Showing posts with label profitability. Show all posts
Showing posts with label profitability. Show all posts

Thursday, 2 March 2023

THE EFFECT OF LIQUIDITY MANAGEMENT ON THE PROFITABILITY OF COMMERCIAL BANKS IN NIGERIA

THE EFFECT OF LIQUIDITY MANAGEMENT ON THE PROFITABILITY OF COMMERCIAL BANKS IN NIGERIA

(A case study of selected banks in Nigeria)

ABSTRACT

This work investigated the effect of liquidity on the profitability of bank in Nigeria. The work is necessitated by the need to find solution to liquidity management problems in Nigerian banking industry. Three banks were randomly selected to represent the entire banking industry in Nigeria. The proxies for liquidity management include cash and short term fund, bank balances and treasury bills and certificates, while profit after tax was the proxy for profitability. Elliot Rothenberg Stock (ERS) stationary test model was used to test the run association of the variables under study while regression analysis was used to test the hypothesis. The result of this study has shown that liquidity management is indeed a crucial problem in the Nigerian banking industry. The study therefore recommends that banks should engage competent and qualified personnel in order to ensure that right decision are adopted especially with the optimal level of liquidity and still maximize profit.

CHAPTER ONE

INTRODUCTION

1.1   Background of the Study

In every system, there are major components that are very important for the survival of the system. This is also applicable to the financial system. The financial institution have contributed immensely to the  growth of the entire financial system, as they offer an efficient institutional method through which resources can be mobilized and directed from less productive uses to more productive uses.

In performing these financial role, the financial institutions has proved to be an effective link between savers and borrowers, among the financial institutions that have partake in these important financial role are the commercial banks. The functions of the commercial banks have become the strong base for the two major functions of the commercial banks namely deposit mobilization and credit extension. Commercial banks have become a very important institution in the financial system as it helps in facilitating the movement of financial assets that are less desirable to the more desirable public who needed the financial assets. In view of this role and activities commercial banks play in the society, the commercial bank is selected as the main focus of this study.

An adequate financial intermediation requires the attention and focus of the bank management to the profitability and liquidity, which are the two conflicting objectives of the commercial banks. These objectives are parallel in the sense that an attempt for a bank to achieve higher profitability will gradually destroy its liquidity and solvency position and vice versa. Practically, profitability and liquidity are effective indicator of the corporate wealth and performance of not only commercial bank but to all profit oriented venture. These performance indicators are very important to the shareholders and depositors who are major publics of a bank. As the shareholders expect the bank to increase lending in order to give them maximum return in money invested while the depositor expect the bank to keep much idle cash in order to meet their demand. With profitability objective conflicting with that of liquidity, and with the interest of the shareholders conflicting with that of the depositors, there is the need for reconcile and harmonize these conflicting positions through effective liquidity management so as to ensure the survival and growth of the commercial banks.

1.2   Statement of Problem

Through these financial roles, the commercial banks use the idle funds borrowed from the lenders by investing such funds in other classes of financial assets investment. These business activities of the bank is not done without problem facing it, since these deposit which have been invested by the banks for profit maximization can be demanded for at any time. When the bank is not able to meet their financial obligations, the public begins to lose confidence and these will cause lot of competition to the financial sector. With the high increase of competition in the banking industry, every commercial bank should strive to operate on profit and at the same time meet the financial demand of its depositors by maintaining adequate liquidity. The problem then becomes how to select the optimum point at which commercial bank can maintain its assets in order to optimize these two objectives. These problems become more difficult as a large number of banks are basically engaged with profit maximization and tend to neglect the importance of liquidity management and these can lead to technical and legal insolvency.

This research work will also see to other problems such as the effect of excess liquidity and the problem of estimating the proportion of the deposits that can be demanded for at any specific time, selection of factors that will affect or influence the bank liquidity level and finally problem of satisfying the two major publics of the commercial bank simultaneously. With these solutions will be prescribe and recommendations will be made where necessary.

1.3   Objectives of the Study

The main objective of this study is to examine the effect of liquidity management on the profitability of commercial banks in Nigeria.

  1. To examine the effect of bank cash asset on profitability.
  2. To examine the effect of bank balance on profitability.
  3. To examine the effect of Treasury bill and certificate on profitability.

