reactions towards combating the impending economic collapse, external shocks of foreign loans; the enterprises in Nigeria have found themselves in a state of perfidy, low performance and undoubted inefficiency.

Probably as a result of the foregoing, the Babangida government in 1986 applied for what was known as the IMF loan. As part of requirements for the loan, the IMF insisted on certain conditionalities which prescribed exchange rate depreciation, privatisation and liberalization. This resulted in a package that later became known as Structural Adjustment Programme (SAP). It could be argued that these conditionalities were prescribed as part of qualifications for the facility and also due to the need for greater integration of the Nigerian economy into the global economic system. Anyanwu (1992) argues that the IMF-World Bank economic policy packages embodied in President Babangida’s Structural Adjustment Programme (SAP) provided overt encouragement to the fostering of an unregulated, dependent capitalist development model, while allowing only a supportive role for the government in a refurbished economic environment of highly reduced government ownership and control of enterprises.

There is no doubt that these conditionalities were universal in terms of prescriptions for the economic ailments of developing and underdeveloped economies irrespective of backgrounds, structure and individual level of development even when generally classified as developing or underdeveloped. To this extent, Ekpo (1992) is of the opinion that the countries of West Africa continue to experience underdevelopment despite the economic growth of the early and late sixties. He added that the sustained crisis, evidenced in low productivity, high rates of inflation, high rates of unemployment, deterioration in standards of living, huge external debts, social and political chaos, etc, prompted virtually all the countries in the West African sub-region to implement, in one form or another, the typical International Monetary Fund (IMF) and World Bank adjustment programmes.

Proponents of these prescriptions can argue that the choice is anchored on the belief that globalisation increases economic integration of world economies which manifests in increased trade and investment. In the view of Zekos (2005), globalization is characterised by structural reforms such as trade and investment liberalization and increased trade and international investment flows promoting growth, altering the composition and geographical distribution of economic activities, stimulating competition and facilitate the international diffusion of technologies having significant effects, both positive and negative, for sustainable development.

But the level of economic development and the point in the lifecycle of individual economies which could have formed the basis upon which prescriptions were made appears to have been inadvertently omitted. In the case of Nigeria, the economy was characterised by sustained fiscal imbalance and exposure to external shocks which brought about both domestic and external instability. In fact, economic deregulation in Nigeria was not a policy option during the oil boom period of the 1970/1980s as no evidence suggests that external influence on policy choices at that time was strong. The need to transmute from a planned to market economy, although, arose through the influence of the World Bank and IMF, impetus was added by thinking in the international arena due to what was seen as benefits of the free market system. Smith, Jefferis and Ryoos (2003) made a strong case for transition from planned to market economy by stating inter alia: “we believe success requires a psychological readjustment, a mind-shift from the failed assumptions of a decadent, centrally planned economy to those of a competitive, vigorous and expanding free market”. Economic deregulation implies the breaking down of barriers to trade and finance.

Financial market liberalization was a major component of economic deregulation in Nigeria. The need to liberalize Nigeria’s financial market may have been hinged on the need to build an efficient and sound financial sector which is vital for poverty reduction and economic growth. The financial sector before deregulation was not well developed and the range of institutions in the sector was narrow. As a result of this, banks played a limited role in the economy and cash remained the dominant financial instrument. There was, therefore, the need to enhance the financial market infrastructures to enable market deepening.

The importance of stock market liberalization cannot be over-emphasized. On his part, Henry (2000) argues that stock market liberalization is a decision by a country’s government to allow foreigners purchase shares in the market. He added that standard models of international asset pricing predict that stock market liberalization may reduce the liberalizing country’s cost of equity capital. It should be noted that stock market liberalization does not end with just allowing foreigners to purchase shares. It equally entails general lessening of controls and aligning the market to international best practices such as establishing institutional frameworks that will facilitate market development and enhance regulatory roles. Sharma and Vashishtha (2007) are of the opinion that innovative changes in financial institutions, regulatory structures and practices, and financial instruments occur, from time to time, over a long period. They explained further that these changes affect the generation, mobilisation and distribution of savings, which are important for shaping the direction and pace of growth of an economy. It is therefore expedient to find out how liberalization has impacted the Nigerian Stock Market which in turn might have affected the endogenous growth model in Nigeria.

In liberalizing the financial market, the capital market became a component part of the process being a cardinal part of the financial sector. The capital market which represents a major arm of the financial market can be likened to any other market for assets, e.g. the property market.

Trading in assets of different types is the major function. Fischer and Jordan (1995) argue that a securities market is a broad term embracing a number of markets in which securities are bought and sold. They explain further that one way in which securities markets may be classified is by the types of securities bought and sold. Their argument centred on the classification of securities markets; whether the securities are new issues or are already outstanding and owned by investors. Another classification according to Fischer and Jordan (1995) is by maturity: securities with maturities of one year or less normally trade in the money market; those with maturities of more than one year are bought and sold in the capital market. Markets, however, differ in some respects which were identified by Hutchison and Nanthakumaran (1998) to include presence or absence of a central trading system, homogeneity or otherwise of assets, low versus high lot value of assets traded, quality of available information and number of market participants.

There is a linkage between macroeconomic variables and stock market returns as several models (arbitrage pricing theory (APT), aggregate demand and aggregate supply (AD/AS), monetary transmission mechanisms, etc] provide a basis for the long-run relationship and short-run dynamic interactions among macroeconomic variables and stock prices (Ibrahim and Aziz, 2003). This linkage implies that policy reactions to economic problems impacts the financial system (both money and capital markets).With the adoption and subsequent implementation of SAP, what could be regarded as economic deregulation in Nigeria evolved. The outcome of this was financial market liberalization and a later boom in both the money and capital markets. With specific reference to the capital market, Ujunwa and Salami (2010) point out that overall, equity culture is increasing among Nigerians.

Due to financial market liberalization in Nigeria, restrictions were lessened and equities listed on the Nigerian Stock Exchange became a serious class of asset to consider in any investor’s portfolio whether local or foreign. That is to say that financial market liberalization provided an opportunity for a stronger interconnection of the local economy to the global economic community especially in the area of funds flow. Loungani and Razin (2001) show that economists tend to favour the free flow of capital across national borders because it allows capital to seek out the highest rate of return. They identified risk diversification and spread of best practices in corporate governance, accounting rules, and legal traditions as some of the apparent advantages. On their part, Smith-Hillman and Omar (2005) argue that advances in communication and transportation have created new opportunities that now place Less Developed Countries on the menu of choice in spite of the relatively higher degree of political risk. How Nigeria has benefited from these advantages warrants an empirical examination. This study, therefore, is modelled after the studies by Kawakatsu and Morey (1999) and Auzairy, Ahmad and Ho (2011) in the areas of liberalization and efficiency of emerging stock market prices; and impact of stock market liberalization and macroeconomic variables on stock market performances respectively.

