Monday, 4 July 2016

Quantitative Risk Analysis

Quantitative Risk Analysis

This analysis uses numerical values of probability of risk events (or variables and risk factors) and their consequences. This is based on based on a simultaneous evaluation of the impact of all identified and quantified risks.

The first approach of risk analysis process is to determine in which progress level of project the evaluation has to be conducted. In this case, WBS diagrams are very important. Work Breakdown Structures is the hierarchical decomposition structure of a project tasks and can be set at different level of detail (project/ phases/ tasks/ subtasks), each one attached to corresponding actor(s) and resources.

Aleshin, (2001) believes that there is an interconnection between WBS of a project and its Risk Breakdown Structure (RBS) is a useful technique to associate risks. According to (Hillson et al., 2006), RBS can be used as a tool to structure the risk management process.

The quantitative methods rely on probability distribution of risks and may give more objective results than the qualitative methods, if sufficient current data is available. On the other hand, qualitative methods depend on the personal judgment and past experiences of the analyst and the results may vary from person to person. Hence the quantitative methods are preferred by most analysts (Ahmed et al, 2001). When thorough quantitative risk analysis is necessary it can take two alternative approaches (Kuismanen, 2001):

i. risks can be quantified as individual entities while looking at the big picture. This way can include the cumulative effects (to certain accuracy) into each individual risk and thus make more accurate estimations of the net value of the risks.

ii. Alternatively modeling the mathematical properties of the interrelations from the bottom up can be started and then calculate the net impact of each risk including the effects of interrelations”.

 Basic Steps of Quantitative Risk Analysis

When quantitative risk analysis is to be done, it is attempted to describe risk in numerical terms. A typical qualitative risk assessment usually includes the following step :

i. Define the consequence; define the required numerical estimate of risk.

ii. Construct a pathway; consider of all sequential events that must occur for the adverse event to occur.

iii. Build a model – Collect data; consider each step on the pathway and the corresponding variables for those steps.

iv. Estimate the risk; once the model has been constructed and the data collected the risk can be estimated. Included in this estimation will be an analysis of the effects of changing model variables to reflect potential risk management strategies.

v. Undertake a sensitivity and scenario analysis; Undertaking a risk analysis requires more information than for sensitivity analysis”.

Methods of Quantitative Risk Analysis

Any specific risk analysis technique is going to require a strategy which will a good base for analysis.

  • Probability Analysis is a tool in investigating problems which do not have a single value solution, Monte Carlo Simulation is the most easily used form of probability analysis.
  • Monte Carlo Simulation is presented as the technique of primary interest because it is the tool that is used most often.
  • Sensitivity Analysis is a tool that has been used to great extent by most risk analysts at one time to another.
  • Breakeven Analysis is an application of a sensitivity analysis. It can be used to measure the key variables which show a project to be attractive or unattractive.
  • Scenario Analysis is a rather grand name for another derivative of sensitivity analysis technique which tests alternative scenarios; the aim is to consider various scenarios as options”.
Risk Response Practices

According to PMI, (1996) suggested three ways of responding to risk in projects, these are as follows:

  • Avoidance: eliminating a specific threat, usually by eliminating the cause. The project management team can never eliminate all risks, but specific risk events can often be eliminated.
  • Mitigation: reducing the expected monetary value at risk events by reducing the probability of occurrence (e.g, using new technology), reducing the risk event value (e.g, buying insurance), or both.
  • Acceptance: accepting the consequences. Acceptance can be active by developing a contingency plan to execute should the risk event occur or passive by accepting a lower profit if some activities overrun.
    Abu Rizk, (2003) suggested some actions to be taken in response to residual risks. Actions can include:
  • Reduce uncertainty by obtaining more information, this leads to re-evaluation of the likelihood and impact.
  • Eliminate or avoid the risk factor through means such as a partial or complete re-design, a different strategy or method etc.
  • Transfer the risk element by contracting out affect work.
  • Insure against the occurrence of the factor.
  • Abort the project if the risk is intolerable and no other means can be undertaken to mitigate its damages.

According to Ahmed et al., (2001), Akintoyne and MacLeod (1997), Enshassi and Mayer (2001), and Education and Learning Whales. (2001) argued that there are four unique ways of responding to risks in a construction project, namely, risk avoidance, risk reduction, risk retention and risk transfer.