1.4   Research Questions

The following research questions are given consideration in this work:

  1. Does bank asset have any significant effect on profitability?
  2. How can bank balance have effect on profitability?
  3. What will be the effect of Treasury bill and certificate on profitability?

1.5   Statement of Hypothesis

From the statement of problem, objective of study and research questions of the study, the following hypotheses are formulated:

HOI:  There is no significant relationship between bank cash asset on profitability.

HO2:  There is a significant relationship between bank cash asset on profitability.

HO3:  There is no significant relationship between Treasury bill and certificate on profitability.

1.6   Significance of the Study

For the fact that commercial banks operate on liquidity and profitability motives in the mind to satisfy their major publics, the shareholder and depositor, the need arise for them to bring into agreement these two public concurrently. With this, the commercial bank need effective and efficient liquidity management approaches and principles that will help them realize these motives. The result gotten from this study will reveal the level of attachment of the commercial banks to the monetary policies (Liquidity ratios) established by the government and these will help the government to set appropriate liquidity ratios and cash ratios that will not be harmful to the operation and survival of the commercial banks. It will also help banks operations and credit policy guideline which affect profitability level and finally minimize the effect of liquidity and help in providing effective liquidity formulations.    

1.7   Scope of Study

This study examines the effect of liquidity management on commercial bank profitability. The variables used are liquidity management which was the proxies is bank cash asset, bank balance and treasury bill and certificates. Profitability which is the second variables was proxied by profit after tax.

1.8   Definition of Term

  1. Liquidity: Ability with which asset can be easily converted into cash. It also determines a firm ability to meet its short-term obligation.
  2. Liquidity management: The planning and control necessary to ensure that organization maintain liquid assets so as to meet its obligations to customers.
  3. Profitability: Profit is the ultimate measure of overall performance that is the excess of income over cost.
  4. Commercial bank: The business of receiving money from outside sources as deposits, irrespective of payment of interest and granting of money loan and acceptance of credit or purchase and sales of securities for the account of others or incurring of obligations to acquire claims in respect of loans prior to maturity.

Saturday, 15 January 2022

THE IMPACT OF MARKET SEGMENTATION ON THE SALES PERFORMANCE OF AN ORGANIZATION

THE IMPACT OF MARKET SEGMENTATION ON THE SALES PERFORMANCE OF AN ORGANIZATION

(A Case Study of Indomie Instant Noodle Sharada, Kano)

ABSTRACT

This research work is entitled “Impact Of Market Segmentation on Sales Performance” (A Case Study of Indomie Instant Noodle Sharada Kano). The aim is to identify the benefit of market segmentation on product positioning and also to identify the problem of market segmentation on service industry. Data for the study was collected from primary sources and was used to test the hypothesis. The empirical result reveals that the Indomie Instant Noodle Sharada Kano has been effective in the market segmentation. From the study so far, it is clear that market segmentation is necessary for any business to remain ongoing and for the growth of the company. 

CHAPTER ONE: INTRODUCTION

  1. BACKGROUND TO THE STUDY

In every society, consumers are the most important thing to consider while operating as any business. The satisfaction of these consumers now becomes the firm’s ultimate goal. In order to achieve this market it takes a lot of marketing strategies.

One of such strategies is market segmentation, which is a customer-oriented philosophy since no firm can produce and satisfy the whole market. Therefore, for any firm to produce and market its products and market its product effectively, it has to identify a sub-market within the aggregate market, select and reach with distinct marketing mix.

Today studies have revealed that a marketer‘s success depends on adequate knowledge of his market product and more specifically on his skills in effecting ownership transfers.

Sales performance uses raw data concerning the number of customers a sales associate speaks to compared with the number of actual sales. It indicates the rate of customer loyalty to the business or a specific employee. Enhancing sales performance can automatically enhance the number of loyal customers.

Sales performance can also indicate whether a department is overstaffed. By comparing the sales numbers based on the monetary amount spent on staffing, managers can determine ideal staffing levels.

1.1      STATEMENT OF THE PROBLEMS

An understanding of the meaning of market segmentation on sales performance and it impacts in serving the different market segments is one of the inherent problems in the most organization today. Identifying sub-markets either as a competitive strategy or as a measure to burden the market and promote a product to meet the needs of different customer group is a difficult task.