The stochastic behaviour of the NSE has not been fully addressed in previous studies. Such issues include stochastic dominance, conditional heterascedasticity, chaotic behaviour and stock market efficiency. The need for this type of study has been justified by Jarrett and Kyper (2005) who argued that studies of capital market efficiency are important as they infer that there are predictable properties of the time series of prices of traded securities on organised markets.

While Okpara and Nwezeaku (2009) were concerned with whether idiosyncratic risk can be diversified in the Nigerian stock market; Donwa and Odia (2010) analyzed the impact of the Nigerian capital market on her socio-economic development. Olowe (2009) on his part addressed the relation between stock returns and volatility in Nigeria in the light of banking reforms, insurance reform, stock market crash and the global financial crisis. The five year data (2004 – 2009) he employed in his analysis ordinarily looks small but is suitable for the type of study he carried out as he primarily looked at the effects of global financial crises on stock return and volatility. The current global financial crisis is a cycle that will give way to the normal stable stock market situation, although, factors which contribute to the equilibrium of the market may never be the same again. On their part, Asaolu and Ogunmuyiwa (2011) investigated the impact of macroeconomic variables on Average Share Price. None of these studies specifically addressed the impact of financial liberalization on stock market efficiency in Nigeria, which is the hallmark of this study. Furthermore, the effects of announcement of liberalization of the financial sector on the stock market performance have not been particularly addressed. Bekaert, Harvey and Lundblad (2003) identified the methods by which researchers can date the integration of world equity markets. The dating, according to them is a critical exercise and only when dates are established can research begin to measure the impact of liberalization. This, we have done which defines the scope of this study and our study considered financial liberalization index while measuring economic activity and also analyzed the impact of liberalization and size of financial market on stock returns in the case of Nigeria which to our knowledge has not been done before; and therefore, makes this study novel.

Specifically, the study investigated the relationship between financial liberalization and stock market indicators while controlling for the effects of macro-economic variables (interest, exchange and inflation rates) in the context of an emerging economy. Kim and Singal (2000) enthuse that opening of capital markets represents an important opportunity to attract the necessary foreign capital which also hastens the development of equity markets that is positively related to long run economic growth and a reduction in the cost of external finance. Also, Karolyi (2002) submits that in most empirical studies, the process of market liberalization focuses on important events that facilitate cross-border capital flows.

Examples include regulatory actions, such as the relaxation of foreign currency controls or foreign ownership limits, and capital market events, such as the introduction of the first country fund for foreign investors. In measuring capital market liberalization which he described as a process and not an event, Karolyi (2002) used the growth and expansion of global cross-listings, especially in the United States by non United States companies through American Depository Recepits (ADRs). He defined ADRs as negotiable claims against ordinary shares in the home market of a company created by U.S. depository banks that trade over-the-counter, on major United States exchanges or as private placements. Along this line of reasoning, the major contribution of this study will be the estimation of changes in the level of stock market variables (capitalization ratio, liquidity ratios and returns (ASI)] within the liberalization window.

The short-comings identified by Kawakatsu and Morey (1999) regarding the liberalization index in Nigeria have now been overcome as Bekaert, Harvey and Lundblad (2003) identified August, 1995 and May 1998 as the official liberalization date and first country American Depository Receipts introduction (indirect means of entering the market) respectively. Miles (2002) also identified August 1998 as official liberalization dates while Jeferris and Smith (1995) point out that restriction on foreign participation were removed in 1995 since when foreign-owned brokerages have been permitted and controls on foreign participation in the ownership of

Nigerian companies have been removed. Kawakatsu and Morey (1999) point out that identification of liberalization date has been described as the most significant liberalization of the market stating further that only a few authors focus on the effect of liberalization on stock market efficiency. This also makes this study unique. There is therefore a knowledge gap in the literature that warrants a more robust approach. We, therefore, investigated in this study the impact of financial liberalization on the efficiency of the Nigerian Stock Exchange from the announcement year.

1.2       Statement of Problem

The implications of financial market liberalization on stock market efficiency have generated a lot of controversy. The basis for this controversy is whether financial market liberalization has had any effects on the efficient hypothesis of stock markets. Empirical evidence along this line is surrounded with mixed results. In the case of the efficiency of Arab stock markets, Abdmoulah (2010) argues that since efficiency improvements seem to be positively related to market size, efforts to expand and deepen these markets should then be a prime concern. Bekaert, Harvey and Lundblad (2003) argue that if liberalization is effective, it leads to market integration, which has a fundamental impact on both the financial and real sectors of developing countries.

Potential shortcomings of capital market liberalization, according to Semmler and Young (2010) are that too fast liberalized capital markets, with risk assessments solely left to the market, can trigger boom-bust cycles, the busts precipitated by financial instability, entailing contagion effects and strong negative effects on the real sector of the economy. Another problem bothers on the procedure to adopt in order to systematically identify the date of Nigeria’s stock market liberalization. Henry (2000) points out that official policy decree dates are used when they are available; otherwise two alternatives are used; viz: firstly, permission of foreign ownership through country funds (for example, American or Global Depository Receipts) i.e. since government permission is presumably a necessary condition for establishment of these funds, the date when the first country fund is established is used as proxy for the official implementation date. Secondly, indirect capturing of official implementation dates by monitoring the IFC’s Investability Index. According to Henry (2000), the investability index is the ratio of market capitalization of stocks that foreigners can legally hold to total market capitalization. He adds that a large jump in the investability index (at least 10% increase) is evidence of an official liberalization. To this end, this study contributes importantly to both the literature on financial liberalization and literature on stock market efficiency and also policy implications of these whether to liberalize more or curtail same.