1. RISK AVOIDANCE
This is sometimes referred to as risk elimination. Risk avoidance in construction is not generally recognized to be impractical as it may lead to projects not going ahead, because there is no project without a form of risk. A contractor not placing a bid or the owner not proceeding with project funding are two examples of totally eliminating the risks. There are a varioius of ways through which risks can be avoided, e.g. tendering a very high bid; placing conditions on the bid; pre-contract negotiations as to which party takes certain risks; and not biding on the high risk portion of the contract (Flanagan and Norman, 1993).

2. RISK TRANSFER
This is basically trying to transfer the risk to another party. For a construction project, an insurance premium would not relieve all risks, although it gives some benefits as a potential loss is covered by fixed costs (Tummala and Burchett,1999).

The transfer of risk can take two basic form :

  • The property or activity responsible for the risk may be transferred, i.e. hire a subcontractor to work on a hazardous process;
  •   The property or activity may be retained, but the financial risk transferred, i.e. by methods such as insurance and surety.

3. RISK RETENTION
This is the method of reducing controlling risks by internal management (Zhi, 1995); handling risks by the company who is undertaking the project where risk avoidance is impossible, possible financial loss is small, probability of occurrence is negligible and transfer is uneconomic (Akintoyne and MacLeod,1997). The risks, foreseen or unforeseen, are controlled and financed by the company or contractor. There are two retention methods, active and passive;

A. Active retention (sometimes referred to as self-insurance) is a deliberate management strategy after a conscious evaluation of the possible losses and costs of alternative ways of handling risks.

B. Passive retention (sometimes called non-insurance), however, occurs through negligence, ignorance or absence of decision, e.g. a risk has not been identified and handling the consequences of that risk must be borne by the contractor performing the work.

4. RISK REDUCTION

This is a general term for reducing probability and/or consequences of an adverse risk event. In the extreme case, this can lead to eliminate entirely, as seen in “risk avoidance”. However, in reduction, it is not sufficient to consider only the resultant expected value, because, if potential impact is above certain level, the risk remains unacceptable. In this case, one of the other approaches will have to be adopted (Piney, 2002)”.

Risk Analysis

Risk Analysis

Risk analysis process is an important connection between systematic identification of risks and rational management of the significant risks. The risk analysis process aims to evaluate the consequences associated with risks and to assess the impact of risk by using risk analysis and measurement techniques (Flanagan and Norman, 1993).

The aim behind risk analysis is a precise and objective calculation of risk, to the extent that this is possible, it allows the decision making process to be more certain (Estate Management Manual, 2002).

The purpose of risk analysis is that it attempts to capture all feasible options and to analyze the various outcomes of any decision. For building projects, clients are mainly interested in the most likely price, but projects do have cost over-runs and, too frequently, the ‘what if’ question is not asked (Flanagan and Norman, 1993).

Risk analysis involves assessing the identified risks. This first requires that the risks are quantified in terms of their effect on cost, time or revenue.

They can be analyzed by measuring their effects on the economic parameters of the project or process. In terms of risk response, three general types of response can be identified (Estate Management Manual, 2002):

  1. Risk avoidance or reduction.
  2. Risk transfer.
  3. Risk retention”.

“The use of risk analysis gives an insight into what happens if the project does not proceed according to plan. When active minds are applied to the best available data in a structured and systematic way, there will be a clearer vision of the risks than would have been achieved by intuition alone (Flanagan and Norman, 1993)”.

“The importance of risk analysis to help project managers control cost that is relatively simple to apply, can be used throughout the life cycle of a construction project, accounts for the tendency of construction professionals to apply risk in linguistic terms, and apply their experience (Bender and Ayyub, 2001)”.

Methods of Risk Analysis

Analysis of risks are of two (2) types Quantitative or Qualitative in nature depending on the amount of information available (APM, 2000). Qualitative analysis focuses on identification together with assessment of risk, and quantitative analysis focuses on the evaluation of risk (Chapman, 2001). Then table below, summarize the various techinque used for risk analysis.

Qualitative Analysis

“This is based on a descriptive or nominal scale to describe risk events and their consequences. This analysis is mainly used in an initial evaluation of risks or for a rapid assessment. It can also be used when there is little knowledge about probability and/or impact. This method allows to identify the individual risks events with the most significant influence on project objectives. The risk events which are assessed as high priority may be further analyzed using quantitative risk analysis methods”.