The marketer is faced with controllable variables like product, price, promotion, and distribution as well as uncontrollable variables like competition, economy, consumer demand, technology, a socio-cultural environment which summed involves huge financial burden.Wendle Smith (1990-1997)

Indomie Instant Noodles Sharada Kano.is an organization where the concept of market segmentation can successfully be applied. What management does is to identify and determine the segments existing in a market, to understand the make-up of segments and their needs.

The strength of all these becomes imperative for marketing managers to focus more of their attention on how best to develop strategies for its products, most of these problems on segmentation includes;

1.         The need to know whether segmentation is a good marketing strategy for sales performance.

2.         Whether it allows firms to develop specific products that really match the market demand.

3.         Whether it allows for the development of specific promotional message for each segment of the market.

1 .2     OBJECTIVES OF THE STUDY

The specific objectives of the research work are:

  1. To examine the relationship between market segmentation and product development.
  2. To examine the relationship between market segmentation and sales volume.
  3. To ascertain the effect of market segmentation on organization’s profitability.

1.3      RESEARCH QUESTIONS

The following research questions are designed to guide the study;

  1. What is the nature of the relationship between market segmentation and product development?
  2. What is the nature of the relationship between market segmentation and sales volume?
  3. What is the effect of market segmentation on organization profitability?

1.4     STATEMENT OF THE HYPOTHESIS

The following hypothesis is formulated for this study:

Ho 1: Market segmentation has no significant relationship with product development

Hi 1: Market segmentation has significant relationship with product development

Ho 2: Market segmentation has no positive relationship with sales performance

Hi 2: Market segmentation has positive relationship with sales performance

Ho3: Market segmentation has no significant impact on organization profitability

Ho 3: Market segmentation has no significant impact on organization profitability

1.5      SIGNIFICANCE OF THE STUDY

The study will be of great benefit to consumers and individuals in their purchasing pattern. It will serve as a base for further study in the same field or related field by students in tertiary institutions.

It will serve as a frontier of knowledge. It would be used to evaluate good or bad principles.

1.6   SCOPE OF THE STUDY

This study covers the impact of market segmentation on sales performance which is carried out onIndomie Instant Noodles Sharada Kano.

1.7     LIMITATION OF THE STUDY

There are many constraints and factors that were encountered by the research during the research work. The prominent once are:

  1. Financial Constraints: The cost of materials necessary to aid in carrying the research are very expensive, a lot of field work ought to have been done, but for inadequate finance, a limited coverage of the company understudy was embark upon.
  2. Time Constraints: Lack of time contributed greatly affected the quality of work, the academic session very short and the time given to submit the project work also short. Most of the information needed by the researcher in that information needed by the researcher in that company was not accessible for the sole reason of short notice. The study is limited to Abuja bottling company or plant because of time constraint.
  3. Biased Response: Biased response by the respondent was a problem encountered by the research when collecting data.

1.8     OPERATIONAL DEFINITION OF TERMS

Market segmentation is the activity of dividing a broad consumer or business market, normally consisting of existing and potential customers, into sub-groups of consumers (known as segments) based on some type of shared characteristics. Philip Kotler (1997).

MARKETING: According to Philip Kotler (1997) “Marketing can be defined as consumer satisfaction”, that is all marketing activities should be directed towards consumers satisfaction.

Mass marketing: It is trying to sell a product to everyone in a market. Don Debelak (1997)

Product: Can be defined as any commodity that has a monetary or commercial value. Philip Kotler (1997).

Sales: Are activities related to selling or the number of goods or services sold in a given time period.  David Jobber (2012).