Many scholars point out the importance of the financial system in mobilizing savings, allocating capital, and easing risk management which they argue is achievable with an efficient stock market. Besides, some theories provide a conceptual basis for the belief that larger, more efficient stock markets boost economic growth; while others argue that the idea of market efficiency has fallen into disrepute as a result of market events and growing empirical evidence of inefficiencies. Admittedly, Cho (1986) points out that the literature on financial liberalization has emphasized the role of the banking sector, which is correctly perceived as the only organized capital market in most developing countries; he, however, points out that it has neglected the potential role of equity markets for efficient capital allocation and risk sharing in a liberalized financial environment. Furthermore, while the argument for financial market liberalization has gained currency, some empirical results differ. One of which is the outcome of a study by Auzairy, Ahmad and Ho (2011) which explored the effects of macroeconomic factors: exchange rates, interest rates and oil prices, on stock market performances in Malaysia, Thailand and Indonesia. The two conclusions supported by the results of their study are: firstly, subsequent stock market liberalization policies implemented in and after 1997 are not significantly effective in improving stock market performances of the liberalizing countries; and secondly, macroeconomic variables have significant impact on the performances of liberalizing countries’ stock markets in some of these events.

The stock market in Nigeria prior to financial market liberalization was characterized by paucity of financial instruments, low turnover ratio and the dominance of government securities. Other features of the markets include: poor infrastructure, illiquidity, inactive bond market, non automation of trading system and large unclaimed instruments, among others. It was generally believed that the problems that bedeviled the stock market will be ameliorated by financial market liberalization. Liberalization was expected to lead to stock market efficiency which will enable domestic financial institutions duplicate innovations from their more advanced counterparts by offering options and other derivative instruments that are important for shaping the direction and pace of economic growth and development. Although, the market has witnessed growth in key market indicators such as all-share index and market capitalization in recent years but it could not withstand the debilitating effects of the current global economic meltdown. Investments worth billions of dollars have been wiped off despite the long-held belief that financial market liberalization will lead to market stability. Does this, therefore, mean that after several years of so-called financial market liberalization, most of the expected benefits have eluded Nigeria?

This importance can be seen from the perspective of savings mobilization, capital allocation and easing risk management. As the world becomes a global village, rent seekers know no boundaries as international relationships in the arena of politics, science and technology and funds movement create new opportunity set. Defining economic globalization, Gaburro and O’Boyle (2003) see it as the practice of economic agents (business enterprises, banks, and finance companies) working in different countries and serving the world market without a prevailing national base. This therefore means that with a well developed stock market, the ever elusive foreign direct investment could flow into the Nigerian economy following liberalization as the rate of return on assets before now was not attractive enough all things being equal. This without doubt will boost economic growth. It is probably from this angle that Lopez-Mejia

(1999) argues that the heightened interest of foreign investors in some developing countries has led to their increased integration into the global financial system, with benefits for those countries and for the global economy.

Without doubt, financial market liberalization may mean more funds flow to the domestic economy which is essential for growth and development. The stock market is a big channel in this connection, although some issues here are debatable. Despite often divergent views as to how growth of an economy should proceed, development economists and planners seem to agree that successful development requires availability of capital in a sufficient amount (Agbetsiafa, 1998). A stock market that is well developed and efficient can provide opportunity for large pool of capital for investment purposes especially for the long-term.

The above claims and pressure from the International Monetary Fund compelled the Nigerian government to deregulate its financial market in 1986. Thus, it has now become imperative to empirically determine the impact of financial liberalisation on the Nigerian stock market. This study strives to fill this important knowledge void using standard measure of stock market efficiency such as market capitalization ratio, value of shares traded ratio, stock turnover ratio and all share index (ASI).

1.3       Objectives of the Study

The main objective of the study is to establish the impact of financial liberalization on stock market pricing efficiency in Nigeria. To achieve this, the study strives to fulfil the following specific objectives;

  1. To establish the impact of financial liberalization on market capitalization ratio (size of the capital market) in Nigeria.
  2. To identify how financial liberalization has impacted on value of shares traded ratio (liquidity) in Nigeria.
  3. To establish the relationship between financial liberalization and stock turnover ratio (transaction cost) in Nigeria.
  4. To determine the relationship between financial liberalization and all share index (aggregate returns) in Nigeria.

1.4       Research Questions

In order to carry out a successful research, the following research questions were postulated to give direction to the study;

  1. Does financial liberalization have positive and significant impact on market capitalization ratio?
  2. Does financial liberation have positive and significant impact on the value of shares traded ratio?
  3. Is there any positive and significant relationship between financial liberalization and stock turnover ratio in Nigeria?
  4. Does financial liberalization have positive and significant impact on all share index (ASI) in Nigeria?

1.5       Research Hypotheses

In order to systematically and scientifically enhance the chances of achieving the objectives stated above, the following hypotheses are proposed for this study:

  1. There is no positive and significant relationship between financial liberalization and market capitalization ratio in Nigeria.
  2. There is no positive and significant relationship between financial liberalization and value of share traded ratio in Nigeria.
  3. There is no positive and significant relationship between financial liberalization and stock turnover ratio in Nigeria.
  4. There is no positive and significant relationship between financial liberalization and all share index (ASI) in Nigeria.

1.6       The Scope of the Study

Financial liberalization is about the removal of restrictions as a result of government regulation of economic affairs. Arguments ensue whenever the word “financial liberalization” is mentioned especially in Nigeria where there is a divide in public opinion about the advantages and disadvantages of liberalization. The benefits of liberalization in some economies have been realized through privatisation and implementation of policies that minimize price distortions which are the hallmarks of economic liberalization. Metwally (2004) shows how most Middle Eastern governments encouraged the role of the private sector by opening up the economy to international trade and encouraging competitiveness. With liberalization of the financial market, the capital market was expected to attain a new level of efficiency whether the weak-form, semi-strong form or the strong-form. This work will examine the various concepts of efficiency within the period: 1986 – 2011. The choice of period was informed by data availability and the impact of economic liberalization on the stock market efficiency prior to the global economic meltdown which aggravated from 2008. This period marks the beginning of events leading to liberalization announcements and actual period of liberalization and post liberalization period. We would strive to identify as practically as possible the advantages of economic liberalization as well as its disadvantages. Some of the advantages have already been highlighted above while one of the probable disadvantages is the case of huge foreign direct investment that may lead to the superimposition of foreign managerial expertise over local ones as is the case with multinational-corporations. However, it is succinct to state that the main focus of this study is to find out how financial market liberalization has impacted on the efficiency of the stock market in Nigeria. Although liberalization is a process and continuous; the post liberalization period terminating in 2011 is deemed convenient for the purposes of this research exercise.

1.7       Significance of the Study

This study is important since it investigates the impact of financial market liberation on the stock market efficiency. This has become important given revelations from most scholars that financial liberalization will be best located in economies with favourable macroeconomic environment.