“Lowe, (2002) introduced a definition for the qualitative assessment of risk involves the identification of a hierarchy of risks, their scope, factors that cause them to occur and potential dependencies. The hierarchy is based on the probability of the event and the impact on the project. In qualitative risk analysis risk management acts as a means to registering the properties of each risk (Kuismanen et al, 2002). Qualitative risk analysis assesses the importance of the identified risks and develops prioritized lists of these risks for further analysis or direct mitigation. The management team assesses each identified risk for its probability of occurring and its impact on project objectives. Sometimes experts or functional units assess the risks in their respective fields and share these assessments with the team (Office of project management process improvement, 2003). Components of risk analysis were introduced by Kindinger and Darby (2000):

  1. List activities, tasks, or elements that make up the project.
  2. Identify applicable risk factors.
  3. Develop risk-ranking scale for each risk factor.
  4. Rank risk for each activity for each risk activity.
  5. Document the results and identify potential risk-reduction actions.

Uses of Qualitative Risk Analysis Results

Qualitative risk analysis results are used to aid the project management team in three important ways (Kindinger and Darby, 2000):

  1. The qualitative risk analysis factor rankings for each project activity provide a first-order prioritization of project risks before the application of risk reduction actions.
  2. The more meaningful, result from conducting a qualitative risk analysis is the identification of possible risk-reduction actions responding to the identified risk factors. Risk reduction recommendations are often       straightforward to make when the risk issue is identified.
  3. The final use of the qualitative risk analysis is the development of input distributions for qualitative and quantitative risk modeling. The integrated qualitative and quantitative risk analysis is shown below”.

Risk Management Process

Risk Management Process

Various risk management process have been proposed. Boehm (cited in Raz and Michael, 2001) suggested that the process consist of two main phases: risk assessment, which includes identification, analysis and prioritization, and risk control which includes risk management planning, risk resolution and risk monitoring planning, tracking and corrective action. Chapman and Ward (cited in Tummala and Burchett, 1999) identified risk management approach as a multiphase `risk analysis’ which covers identification, evaluation, control and management of risks. Simmons, (1998) provided a definition for the risk management as the sum of all proactive management directed activities, within a program that is intended to acceptably accommodate the possibly failures in elements of the program.

“Acceptably” is as judged by the customer in the final analysis, but from a firm’s perspective a failure is anything accomplished in less than a professional manner and/or with less than-adequate result. Al-Bahar cited in (Ahmed et al, 1999) defined the risk management as a formal orderly process for systematically identifying, analyzing, and responding to risk events throughout the life of a project to obtain the optimum or acceptable degree of risk elimination or control”.

It is management’s job to do the planning that will accommodate the possibilities. The customer is the final judge, but internal goals should be to a higher level than the client or customer expectations. Risk management as a shared or centralized activity must accomplish the following tasks (Simmons, 1998):

i. Identity concerns.
ii. Identify risks & risk owners.
iii. Evaluate the risks as to likelihood and consequences.
iv. Assess the options for accommodating the risks.
v. Prioritize the risk management efforts.
vi. Develop risk management plans.
vii. Authorize the implementation of the risk management plans.
viii. Track the risk management efforts and manage accordingly.
Chapman and Ward (1997) outlined a generic risk management process consisting of nine phases:
1. Define the key aspects of the project;
2. Focus on a strategic approach to risk management;
3. Identify where risks may arise;
4. Structure the information about risk assumption and relationships;
5. Assign ownership of risks and responses;
6. Estimate the extent of uncertainty;
7. Evaluate the relative magnitude of the various risks;
8. Plan response;
9. Manage by monitoring and controlling execution.

According to the Project Management Body of Knowledge (PMI,1996), risk management forms one of the so-called nine functions of project management (the other eight being integration, communications, human resources, time, cost, scope, quality and procurement management). It is basically know that the In the PMBOK, PMI (1996) presents four phases of the risk management process: identification, quantification, responses development and control. Risk Management covers the process of identification, assessment, allocation, and management of all project risks (APM, 2000). Healy cited in (Shen, 1997) suggested a systematic process including risk identification, risk analysis and risk response, where risk response has been further divided into the four actions: risk retention, risk reduction, risk transfer and risk avoidance. Risk management is also seen as a process that accompanies the project from its definition through its planning, execution and control phases up to its completion and closure (Raz and Michael, 2001). Risk management measures the potential changes in value that will be experienced in a portfolio as a result of differences in the environment between now and some future point in time (Dembo and Freeman, 1998)”.

