Sunday, 27 November 2022

Preservation Of Organism And List The Common Method Of Preservation Of Vertebrates And Invertebrate

Preservation Of Organism And List The Common Method Of Preservation Of Vertebrates And Invertebrate

Preservation is the act, process, or result of preserving something: such as a the activity or process of keeping something valued alive, intact, or free from damage or decay.

Microorganisms require special preservation methods in order to ensure optimal long-term viability and genetic stability. The preservation methods used in the collections may differ.

Storage in liquid nitrogen is one of the best methods for preserving all microorganisms. For some viruses, it may be better to freeze the sample rapidly, but slow freezing with a cryoprotective agent is desirable for all other organisms to retain maximum viability or infectivity.

Preservation of micro-organisms by desiccation has been the preferred method for long term storage of cultures for decades. There are extensive culture collections that depend on these drying methods to preserve a huge diversity of cells for future propagation. In addition to culture collections, food and pharmaceutical industries have found drying technologies to be the preferred methods for preserving a multitude of different food and drug preparations in bulk quantities. Even with this worldwide usage of drying technologies, it would appear that there are still many varied methods of desiccating micro-organisms and that there is no generic drying method for all applications

Methods of preservation of vertebrates and invertebrates

The following points highlight the top six methods that are used for preservation of organisms. The methods are:

  1. Agar Slant Culture
  2. Agar Slant Culture Covered with Oil
  3. Saline Suspension
  4. Preservation at Very Low Temperature
  5. Preservation by Drying in Vacuum
  6. Lyophilization or Freeze Drying.
  7. Agar Slant Culture: Agar slants are prepared in vitro. After inoculation slants are incubated for a period of 24h and then stored in a refrigerator. These cultures require periodic transfer after six months.
  8. Agar Slant Culture Covered with Oil: The agar slants are incubated after inoculation until profuse growth appears. These are then covered with sterile mineral oil to a depth of 1 cm above the tip of the slanted surface. Transfers are made by removing a loopful of growth; touching the loop to the glass surface to drain off excess oil in the medium and then preserving the initial block culture.
  9. Saline Suspension: High concentration of sodium chloride is used as inhibitor of microorganisml growth. Microorganism are suspended in 1 % salt solution in screw cap tubes to prevent evaporation. The tubes are stored at room temperature and transfers are made on agar slants.
  10. Preservation at Very Low Temperature: The organisms are suspended in a nutrient broth containing 15% glycerol, or in skimmed milk containing 7.5% glucose. The suspensions are frozen and stored at -15°C to -30°C.  The ready availability of liquid nitrogen (-196°C) has provided another means of preservation of stock cultures. In this procedure, the cultures are frozen with a protective agent (glycerol or dimethyl sulfoxide) in sealed ampules. The frozen cultures are kept in liquid nitrogen flask.
  11. Preservation by Drying in Vacuum: The organisms are dried over CaCl2 in a vacuum, then stored in the refrigerator. The organism survives longer than when air dried.
  12. Lyophilization or Freeze Drying: The microbial suspension is placed in small vials. A thin film is frozen over the inside surface of the vial by rotating it in a mixture of dry ice or alcohol or acetone at a temperature of -78°C. The vials are connected to a high vacuum line. This dries the organism while still frozen. Finally, the ampoules are sealed off in a vacuum with a small flame.

No comments:

Post a Comment

undefinedSOLD BY: Enems Project| ATTRIBUTES: Title, Abstract, Chapter 1-5 and Appendices|FORMAT: Microsoft Word| PRICE: N5000| BUY NOW |DELIVERY TIME: Immediately Payment is Confirmed

undefinedSOLD BY: Enems Project| ATTRIBUTES: Title, Abstract, Chapter 1-5 and Appendices|FORMAT: Microsoft Word| PRICE: N5000| BUY NOW |DELIVERY TIME: Immediately Payment is Confirmed