Thus, it is apt to compare stock market efficiency or performance index with using liberalization index to establish the pattern and trend of their interactions from the adoption year till 2011 in Nigeria. Besides that, the study also investigates the association among stock market indicators, macroeconomic variables and financial market liberalization in the context of an emerging economy. The major contribution of this study will be the use of liberalization index, stock market and macroeconomic variables in the analysis of market efficiency in Nigeria. Specifically, four sets of stock market indicators and the level of foreign equity ownership as an index of financial liberalization and macroeconomic variables were used to investigate whether liberalization has improved the efficiency of the Nigerian stock market in line with the prevailing theory of market efficiency.

The study also accommodated the short-comings of previous studies on Nigeria such as Kawakatsu and Morey (1999), Bekaert, Harvey and Lundblad (2003), Miles (2002) and Jeferris and Smith (1995). These studies estimated for lagged-effect, based on the assumption that the adoption of financial liberalization will not have immediate effect on the economy in their crosscountry studies for developed and developing economies. However, recent revelations have shown that because adoption of such policy is a national policy that involves extensive national debate and opinion pull in some cases, the impact manifests even before the adoption of such policy. Based on this, it is currently advocated that for any study to contribute to the debate, it must incorporate the year of policy adoption even if it is the last month of the year. This study incorporated the postulation by using the period 1986-2011.

The study will be of immense benefit to the following;

  1. Policy makers in Nigeria who will derive valuable lessons as the country combats the consequences of a fragile financial sector. There may be need for a rethink of the extent of market openness as a result of privatization.
  2. The study will provide a basis for investors to evaluate the impact of market opening on the Nigerian stock market behaviour.
  3. The study will benefit stakeholders in the financial market as it will focus on significant and varied structural changes in the economy as a result of financial market liberalization that has led to meteoric growth in stock market indices before the recent crash. A leeway will therefore be handy.
  4. Foreign investors will benefit since equities listed on the Nigerian Stock Exchange have become an asset class in globally-diversified portfolios as the study will identify how regulatory reforms have been used to foster stock market development since liberalization has made Nigeria to be interconnected with other economies.
  5. The findings from this study can provide helpful insights for other stock markets in transition.
  6. Researchers/academicians will benefit equally as the findings from this research will provide answers to some issues yet to be resolved in the area of study and a platform to initiate future research.

REQUEST FOR PROJECT MATERIAL

For the complete research material visit our CHECKOUT PAGE or fill the request form below:

 

[contact-form]

Thanks for your interest in the research topic we will reach out to you as soon as possible.


Tuesday, 9 January 2018

INFORMATION NEEDS OF USERS OF ACADEMIC LIBRARY: A CASE STUDY OF FEDERAL POLYTECHNIC NASARAWA

INFORMATION NEEDS OF USERS OF ACADEMIC LIBRARY:  A CASE STUDY OF FEDERAL POLYTECHNIC NASARAWA

ABSTRACT
The study examined the information needs of users of academic libraries in Federal Polytechnic Nasarawa, Nasarawa State.  It was a descriptive research using questionnaire as the main instrument for data collection.  Results showed that the users of academic libraries in Nasarawa State need information in the following areas:  education, health and politics.  Analysis of questionnaire showed that students information needs are not adequately met even though they constitute the greater percentage of the library use.  the library is the centre of academic excellence in any academic institution, not the classroom or the lecture hall.  The library is the academic soul of an institution of higher learning.  The primary responsibility of the academic library is to aid the parent institution in carrying out its academic programmes.  It functions to satisfy the institutional teaching, study and research objectives.  It strives to meet the academic library needs of the students and teachers.  The excellence of the academic library is determined by the extent to which it supports its institution’s objectives.  The academic library goes at length to provide all forms of human records in all fields of knowledge needed by members of the academic community for the successful pursuit of academic programme such as teaching, study and research.

CHAPTER ONE
1.0   INTRODUCTION
Information has always played a significant role in recorded history.  From time immemorial, information and communication has always formed the basis of human existence.  This fact has made man a relentlessly seek ways to improve the processing of information and communicating such information to one irrespective of distance and on a timely base.  But the restraints to these are the place, time, to whom what kind of information and how effective this information is disseminated to meet the needs of the users.  As such, for one to be fully armed with relevant information and varying ones too, constant use of the library is just the answer.  Information which is an assemblage of data in a comprehensive form capable of communication has no doubt played a leading role in the development and modernization of human society.  Information abounds in various fields of human endeavour, amongst which are academics, scientists even semi and non-literates need information for current awareness, retrospective searches factual information, improving existing services acquiring new ideas, research and to produce information.

Webster’s 3rd New International Dictionary (1961) defines information as “knowledge of a particular event or situation” or as the “knowledge communicated by others or obtained through investigation”.  (Ehen and Hermen, 1982) “Human at times appears to have the capability to think rationally and thus have the way to develop its ability to “need” information to be used in making decisions”.  And information need reflects a desire for increased expected accuracy in the solution of a problem. The need should not be viewed in a negative sense as a “hole” needing to be filled. Instead, it should be seen positively as that which increases decision making accuracy, because they feel that the information might be of some use in the future. Haruna and Mabawonku (2001) contended that “needs arises when the state of possessed knowledge is less than what is needed to deal with some issues and that information needs are divers, constantly changing and not amendable to generalization”.  (Carty, 1995) advised researchers on user need to “understand the psychological and the sociological patterns of individuals in a group in order to explore the behavioural pattern of users in relation to the products of information technology.

Information users are persons that use information and they include government functionaries, housewives amongst others needs are matters of priority, what we need if an overriding reason.  With these, we can see that libraries can be designed to meet the demands of specific groups and thus, the direction of this work, which is an academic library.  The more the society grows and becomes more complex, so does the library responds to it by growing and becoming more complex to meet the needs of the society.  Gates (1976) noted that this is more pronounced in the 19th nineteenth century when in the United States of America, the elitist status of the library from the earliest time to the 19th eighteenth century began to crumble because of the great upsurge of interest in self-education and of the desire for universal public education.  As the society aggregates into different sectors, libraries were established in these sectors of the society.

1.1   BACKGROUND OF THE STUDY
Different types of libraries, therefore, emerged to meet different needs of members of the society.  These libraries include:  the Academic Library, the National Library, the Private Library, the Public Library, the Research Library, the School Library, the Special Library.  It was encouraged by the movement led in the 1840s by Horace Mann and Henry Barnard, who were only promoting libraries for the school districts, to support the academic and public educational programme but also academic libraries for all people, which would be as Horace Mann said “the crowning glory of our academic and public school”.  These libraries failed to achieve the promise that their promoters had hoped.  The tax base was too small, the amount of revenue was inadequate to keep the libraries viable, and they were often the victims of exploitation by rather unethical publishers’ practices.