Thursday, 30 December 2021

LOAN ADMINISTRATION AND PROFITABILITY OF COMMERCIAL BANKS IN NIGERIA: A STUDY OF THREE BANKS

LOAN ADMINISTRATION AND PROFITABILITY OF COMMERCIAL BANKS IN NIGERIA: A STUDY OF THREE BANKS

ABSTRACT

The study examined loans administration and profitability of commercial banks in Nigeria with particular reference to three selected deposit money banks. The specific objectives include to: examine the quantum of loan granted by the banks under study in Nigeria; examine the different categories of loans and credits of the banks under study in Nigeria;  assess the performance of the loans and credits granted by the Banks under study in Nigeria and investigate the impact of loan administration on profitability of the banks under study in Nigeria. The adopted econometric models in the analysis and data were presented in tabular and graphic forms, and analysed using statistical ratios, OLS simple regression and the ANOVA (f-test). From the data analyzed and validated by the tested hypothesis the findings of the study show that there is no significant relationship between non performing credits and profitability of banks and that there is a significant relationship between bank loans and profitability of the banks. Finally the study recommended that the management of the bank under study should strive to have more secured deposits for onward lending and that government should fine tune her mid-term and long-term financial planning, which will not easily be summersaulted. This will enable cooperate Nigeria to plan and project better on the projects upon which they will seek bank credit facilities, without defaulting.

Keywords: loan, credit, profitability, commercial bank

CHAPTER ONE

 INTRODUCTION

  1. Background to the Study

The Bank is a financial Institution established to provide financial services of accepting deposit from customers, providing credit facilities and other auxiliary functions aimed at meeting the financial service needs of the people and of facilitating the development and expansion of the real sector of the economy (Ahmad, 2007). Bank loan constitute an important source of providing finances to investors for the purpose of carrying out businesses and the creation of new investment to promote economic growth and wealth maximization both at the micro and macroeconomic sector. However the challenges of inaccessibility to loans and credit still persist in a larger dimension due to high interest rate, tight requirement for loan applications, non-conformity with the credit policies and sharp practices of some bank official (Ahmed, 2018).

Banks and other financial intermediaries play the important role of channeling funds from savers to borrowers (Gieseche, 2014). The traditional role of a bank is lending and loans make up the bulk of their assets.  The various areas of financial management have been studied in relation to bank performance and growth usually depicted by profitability. Financial institutions (particularly deposit money banks) have faced difficulties over the years for a multitude of reasons and the major cause of serious banking problems continues to be directly related to loan administration, poor portfolio risk management, or lack of attention to changes in economic or other circumstances that can lead to a deterioration in the credit standing of a bank’s counterparties (Gieseche, 2014).

The loan administration function of banks enhances the ability of investors to exploit desired profitable ventures. Loan administration is the main income generating activity of banks (Kargi, 2011). However, it exposes the banks to credit risk. The Basel Committee on Banking Supervision (2001) defined credit risk as the possibility of losing the outstanding loan partially or totally, due to credit events (default risk). Credit risk is an internal determinant of bank performance. The higher the exposure of a bank to credit risk, the higher the tendency of the banks to experience financial crisis and vice-versa. Among other risks faced by banks, credit risk plays an important role on banks’ profitability since a large chunk of banks’ revenue accrues from loans from which interest is derived. However, interest rate risk is directly linked to credit risk implying that high or increment in interest rate increases the chances of loan default. Credit risk and interest rate risk are intrinsically related to each other and not separable (Drehman, Sorensen, and Stringa, 2008).Increasing amount of non-performing loans in the credit portfolio is inimical to banks in achieving their objectives. Non-performing loan is the percentage of loan values that are not serviced for three months and above (Ahmad and Ariff, 2007).

The Nigerian banking industry has been strained by the deteriorating quality of its credit assets as a result of the significant dip in equity market indices, global oil prices and sudden depreciation of the naira against global currencies (BGL Banking Report, 2010).The poor quality of the banks’ loan assets hindered banks to extend more credit to the domestic economy, thereby adversely affecting economic performance. This prompted the Federal Government of Nigeria through the instrumentality of an Act of the National Assembly to establish the Asset Management Corporation of Nigeria (AMCON) in July, 2010 to provide a lasting solution to the recurring problems of non-performing loans that bedeviled Nigerian banks.

Therefore this study is interested in studying the credit and loans administration in Nigerian banks and how it affects their profitability.

1.2     Statement of the Problem

One of the major problems confronting the banking industry today is the increasing incidence of loan defaults and consequent loan losses which manifested on the profitability of the banks. Sequel to increasing incidence of huge bad debts in the Nigerian banking industry, insider’s abuses, management’s competence have been called to question. Bad debts, it must be noted occur due to the inability of the bank’s management to recover loans granted to customers.