The Risk Management Framework

The widely accepted view is that risk management is an iterative process (see e.g. Al-Bahar and Crandall (1990), Chapman and Ward (2000) and PMI (2000)), involving risk identification, risk analysis and evaluation, risk response management, and the system administration supported by a risk management database.

Risk Management - Definition, Importance and Benefits

Risk Management – Definition, Importance and Benefits

What Is Risk Management?

Risk management is can be defined “as a set of principles and practices aimed at identifying , analyzing and handling risk factors to improve the chances of achieving a successful project outcome and/or avoid project failure (Boehm, 1989, 1991; Charette, 1989; Kerzner, 2003).

Risk management ensures that an organization identifies and understands the risks to which it is exposed. Risk management also guarantees that the organization creates and implements an effective plan to prevent losses or reduce the impact if a loss occurs.

Risk management is probably the most difficult aspect of project management. A project manager must be able to recognise and identify the root causes of risks and to trace these causes through the project to their consequences. Furthermore, risk management in the construction project management context is a comprehensive and systematic way of identifying, analyzing and responding to risks to achieve the project objectives. The use of risk management from the early stages of a project, where major decisions such as choice of alignment and selection of construction methods can be influenced, is essential. The benefits of the risk management process include identifying and analyzing risks, and improvement of construction project management processes and effective use of resources.

The construction industry is heterogeneous and enormously complex. There are several major classifications of construction that differ markedly from one another: housing, non-residential building, heavy, highway, utility, and industrial. Construction projects include new construction, renovation, and demolition for both residential and non-residential projects, as well as public works projects, such as streets, roads, highways, utility plants, bridges, tunnels, and overpasses. The success parameters for any project are in time completion, within specific budget and requisite performance (technical requirement).

The main barriers for their achievement are the change in the project environment. The problem multiplies with the size of the project as uncertainties in project outcome increase with size. Large construction projects are expose d to uncertain environment because of such factors as planning, design and construction complexity, presence of various interest groups (owner, consultants, contractors, suppliers, etc.), resources (manpower, materials, equipment, and funds) availability, environmental factors, the economic and political environment and statutory regulations”.

A risk management plan includes strategies and techniques for recognizing and confronting these threats. Good risk management doesn’t have to be expensive or time consuming; it may be as uncomplicated as answering these three questions:

1. What can go wrong?

2. What will we do, both to prevent the harm from occurring and in response to the harm or loss?

3. If something happens, how will we pay for it?

Risk management is a process for identifying, assessing, and prioritizing risks of different kinds. (Risk, 2013) Once the risks are identified, the risk manager will create a plan to minimize or eliminate the impact of negative events. A variety of strategies is available, depending on the type of risk and the type of construction. “According to a scientific literature review on project, risk management led to findings of variety of “Risk” (PMI, 2008; Baloi and prince. 2003; Barber, 2005; Chapman and Ward, 2002; Flanagan and Norman, 1993; IEC, 2001; Jaafari, 2001; Smith et al., 2006). Several of these definitions have a common feature: they define risk in terms of uncertain events and their impact on project objectives. The international standard “Project risk management–Application guidelines” uses the terms probability and consequence and defines risk as a combination of the occurrence probability of an event and its consequences on project objectives (IEC, 2001). According to PMI (2008), risk is defined as “an uncertain event or condition that, if it occurs, has a positive or negative effect on one of project objectives”. Ward and Chapman (2003) discuss the concept of risk in greater detail and suggest using a more general concept of uncertainty.

They argue that the term “risk” is often associated with adversity and focus on threats, not opportunities. The questionnaire survey conducted by Akintoye and MacLeod, (1997) strengthens the argument, showing that the majority of respondents perceive risk as a negative event”.

There are various contradictory and different meanings attached to “risk” which lead to widespread confusion and also brings different approaches to risk management which are taken in different fields. An example, in a research by Zhi (1995), the major risk factors of the overseas construction projects have been identified and the risks are classified in terms of their initial sources which include the external and internal aspects of an overseas construction project. Some of the identified risks are: defective physical works, schedule delay, cost overrun, social environment, market fluctuation, etc. The problem is that, all the items are ambiguously called RISK, while schedule delay and cost overrun are the “consequence” on the project objectives and the other items are the “source” of difficulties.