The central role of the academic library in education is more pronounced now with the learning process which takes place through interaction with a variety of learning resources, through groups of individuals carrying out studies and enquiries, or through research under the guidance of the teacher.  The funding and controlling authority of the library is the parent institution.  One of professional services provided by the libraries in academic libraries in academic library is the selection and development of library collection mainly on the basis of the education philosophy and objectives of the parent institution.  This is opposed to the old learning process which emphasized classroom instruction characterized by a teacher lecturing students, issuing handouts or dictating notes that are memorized and reproduced in an examination.    In most cases, because of its strategic role, the academic library building ranks amongst the best buildings and is usually strategically located in the institution’s compound, no academic institution achieves an academic height or excellence that is greater than the potentials of its library. The primary responsibility of the academic library is to aid the parent institution in carrying out its academic programme.  The services of the academic library are provided on the basis of equality.  For all students and teachers that are in needs of information regardless of age, religion, nationality, language or states.  Services and materials must be provided for users who cannot, for whatever reason, use the regular services and materials for linguistic minorities, people with disabilities, academic libraries are a worldwide phenomenon. They occur in a variety of societies; in different stages of development.  Although the varied contexts in which they operate inevitably result in differences in the service they provide, and the way those services are delivered, they normally have characteristics in common, which can be defined as follows:  Brough (1953) “Academic library is the centre learning” which could be interpreted as symbolizing not just the importance of the library in the entire life of the institution but also an ideal physical location of any higher institutions. Academic libraries are generally defined as the libraries in institutions of higher learning.  The academic libraries are as varied and distinctive as the institution which they serve.  There are the libraries in the institution of higher learning, institute of education; collections of education, schools of  theology, religious, legal and other professional colleges, and the universities.  The libraries are integral of parts of the institutions of higher learning in which they are located.  The library is the centre of academic excellence in any academic institution, not lecture hall.  The library is the academic soul of an institution of higher learning.  The library is, indeed, the true university of today.  In order to fulfill the above purposes, universities, polytechnics, colleges of education do the following:
  • Collection and acquisition of knowledge
  • Organizing and preserving of knowledge for easy storage.
  • Maintained and funded by their parent institution
  • Classification of library materials
  • Preparation of bibliographies
  • Indexes and abstracts
  • Research work
  • User education
As academic libraries build collection and plan programmes for the staffs and students for instance, in the library of Federal Polytechnic Nasarawa, a student of Nasarawa State University Keffi is not given free access to the materials in the library unless the student is given an introductory letter from the school and signed by the University Librarian before such student can be attended to.  The information relevant is usually considered either present or absent that is, information is relevant or not relevant to an information need or use.  information seeking in the first place.  Government needs information on the economy and changes in population, not to plan the provision of adequate services, but also to participate in international planning and development.  While staffs and student needs information on how to pass their examination and to carry research work.

The recognition of the importance of information in every fact of the national development plan of any country is an index of the operations of the nation’s information explosion and the desire for people to know, new innovations and rapid increase in research, science and technology and the general requirement for more relevant information becomes more pertinent and necessary up to the point of desperation.  This near desperation influences the nation acquisition and proper dissemination.  Those who use library are called library users.  The characteristics of the users of academic libraries are patrons of academic libraries and they include the entire body of staffs and students.

1.2   STATEMENT OF THE PROBLEM
Some of the problems of academic libraries grow out of developments within the parent institutions such as increase in student’s enrolment and the growing number of courses offered in the institutions.  Since one library can acquire only a small percent of these materials and since some materials though soon obsolete must be kept by some institutions the problems of what to acquire, what to keep, and how to preserve the materials becomes challenging.  To be able to offer the challenging service in the library, the professional librarian must be broadly educated, and possession of subject specialization as an advantage. He must keep up with trends in higher education, information is so vital to these set of people in the improvement of practice and conditions in the area of production and scientific technological information.  It is necessary to identify users as well as provide library and information professionals amongst others with an assessment of the users need.  It involves working closely with the teaching staff in planning new courses and in determining the nature of library resources for their needs. The size of the professional staff in academic libraries is determined by a number of factors such as the type of organization within the library, the population of the library users.  The teaching methods in use, the number of hours the library is opened, the arrangement of the building and the range of services.  Libraries and information specialize among other concerns are interested in how scholars in various disciplines use resources and their awareness of current library services available.  This is for the purpose of providing information that will assist in building up the collections to best the meet the needs of their clientele
.
1.3   RESEARCH QUESTIONS
i) What are the characteristics of users of academic library in Federal Polytechnic Nasarawa Library?
ii) What are the types of information needed by the users of academic library in Federal Polytechnic Nasarawa library?
iii)    To what extent are the information needs of users of Federal Polytechnic Nasarawa library?
iv) What are the problems encountered in a bid to meet the information needs by the users of Federal Polytechnic Nasarawa library?
v) What are the solutions to the problems of information needs by the users of Federal Polytechnic Nasarawa library?

1.4   OBJECTIVES OF THE STUDY
I) To identify the characteristics of users of academic library in Federal Polytechnic Nasarawa.
ii) To identify the types of information needed by the users of Federal Polytechnic Nasarawa.
iii)    To specify the extent of information needs of users of Federal Polytechnic Nasarawa library.
iv) To identify the problems encountered by the users of Federal Polytechnic Nasarawa library..
v) To proffer solutions to the problems encountered by the users of Federal Polytechnic Nasarawa library..

1.5   SIGNIFICANCE OF THE STUDY
i) The findings of this study will benefit the users of academic libraries in the sense that it will device means for efficient provision of their information needs.

ii) It will help the staff and students at all levels to realize the importance of academic libraries could play in information provision to academic dwellers so that they will assist by providing adequate materials for users to enable them update information materials in the library.

iii)    It would enable the libraries to realize the need to acquire requisite skills and competence on how to meet the needs of their clientele.

iv) Finally, it will help scholars and researchers in their research works as it will provide a background information to them.

1.6   SCOPE AND DELIMITATION OF THE STUDY
The study focuses on the information needs of users of academic library.  It therefore covers the Federal Polytechnic Nasarawa as the scope of the study.  The study does not focus on other similar institutions within or outside Nasarawa.