According to Ahmad and Ariff (2017), most banks in economies such as Thailand, Indonesia, Malaysia, Japan and Mexico experienced high non-performing loans and significant increase in credit risk during financial and banking crises, which resulted in the closing down of several banks in Indonesia and Thailand. Loan administration is the most difficult task of the bank and it is uninteresting, this is because the bankers now deal with unfriendly customer. The customer who appeared very friendly at the time of advancing the loan may suddenly become very hostile and a problem to the bank when paying loan. Therefore it is against this background that this project seeks to examine the loan administrations and profitability of commercial banks in Nigeria.

1.3     Objectives of the study

The objective of this project is to examine loans administration and profitability of commercial banks in Nigeria with particular reference to three selected deposit money banks.

To achieve this, the following specific objectives shall be pursued:

  1. To examine the quantum of loan granted by the banks under study in Nigeria.
  2. To examine the different categories of loans and credits of the banks under study in Nigeria. 
  3. To assess the performance of the loans and credits granted by the Banks under study in Nigeria.
  4. To investigate the impact of loan administration on profitability of the banks under study in Nigeria.

1.4     Research Questions

The following questions are formulated in line with the objectives of the study to guide the researcher:

  1. What is the quantum of credits granted by the banks under study in Nigeria?
  2. What are the different categories of loans and credits administration of the Banks under study  in Nigeria?
  3. How has the loans and credits granted by the banks under study in Nigeria performed?
  4. What are the impacts of loan administration on profitability of the banks under study in Nigeria?

1.5     Statement of Research Hypothesis 

H0:   There is no significant relationship between non performing credits and profitability of banks.

H0:   There is no significant relationship between bank loans and profitability of banks.

1.6     Significance of the study

The findings of this study, credit and loan administrations in commercial banks: problems and prospects will be of great benefits to the banking sector which comprise the management of the banks and its customers as it will enlighten them of the importance of good credit and loan management in the banking industry.

The results of this research work will also be of use to the regulatory agencies as it will guide them in making relevant laws and policies that will enhance proper credit and loan administration that will provide enabling ground for the banks and customers to comply easily with the guiding principles of credit and loan administration and management thereby ensuring the profitability of the banks without necessarily overburden the customers high interest and arbitrary charges which may lead to high credit risk.

Finally, this study contribute to the wealth of knowledge, academia including authors, researchers and students will find this study relevant as it will serve as a resource material for literature review in future studies.

1.7     Scope of the study       

The scope of the study is to examine the impact of loan administration on profitability of commercial in Nigeria. The study is further limited to UBA, First Bank and  Access Bank plc between 2009 to 2019.

1.8     Limitations of the study

The limitations faced by the researcher in the course of this study include the following:

Finance: Lack of adequate funds tends to diminish the vital information that is supposed to obtain, which will thoroughly enhance the findings of this research work.

Data: The shortage of comprehensive information is another constraint of struggle by the research, since most of the banks employees especially the executives are reluctant to deliver relevant information of the bank that is useful to the research work.

Time Factor: Insufficient time to undertake the research was also identified as the constraint of the research work and the task of combining lectures and writing of assignments and presentations of term papers in the lecture hall was very cumbersome. Since most of the time, have to forfeit some of my lectures in other to meet up with my research work.

1.9     Definition of Terms

  1. Loans: According to shekhark (1961) the term ‘’loan” is popularly used to denote the granting of an advance in hump sum, generally on the basic of securities acceptable by the bank. The distinguished feature of loans is that interest on it is payable on the entire amount borrowed.
  2. Advance: These are credit that is payable in future time, e.g. loans, overdraft and discounting of bill e.t.c.
  3. Bank: This is a financial institution set up purposely for safe keeping of money, valuable item and document like wills, gold and jewelries.

undefinedSOLD BY: Enems Project| ATTRIBUTES: Title, Abstract, Chapter 1-5 and Appendices|FORMAT: Microsoft Word| PRICE: N5000| BUY NOW |DELIVERY TIME: Immediately Payment is Confirmed

undefinedSOLD BY: Enems Project| ATTRIBUTES: Title, Abstract, Chapter 1-5 and Appendices|FORMAT: Microsoft Word| PRICE: N5000| BUY NOW |DELIVERY TIME: Immediately Payment is Confirmed