Tuesday, 28 December 2021

AN APPRAISAL OF NOISE POLLUTION AND ITS EFFECT ON RESIDENTIAL PROPERTIES IN NASARAWA

AN APPRAISAL OF NOISE POLLUTION AND ITS EFFECT ON RESIDENTIAL PROPERTIES IN NASARAWA

ABSTRACT

This project focuses on appraisal of noise pollution and the effects on residential property in Nasarawa, Nasarawa State. Broadly speaking, the noise pollution has two sources, i.e. industrial and non- industrial. The industrial source includes the noise from various industries and big machines working at a very high speed and high noise intensity. Non- industrial source of noise includes the noise created by transport/vehicles traffic and the neighborhood noise generated by various noise pollution can also be divided in the categories, namely, natural and manmade. Most leading noise sources will fall into the following categories: roads traffic, aircraft, railroads,  construction, industry, noise in buildings, and consumer products. For effective results, this project is divided into five chapters, Chapter one introduce the project as well as statement of the project, aim and objectives, limitation of the study, scope and significance of the study and definition of terms. Chapter two discuses extensively on literature review Moreso, chapter three focus on research  method, data  collected both from the primary and secondary sources were analyzed using the questionnaire in chapter four. Finally, conclusions were drawn from the administered questionnaire and recommendations were made in chapter five.

CHAPTER ONE

INTRODUCTION

1.1       BACKGROUND TO THE STUDY

The present generation and the coming generations have to solve three grave problems, namely, population poverty and pollution if they have to survive. Pollution being the most dangerous problem likes cancer in which death is sure but slow. Pollution is assuming dangerous proportions all through the world. This is the gift of modern living, industrialization and urbanization. Unless timely action is taken we have a forbid and bleak future for the world. The word noise is derived from the Latin term nausea. It has been defined as unwanted sound, a potential hazard to health and communication dumped into the environment with regard to the adverse effect it may have on unwilling ears. (Odetayo (2012).

Noise can be heard as unwanted sound. Sound, which pleases the listeners, is music and that which causes pain and annoyance is noise. At times, what is music for some can be noise for other Section 2 (a) of the Air (Prevention and Control of Pollution) Act, 1981 includes noise in the definition of ‘air pollutant’. Section 2(a) air pollution means any solid, liquid or gaseous substance including noise present in the atmosphere such concentration as may be or tent  to injurious to human beings, other living creatures, plants, property and environment. According to Encyclopaedia Britannica: In acoustic noise is defined as any unwanted sound. In chambers 21st Century Dictionary the definition of noise has undergone a change. Noise pollution stands carved out as phrase separately from noise. The two are defined as under: Noise- a sound; a harsh disagreeable sound, or such sound; a din. Pollution: is an excessive or annoying degree of noise in a particular area, e.g. from traffic or aero plane engines.

Pollution is a noise derived from the verb pollute. Section 2 (c) of the Environment (Protection) Act, 1986 defines environmental pollution to mean the presence in the environment of any environmental pollutant. Section 2 (b) of the said Act defines environmental pollutant to means any solid, liquid or gaseous substance present in such concentration as may be ,or tends to be injurious to environment. Noise can be described as sound without agreeable musical quality or as an unwanted sound. Thus noise can be taken as a group of laud, non harmonious sounds or vibrations that are unpleasant and irritating to ear.

High noise levels can contribute to cardiovascular effects in humans, a rise in blood pressure, and an increase in stress and vasoconstriction, and an increased incidence of coronary artery disease. In animals, noise can increase the risk of death by altering predator or prey detection and avoidance, interfere with reproduction and navigation, and contribute to permanent hearing loss.

Noise pollution affects both health and behaviour. Unwanted sound (noise) can damage psychological health. Noise pollution can cause hypertension, high stress levels, tinnitus, hearing loss, sleep disturbances, and other harmful effects.

Sound becomes unwanted when it either interferes with normal activities such as sleeping, conversation, or disrupts or diminishes one’s quality of life.  Chronic exposure to noise may cause noise-induced hearing loss. Elderly ones exposed to significant occupational noise demonstrate more significantly reduced hearing sensitivity than their non-exposed peers, though differences in hearing sensitivity decrease with time and the two groups are indistinguishable by age 79. A comparison of Maaban tribesmen, who were insignificantly exposed to transportation or industrial noise, to a typical U.S. population showed that chronic exposure to moderately high levels of environmental noise contributes to hearing loss.

High noise levels can contribute to cardiovascular effects and exposure to moderately high levels during a single eight-hour period causes a statistical rise in blood pressure of five to ten points and an increase in stress, and vasoconstriction leading to the increased  blood pressure noted above, as well as to increased incidence of coronary artery disease. Noise pollution out cause annoyance. Means 2005 study by Spanish researchers found out that in urban areas households are willing to pay approximately four Eurosper decibel per year for noise reduction.  Noise can have a detrimental effect on wild animals, increasing the risk of death by changing the delicate balance in predator or prey detection, avoidance and interfering the use of the sounds in communication, especially in relation to reproduction and in navigation. Acoustic overexposure can lead to temporary or permanent loss of hearing. Therefore this project will appraise noise pollution and its effect on residential properties.