1.7   DEFINITION OF TERMS
For the purpose of this study, the following terms are defined by the researcher in accordance with their applications in the study.
  1.  Academic is an attribute of education in higher institutions of learning.
  2.  Academic library is any libraries found in the higher institution of learning.
  3. Information can be defined as a knowledge of a particular event or situation.
  4. Information technology: The study or use of electronic equipment, e.g. computers for storing, analyzing and distributing information of all kinds including words, numbers and pictures.
  5. Library: A collection of books and non-book materials organize for the benefit of its users.
  6. Needs: To require because they are important or useful and not simply because one would like to have them.

STATISTICAL ANALYSIS ON INFANT AND MATERNAL MORTALITY RATE IN NASARAWA AND KEFFI LGA, NASARAWA STATE FROM 1999-2015

STATISTICAL ANALYSIS ON INFANT AND MATERNAL MORTALITY RATE IN NASARAWA AND KEFFI LGA, NASARAWA STATE FROM 1999-2015

ABSTRACT
 This study is focused on  maternal and infant mortality in Nasarawa and Keffi LGA’s of Nasarawa state using age structure of women of child bearing age (15-49). Their mortality trend using descriptive statistic was also examined. Data in this study was collected from five hospitals in the two LGA’s with emphasis on maternal and infant mortality rate. Line graph was also used for preliminary analysis. The result obtained reveals that maternal mortality rate is very high in 2003 and 2006.The general fertility rate of women was high all through the years but higher in 2010. The number of women in the age 25-29, 30-34 was higher mostly, compared to other age groups and the age specific death rate was lower in age 20-24 and 25-29 years compared to other ages, in most cases. The neonatal mortality rate is higher than post- neonatal mortality rate in most cases except in 2013 and 2015 where post- neonatal is higher.

CHAPTER ONE
1.0     BACKGROUND OF THE STUDY
In April, the lancet published material mortality figures developed at the institute based at the University of Washington, seattle, USA Hogan, et al (2010). In September a different set was issued by UN agencies UNICEF, World Bank and world health organization, working in collaboration with technical experts from the University of Berkeley, California, USA,      WHO (2010).

However, maternal and child mortality is not a common event in several parts of the developing world. Mothers and children are at the highest risk for diseases and death while motherhood is often a positive and fulfilling experience for so many women, it is associated with ill-health and even death Olotoye (2009). The death of woman during pregnancy, labor or pueperium is a tragedy that carries a huge burden of grief and pain.
World health organization (WHO 2006) defines maternal death as the death of women during pregnancy or within 42 days of termination of pregnancy. Child mortality on the other hand is the death of a child under five years, while infant mortality is the death of a child under one year. Maternal mortality is a multi dimensional problem which does not only affect the family involved but also has a great effect on the society as a whole. When a mother dies the child chances of reaching adult life decreased. This is majority due to lack of everyday life and security. Younger ones may have to take care of themselves and this may in turn affect their school attendance. Lack of proper education may in turn weaken the child’s chances of reading better life standards.
His persistent high rate of infant and maternal mortality in the country is noted by Ogunjimi, Ibeand Ikorok(2012) negates the achievement of the 4th and 5th Millennium Development Goals (MDG’S). Nigeria, which constitutes just 1% of the world’s population, accounts for 10% of the world maternal and under-one (infant mortality) mortality rates.

Although, pregnancy is a physiological phenomenon women commonly experience physiological changes. Pregnancy may be accompanied by complication that could be of fatal consequences, pregnant women are thus prone to risk, it follows therefore, that the care of a pregnant women deserves the highest priority in every community especially Nasarawa and Keffi LGA’s of Nasarawa State where the present study is been carried out.

Infant and maternal mortality has implication not only to the family and community but also, to the nation at large with high incidence of infant and maternal mortality a nation is regarded as a developing country.

Nigeria is also working towards the improvement of maternal and child health through the primary health care component. The objective of these maternal and infant health services is to ensure that as far as possible, women remain healthy during pregnancy, that they have healthy babies and recover fully from the effect of pregnancy.

Nasarawa State is one of the states created on 1st October 1996. Health problem is Nasarawa State and Nigeria in particular and Africa at large are serious in terms of under five years, high fertility and low life expectancy. However, in some country 25% or more children less than five years of age dies before their fifth birthday, which is higher than developed countries Yakubu (2003).

1.2     STATEMENT OF THE PROBLEM
For any country that wants to achieve the objective of the World Health Organization (WHO) that is, reduction on the risk associated with child birth and child bearing, such country must equip all the health care services in her country.
This work tends to emphasis on the factors responsible for high infant and maternal mortality rate in Nasarawa and Keffi LGA’s in Nasarawa State. Despite the fact that there is establishment of the institution of a safe motherhood initiative in the health sector, maternal mortality is still very high-recurring from ignoring the main aim of safe motherhood initiative.

The factors responsible for maternal and infant mortality rate are outlined as follow
  1. Poverty
  2. Malnutrition
  3. Traditional belief
  4. Ignorance
  5. Carelessness of the obstetricians
1.3     AIM AND OBJECTIVES
1.3.1  AIM
The aim of this research work is to determine the rate of infant and maternal mortality in Nasarawa and Keffi LGA’s of Nasarawa State.

1.3.2  OBJECTIVES
          The objectives of this research work is to
  1. Estimate infant mortality rate in Nasarawa and Keffi LGA’s in       Nasarawa State.
  2. Estimate maternal mortality rate in Nasarawa and Keffi LGA’s in Nasarawa State.
  3. Determine the age specific mortality rate of women.
  4. Find out if death of infant occur mostly at neonatal (i.e death under         4 weeks) or post natal (death exactly 4 weeks to one years) in    Nasarawa and Keffi LGA in Nasarawa State.
  5. check if there is significant difference in maternal mortality, infant mortality, number of live birth and neonatal death between Nasarawa and keffi LGA’s, Nasarawa state.
  6. To forecast the rate of infant and maternal mortality in the next five years
1.4     SIGNIFICANCE OF THE STUDY
          This research work is significant for many reasons. It provide information on whether the age of mother is one the factors responsible for high infant and maternal mortality rate in Nasarawa and Keffi LGA’s in Nasarawa State. The research will be useful be both to the government and health personnel’s, researchers and equally useful to the expectant mothers in other to protect themselves and their unborn babies.
          It is also of paramount importance to nurses, obstetrician and gynecologist in carrying out their duty to reduce the rate of infant and maternal mortality in Nasarawa and Keffi LGA’s of Nasarawa State.