The objectives of risk management are to ensure the rapid identification of risks within the business and to establish a clear process of assessment, action planning and reporting of the risks identified. In addition, it is important that concentration is given to the identification of opportunities as this will enable effective decision making to ensure that:

1. Business opportunities can be quickly assessed at an appropriate level in order to decide whether and how it might proceed with such opportunities.

2. Threats to the project or other parts of the company’s operations can be eliminated or at least reduced to an acceptable level.

3. All decisions take account of contributing to sustainable shareholder value.

The basic principle is that key risks and the appropriate control measures are kept under regular review and reported to project team, project sponsors and key client representatives”.

Why is Risk and Risk Management Important?

A risk which is being controlled leads to reward that provides independent risk management consultancy, which offers technical support service and for internal audit and provides solutions for construction firm (Risk Reward Limited, 2010).

The primary objective of any company is to maximise profit, so therefore the firm appoint agents (managers) who takes various investing and financing decisions to achieve the firm’s objectives. The main criteria are to maximise returns and minimise risks related to any decision.

Risk management is probably the most difficult aspect of project management. A project manager must be able to recognise and identify the root causes of risks and to trace these causes through the project to their consequences. Furthermore, risk management in the construction project management context is a comprehensive and systematic way of identifying, analyzing and responding to risks to achieve the project objectives.

Basically, “from the organizational perspective, risk arises when organizations pursue opportunities in the face of uncertainty, constrained by capability and cost. The challenge is to find a position on each of these dimensions that, in combination, represents a risk profile that is appropriate to the initiative and acceptable to internal and external stakeholders. Consequently, risk and risk management are strategic and governance issues that usually involve a compromise: a risk adverse strategy can limit distinctive achievement; however, a risk-embracing strategy can increase project losses. Explicitly managing this balance is often under-played or overlooked in the pursuit of desired goals (Charette, 2005).

Benefits of Managing Risk

Risk management provides a clear and structured approach to identifying risks. Having a clear understanding of all risks allows an organization to measure and prioritize them and take the appropriate actions to reduce losses. Risk management has other benefits for an organization, including:

  • Saving resources: Time, assets, income, property and people are all valuable resources that can be saved if fewer claims occur.
  • Protecting the reputation and public image of the organization.
  • Preventing or reducing legal liability and increasing the stability of operations.
  • Protecting people from harm.
  •  Protecting the environment.
  •  Enhancing the ability to prepare for various circumstances.
  • Reducing liabilities.
  • Assisting in clearly defining insurance needs.

An effective risk management practice does not eliminate risks. However, having an effective and operational risk management practice shows an insurer that your organization is committed to loss reduction or prevention. It makes your organization a better risk to insure.

Risk Definition and sources in Construction Industry

Risk Definition and sources in Construction Industry

Risk – Definition

Risk can be defined as an uncertain event or condition that, if it occurs, has a positive or a negative effect on a project objective. A risk has a cause and, if it occurs, a consequence (Office of project management process improvement, 2003)”. “Risk is part of every human endeavor. From the moment we get up in the morning, drive or take public transportation to get to school or to work until we get back into our beds ( and perhaps even afterwards ), we are exposed to risks of different degrees.

What makes the study of risks fascinating is that while some of this risk bearing may not be completely voluntary, we seek out some risks on our own (speeding on the highways or gambling, for instance) and enjoy them. In 1921, Frank Knight summarized the difference between risk and uncertainty as “uncertainty must be taken in a sense radically distinct from the familiar notion of Risk, from which it has never been properly separated. The essential fact is that “risk” means in some cases a quantity susceptible of measurement, while at other times it is something distinctly not of this character; and there are far reaching and crucial differences in the bearings of the phenomena depending on which of the two is really present and operating.

The Project Management Institute (1996) introduced a simple definition for risks as a discrete occurrence that may affect the project for better or worse. In order to emphasize the major objectives of survey on risks management actions, risk has been defined as the probability of occurrence of some uncertain, unpredictable and even undesirable events that would change the prospects for the profitability on a given investment (Kartam, 2001). Chicken and Posner (cited in Greene, 2001) provide their interpretation of what a risk constituents:

                                                   Risk = Hazard x Exposure

They defined hazard as “the way in which a thing or a situation can cause harm”, and exposure as “the extent to which the likely recipient of the harm can be influenced by the hazard”. Harm is taken to imply injury, damage, loss of performance and finance, whilst exposure imbues the notions of frequency and probability. Risks are the triple characteristic of any project decision in the situation of uncertainty. It can be defined as a trinity of risk event (A), risk probability (P) and function of risk losses (u):

                                                                 R= (A,P,u)

The risks event (A) is a random event which is connected with any project decision (Titarenko, 1997). Uncertainty is a situation in which a number of possibilities exist and which of them has occurred, or will occur, is unknown. Considering all risks are uncertain but not all uncertainty is risky (Yoe, 2000)”.