1.2       STATEMENT OF PROBLEM

Most of the industries use big machines which are capable of producing large amount of noise. Apart from that, various equipments like compressors, generators, exhaust fans, grinding mills also participate in producing big noise. Therefore, you must have seen workers in these factories and industries wearing ear plugs to minimize the effect of noise.

In Nigeria, the problem of noise pollution is wide spread. Several studies report that noise level in metropolitan cities exceeds specified standard limits. A study carried out by Odetayo  and Makinde  (2012) et al. conducted in Osogbo, Nigeria found out that the noise pollution level in the city was about 3 decibel (A) to 10 decibel(A) (decibel means intensity of a sound) above the recommended upper limit of 82 decibel(A). Akande et al, also found out that the peak noise level at road junction in Abraka, Nigeria to be 100 decibel (A). This noise level is higher than the recommended level of 60 decibel (A) for commercial and residential areas. Akandeet al (2013) .investigated the level of noise pollution in selected industrial locations in Osogbo Osun State, Nigeria. The average ambient noise level in Sawmills, Electro-acoustic market and food processing industrial areas was determined to be above 90 decibel (A). This noise level is well above the healthy noise level of 60 decibel (A). Therefore this study intends to focus on the effect of noise pollution on residential property value.

1.3       AIM AND OBJECTIVES  

The aim of this study is to examine the effect of  noise pollution on residential property value in Nasarawa town of Nasarawa State with the view to minimizing  the effect noise pollution.

The objectives set to achieve the aim are as follows;

  1. To identify the type of noise pollution in Nasarawa town.
  2. To ascertain the source of noise in the study area
  3. To determine the effect of noise pollution on rental value of residential properties in the study area
  4. To examine the trend of residential properties value between 2010 to 2020 within the study area.

1.4       RESEARCH QUESTIONS

  1. What the type of noise pollution in Nasarawa town?
  2. What are the sources of noise in the study area?
  3. What is the effect of noise pollution on rental value of residential properties in the study area?
  4. What is the trend of residential properties value between 2010 to 2020 within the study area?

1.5       SIGNIFICANCE OF THE STUDY

Apart from the damaged to the ear which result to permanent hearing loss or temporary hearing loss, Noise also has adverse effect on residential properties. Therefore this project elaborately highlight how to reduce the danger of the properties to bridges and monuments, to reduce noise waves which struck the walls and put the building in danger condition and It reduce the  weakens of noise and the edifice of buildings

1.7       DEFINITION OF TERMS

  1. Pollution is the introduction of contaminants into the natural environment that cause adverse change. Pollution can take the form of chemical substances or energy, such as noise, heat or light. Pollutants, the components of pollution, can be either foreign substances/energies or naturally occurring contaminants. Pollution is often classed as point source or nonpoint source pollution.
  2. NOISE: Noise means any unwanted sound. Sounds, particularly loud ones, that disturb people or make it difficult to hear wanted sounds, are noise. For example, conversations of other people may be called noise by people not involved in any of them; any unwanted sound such as domesticated dogs barking, neighbours playing loud music, portable mechanical saws, road traffic sounds, or a distant aircraft in quiet countryside, is called noise.
  3. PROPERTY: property is defined as the exclusive right a man has or possess in land, being that right which one has to lands or tenants, goods or chattels which does not depend on another’s courtesy. Also, it has three connotations: right of ownership, the object of ownership, and valuable things. Appraisal perceives property as importing unto itself all these ingredients, both in law and common usage, namely, tangible, intangible, and rights; ownership; monetary value; and legal assertion.
  4. RESIDENTIAL: A residential area is a land use in which housing predominates, as opposed to industrial and commercial areas. Housing may vary significantly between, and through, residential areas. These include single-family housing, multi-family residential, or mobile homes. Zoning for residential use may permit some services or work opportunities or may totally exclude business and industry. It may permit high density land use or only permit low density uses. Residential zoning usually includes a smaller floor area ratio than business, commercial or industrial/manufacturing zoning. The area may be large or small.

A highway:  is any public road or other public way on land. It is used for major roads, but also includes other public roads and public tracks: It is not an equivalent term to freeway (motorway).

No comments:

Post a Comment

undefinedSOLD BY: Enems Project| ATTRIBUTES: Title, Abstract, Chapter 1-5 and Appendices|FORMAT: Microsoft Word| PRICE: N5000| BUY NOW |DELIVERY TIME: Immediately Payment is Confirmed

undefinedSOLD BY: Enems Project| ATTRIBUTES: Title, Abstract, Chapter 1-5 and Appendices|FORMAT: Microsoft Word| PRICE: N5000| BUY NOW |DELIVERY TIME: Immediately Payment is Confirmed