1.5     DELIMITATION OF THE STUDY
          This research work is limited to infant and maternal mortality in Nasarawa and Keffi LGA’s, Nasarawa State. Also, it is limited to three selected hospital in Nasarawa LGA (i.egeneral hospital, primary health care centre and Alpha clinic Nasarawa LGA, Nasarawa State) and two selected hospital in Keffi LGA (general hospital and Federal Medical Centre Keffi) from the year 1999-2015.

1.6     LIMITATION OF THE STUDY
          In the course of carrying out this research work, there are some limitation constraint to the scope of the research work, in which include
  1. Time constraint, the time given for this research work did not allow         for detailed investigation.
  2. Financial constraint.
1.7   RESEARCH HYPOTHESIS
Ho: = i.e. there is no significant difference in maternal death, infant death, number of live birth and neonatal death between Nasarawa and Keffi LGA’s, Nasarawa state.
H1: ≠ i.e. there is significant difference in maternal death, infant death, number of live birth and neonatal death between Nasarawa and Keffi LGA’s, Nasarawa state.

1.8     DEFINITION OF TERMS
          HOSPITAL: is a place or building where people who are ill/sick or injured are given medical treatment and care.
PREGNANCY: is a period where a woman is having a developing baby inside her womb.
MATERNAL MORTALITY: is a death of women during pregnancy or after delivery.
INFANT MORTALITY: is the death of a child from 0-1 year of age.
NEONATAL MORTALITY: is the death of a child under 4 weeks of age.
PRIMARY HEALTH CARE:  is the medical treatment pregnant woman receives during pregnancy.
NURSE: is a person whose job is to take care of sick or pregnant women usually in the hospital.
DOCTOR: is a person who has been trained in medical science, whose job is to treat people.
LIVE BIRTH: is the actual bearing of child.
OBSTETRICIANS: They are physicians who specialize in child birth.
TOXEMIA: It is an adverse reaction of toxic by-product of systemic infection.

IMPACT OF TRAINING AND DEVELOPMENT ON ORGANIZATIONS PRODUCTIVITY

IMPACT OF TRAINING AND DEVELOPMENT ON ORGANIZATIONS PRODUCTIVITY

(A case study of Federal Polytechnic Nasarawa)

CHAPTER ONE
INTRODUCTION
1.1 Background of the Study
The training and development of human resources in an organization involves the acquisition of additional knowledge or skills and the application of the acquired knowledge to enhance their performance. Training is undertaken because the individual lack skills to use in performing his or her duty effectively and efficiently. The essence of training therefore, is to improve skill of the employee. It is assumed that when people are recruited into organization, they do not know anything about the organization and their job until they are given some element of training. It is necessary for all organization to train and aid to the development of their employees. The training programmes are to recommend not only the new entrance but also the old ones to keep in touch with the latest appliance, techniques and method of carrying out their assignment. For the ones, the modern trends in technology have made training and development a must in all organizations. The world at present is advancing rapidly in technology and all organizations raises the morale of workers thereby widening a situation whereby an employee is frustrated because he or she has no satisfaction.

Increase in morale leads to increase productivity. The purpose of training is to develop skill and through the human resource development embrace all other diverse process which are aimed at transforming people so that they can contribute more effectively to social, political and economic development. During this period of economic recreation in the country, the country must embark on serious training activities.

Training is a development process which is oriented toward the need of the organization. The objectives of the company reflects on both present market situation of that organization and its future. Weather a man is operating on a complex machine tolls by the use of a computer or talking with consumers. He should have received training if his or her performance is to meet the set standard objective. Employees who have potentials should be developed in order to be capable of carrying out more responsibly jobs.

The main objectives of training therefore is to improve current performance and provide well training for their staff in order to meet the present and future needs of the organization.

The essence of this work therefore is to draw the attention of every organization in the country to the relevance of training and development of workers in their employment.

1.2 Statement of the Problem
There are general feelings that the performance of staff in any organization and at the Federal Polytechnic Nasarawa in particular could be far below the expected standard and most of them could be unskilled, ineffective and unproductive.
The general impression is that, this problem might be due to the fact that some of them if not most have never had any formal education and training in their respective areas of operation. It is in the light this assertions and feelings that this study is being undertaken in order to investigate the circumstance responsible for this problem.
Finally, the study will also seek to find out how much has been done by the Federal Polytechnic Nasarawa in the area of training and manpower development of its staff.

1.3 Objective of the Study
The objective of conducting this research is to ascertain the following:
  • To highlight the need for manpower training and development in the institution.
  • To access the staff recruitment, selecting and training programmes and from it, established some relationship between this programme and problems enumerated.
  • To highlight or identify some techniques of manpower training and development in the institution and their relevance to the institution needs and the organizations at large.
  • To establish the relationship between personnel training and development and staff performance.
  • To conduct an empirical investigation through a review of the manpower training and development policy of the FPN.
  • To correct the belief that in this age of computerization and technological development, all that institution need to survive the acquisition of modern capital equipment.
  • To proffer solutions to the identified problems.
1.4 Significance of the Study
The research will be paramount importance to the following Federal Polytechnic Nasarawa, employee of the Federal Government, organization research readers and future researcher.

The study will be of corrective measures to Federal Polytechnic Nasarawa (FPN) in areas where deficiency has been highlighted as it concerns the training and development of manpower in Nasarawa.

Finally, it will enable the staffs to appreciate the important role that the Federal Polytechnic Nasarawa plays in the life of the society.

1.5 Research Questions
The purpose of carrying out this research question is to gather data which will be used for research work only? Therefore all information provided will be kept secret and shall not be used for any other purpose than this analysis. The key question carried out during research work are:
  1. What are the social and personal benefit you achieve from training?
  2. To what extent does training and development improve the productivity in public organization?
  3. When did you attend any training programmes since you were employed into the institution?
1.5 Statement of Hypothesis
According to “Bewen and Star (1976): hypotheses are assumption we make about the value of population parameters.

Kerlizer (1972): assert hypothesis as a conjectural statement of relationship between two or more variable. Formulation of hypothesis is significant to research studies particularly as they specify directions among which researches are to be conducted and pinpointing the research problem for investigation.

Hypotheses consist of two varieties namely:

Alternative Hypothesis: It is represented by Hi and it’s normally stated in the positive.
Null Hypothesis: It is represented by Ho, it’s usually stated in negative form.
The testable hypotheses of the research study are stated below:
Ho:   Lack of adequate manpower training and development is not directly responsible for high labour turnover in Federal Polytechnic Nasarawa.
Hi:    Lack of adequate manpower training and development is directly responsible for high labour turnover in Federal Polytechnic Nasarawa.