Causes of Risk

“There is little or no comprehensive study explaining the causes of risks among construction companies, moreover research covering the subject matter has tried to identify the symptoms rather than causes, a number of authors have attempted in their studies to ascertain the causes of threats in the construction industry, Kangari (cited in Rwelamila and Lobelo, 1997) ascribed the high threats to:

  1. A highly fragmented industry.
  2. Industry highly sensitive to economic cycles.
  3. Fierce competition as result of an over-capacitated market.
  4. Relative ease of entry.
  5. Management problems.
  6. Trading including:

a. Competitive quoting.

b. Outsize projects.

c. High gearing.

d. Resistance to change.

7. Accounting, where inconsistencies occur in the financial data generated for management.

8. Increase in project size.

9. Unfamiliarity with new geographic area.

10. Moving into new type of construction.

11. Change in key personnel.

Sources of Risks

According to (Estate Management Manual, 2001) sources of risks include:

  1. Commercial risks.
  2. Financial risks.
  3. Legal risks.
  4. Political risks.
  5. Social risks.
  6. Environmental risks.
  7. Communications risks.
  8. Geographical risks.
  9. Geotechnical risks.
  10. Construction risks.
  11. Technological risks.
  12. Operational risks.
  13. Demand/product risks.
  14. Management risks.

These sources of risks are related to project-specific and non-project-specific risks, as both types of risk need to be considered when identifying the risks in a project or a process.

The division of risks into source elements can be difficult. It also creates the potential for increased personal subjectivity. It can also lead to the possibility of “double-counting” some risks by attributing the same risk to more than on source. This may, however, beneficial in understanding the relationships between risk sources and elements (Estate Management Manual, 2001)”.

LATERIZED CONCRETE - CONSTITUENTS, EFFECT OF HEAT, & ITS RESIDUAL STRENGTH

LATERIZED CONCRETE (LATCON)

Laterized concrete can be defined as concrete in which stable laterite fine replace aggregate (i.e., Sand). Adepegba(1975) was recognized as the first to study the effect of using laterite as fine aggregate in concrete while he was recommended laterite up to 40% in clay for laterized concrete”.

In is further research, Adepegbe (1975) was also compared resistance to high temperature, modulus of elasticity and compressive and tensile strength of laterized concrete mixes (1:2:4; 1:1.5:3 and 1:1:2 by weight) with that of normal concrete.

He accomplished that for high strength and workability only 25% of sand in concrete should be substituted with lateritic fine, while the mix ratio should be 1:1.5:3 (cement: sand/laterite: granite) with a water/cement ratio of 0.65 and it could also be a concrete in which the fine aggregates (sand) are lateritic soils.”

Laterite as a mixture of clayey iron and aluminum oxides and hydroxides formed as a result of the weathering of basalt under humid, can be fully or partially replacement of sand in LATCON. Also from the study effect of varying sand content of laterized concrete by Balogun and Adepegba [1982] stated that the most suitable mix of laterized concrete for structural purpose is 1:1.5:3 using batching by weight with a water/cement ratio of 0.65, provided that the laterite content is kept below 50% of the total aggregate content. Which can be good for structural member? That is, containing laterite as a full or partial replacement for sand.”

CONSTITUENTS OF LATERIZED CONCRETE

Mallet (1883) was perhaps the first to introduce the chemical concept for establishing the ferruginous and aluminium nature of lateritic soils. Fermor (1911) from his study, defined various forms of lateritic soils on the basis of the relative contents of the so-called lateritic constituents (Iron, Aluminium, Titanium and Manganese in relation to silica.

Also Lacroix (1913) divided laterite into:-true laterite, silicate laterite, and lateritic clays depending on the relative contents of the hydroxides. However, there are other several attempts by the researchers to classify laterite in terms of their chemical compositions, but Fox (1936) has verified that such classifications are inadequate, other than in relations to deposits that may be exploited for their minerals content, classification based on chemical composition cannot be used to distinguish between indurate and softer formations.