1.6 Scope of the Study
This research work covers Federal Polytechnic Nasarawa in Nasarawa State. This is as a result of time constraint and other academics engagement which developed its impacts and effectiveness in an institution.

1.7 Limitations of the Study
The limitation of the study or problems encountered during the cause of research that can likely hinder the derivation of maximum result in the application of the research result include the following:
  • Lack of co – operation by some of staff of Federal Polytechnic Nasarawa to disclose information.
  • Lack of co – operation to grant excess interview and also time constraint.
1.8 Definition of Terms
Effect was made at defining the following terminologies use in this study to avoid ambiguity in bringing out its proper understanding.
  • Planning: Planning can be described as the process of setting goals and developing specific activities and procedures and schedule for meeting such goal.
  • Development: Development is a process of inculcating more job knowledge on the existing employees in an attempt to broad their experiences.
  • Manpower: Human capital represents the human factor in the organization, the combined intelligence skills and expects that gives the organization its distinctive character.
  • Training:Training is the process of impacting job knowledge on the newly recruited personnel so as to improve the level of performances.
  • Organization:Organization is defined as the structure or network of relationship among individuals and positions in a work setting and the process by which the structure is created maintained and used.
  • Productivity: Means on average measures of efficiency of production output. 
  • FPN: Means Federal Polytechnic Nasarawa.

DESIGN AND IMPLEMENTATION OF GRAPHIC DESIGN – A STUDY OF PLANE SHAPE

DESIGN AND IMPLEMENTATION OF GRAPHIC DESIGN – A STUDY OF PLANE SHAPE

ABSTRACT
Basically, it can be discovered that are a lot of problems in draw a plane shape manually. So this project is to draw and calculate plane shapes. Java is used to design this program, the program is in 2D and make work easy to draw and calculate some plane shapes likes (triangle, circle, rectangle, square etc.)

CHAPTER ONE
INTRODUCTION
INTRODUCTION
In computer science, a graphical user interface (GUI), is a type of user interface that allows users to interact with electronic devices through graphical icons and visual indicators such as secondary notation, instead of text-based user interfaces, typed command labels or text navigation. GUIs were introduced in reaction to the perceived steep learning curve of command-line interfaces (CLIs), which require commands to be typed on a computer keyboard.
The actions in a GUI are usually performed through direct manipulation of the graphical elements. Beyond computers, GUIs are used in many handheld mobile devices such as MP3 players, portable media players, gaming devices, smartphones and smaller household, office and industrial equipment. The term GUI tends not to be applied to other lower-display resolutiontypes of interfaces, such as video games (where head-up display (HUD) is preferred), or not restricted to flat screens, like volumetric displays because the term is restricted to the scope of two-dimensional display screens able to describe generic information, in the tradition of the computer science research at the Xerox Palo Alto Research Center (PARC).
Designing the visual composition and temporal behavior of a GUI is an important part of software application programming in the area of human–computer interaction. Its goal is to enhance the efficiency and ease of use for the underlying logical design of a stored program, a design discipline named usability. Methods of user-centered design are used to ensure that the visual language introduced in the design is well-tailored to the tasks.

1.1 BACKGROUND OF THE STUDY
Like many developments in the history of computing, some of the ideas for a GUI computer were thought of long before the technology was even available to build such a machine. One of the first people to express these ideas was Vannevar Bush. In the early 1930s he first wrote of a device he called the "Memex," which he envisioned as looking like a desk with two touch screen graphical displays, a keyboard, and a scanner attached to it. It would allow the user to access all human knowledge using connections very similar to how hyperlinks work. At this point, the digital computer had not been invented, so there was no way for such a device to actually work, and Bush's ideas were not widely read or discussed at that time.

However, starting in about 1937 several groups around the world started constructing digital computers. World War II provided much of the motivation and funding to produce programmable calculating machines, for everything from calculating artillery firing tables to cracking the enemy's secret codes. The perfection and commercial production of vacuum tubes provided the fast switching mechanisms these computers needed to be useful. In 1945, Bush revisited his older ideas in an article entitled "As We May Think," which was published in the Atlantic Monthly, and it was this essay that inspired a young Douglas Englebart to try and actually build such a machine

1.2 AIM AND OBJECTIVES OF THE STUDY
The aim of this study is to create an application that will be able to draw plane shapes and calculate the area and the perimeter of the shapes. The objectives of this study are as follow:
  1. To develop an application that will be able to a draw some plane shapes
  2. To create an application that will make learning easy for student.
  3. To develop an application that will draw accurate plane shapes
1.3 SIGNIFICANCE OF THE STUDY
The significance of this study is to show or import to the user the theoretical and physical way computerizing plane shapes. The computerizing will ensure accuracy, efficiency, and reducing the drudgery involved in the manual process of drawing and calculating plane shapes.
The application we help a lot in smooth drawing of various plane shapes, and helping in enabling student to be able to calculate area and perimeter of various plane shapes

1.4 RESEARCH METHODOLOGY
In order to get what I want java is use to write the program,

1.5 DEFINITION OF TERMS
  1. Graphics: - (from Greek graphikos, ‘something written’ e.g. autograph) are visual images or designs on some surface, such as a wall, canvas, screen, paper, or stone to inform, illustrate, or entertain.
  2. User: - An individual who uses a computer. This includes expert programmer as well as novices. An end user is any individual who runs an application program.
  3. Interface: - An interface is a shared boundary across which two separate components of a computer system exchange information.
  4. Plane: - This is an abstract surface which has infinite width and length, zero thickness, and zero curvature.
  5. Shape: - A shape is the form of an object or its external boundary, outline, or external surface, as opposed to other properties such as color, texture, or material composition.
  6. Plane shape: - A 2-dimensional shape. Has width and breadth, but no thickness

undefinedSOLD BY: Enems Project| ATTRIBUTES: Title, Abstract, Chapter 1-5 and Appendices|FORMAT: Microsoft Word| PRICE: N5000| BUY NOW |DELIVERY TIME: Immediately Payment is Confirmed

undefinedSOLD BY: Enems Project| ATTRIBUTES: Title, Abstract, Chapter 1-5 and Appendices|FORMAT: Microsoft Word| PRICE: N5000| BUY NOW |DELIVERY TIME: Immediately Payment is Confirmed