The combine silica content is low in sesquioxides. This combined silica is predominantly in the form of Kaolinite, the characteristic clay mineral of most tropical formation. It was on this basis that D’hoore (1954) made a theoretical calculation of free Al2O3 content from combined silica content employing the formula:

Free Al2O3 = Total Al2O3 — (SiO2 x 0.849), The use of this procedure leads to the statement that alumina was present mainly in combined form in laterite of Buchanan’s type. Although alumina is the main constituent, the sesquioxides of iron are most common and the most frequent.””

EFFECT OF HEAT ON LATERIZED CONCRETE

Laterised concrete is one in which the fine aggregate has been partially or wholly substituted with laterite soil in its natural form its neglect as a structural engineering material is connected with the unlikelihood of its strength of the structural.

Ikponmwosa and Salau (2010) from their study, the effect of heat on laterized concrete. While the Cube specimens were cast, cured and subjected to elevated temperatures of 250oc, 500oc and 750oC.

The content of laterite in the fine aggregate was varied from 0 – 100% at 25 interval. Specimens cured at 7 and 28 days were subjected to uniaxial compressive loading tests at room and elevated temperatures. The outcome of their tests results showed that normal concrete cannot withstand large load above 250oC while laterized concrete with 25% laterite in the fine aggregate is able to resist higher load with increase in strength at higher temperatures. The peak compressive strength value of 30.44N/mm2 is recorded for the mix with 25% laterite – 75% sand at 500oC.And also when it is exposure to high temperatures causes the modulus of elasticity to decrease in all specimens irrespective of the preload condition and the strength of concrete. Also Oluwaseyi and Mnse (2007).

Described the weathering characteristics of laterized concrete with laterite-granite fines ratio as a factor in ascertaining its suitability as a substitute for the conventional fine aggregate, They found that the compressive strength of laterised concrete with laterite-granite fines decreased when subjected to alternate wetting and drying. It was also observed that laterised concrete with 40-60% laterite-granite fines subjected to a temperature variation range of 75-125oC attained compressive strength of 22.52 N/mm2. However, the critical failure temperature of the laterised concrete is yet to be ascertained.”

RESIDUAL STRENGTH OF LATERIZED CONCRETE

“A structural component exposed to devastating fires accidentally for long periods (exceeding fire resistance duration) resulting in high rise of temperature and decrease strength, while the reduce in strength of the component is called the residual strength (Kumar, 2003).

The data on the residual strength of laterized concrete desires to be obstinate. Also, the form of changes due to high temperatures include chemical and microstructural changes, such as water migration (diffusion, drying), improved dehydration, interfacial thermal incompatibility and chemical decomposition of hardened cement paste and aggregates. These cause the changes in reduction of strength and solidness of concrete and increase irrecoverable deformation (Zhang et al, 2000).

This appearance of the conclusion of other researchers who have study that cooling concrete rapidly by fascination in water after heat pretreatment results in a thermal shock which in turn leads to lower strength values than concrete cooled freely by exposure to air after heat pretreatment (Peng et al., 2008; Yuzer et al., 2004; Chan et al., 2000).

However, from the study of residual compressive strength of laterized concrete subjected to elevated temperature by F.Udoeyo(2010). He was concluded that the compressive strength of LATCON decreased in a similar manner to that of plain concrete when subjected to elevated temperatures between 200 and 600ºC. Deterioration in strength for both types of concrete was severe at 600ºC. And the plain concrete experience a better proportion of its relative residual strength than LATCON. The results indicate that the cooling regime also significantly influenced the residual compressive strength of LATCON.”

LATERIZED CONCRETE - CONSTITUENTS, EFFECT OF HEAT, & ITS RESIDUAL STRENGTH

LATERIZED CONCRETE (LATCON)

Laterized concrete can be defined as concrete in which stable laterite fine replace aggregate (i.e., Sand). Adepegba(1975) was recognized as the first to study the effect of using laterite as fine aggregate in concrete while he was recommended laterite up to 40% in clay for laterized concrete”.

In is further research, Adepegbe (1975) was also compared resistance to high temperature, modulus of elasticity and compressive and tensile strength of laterized concrete mixes (1:2:4; 1:1.5:3 and 1:1:2 by weight) with that of normal concrete.

He accomplished that for high strength and workability only 25% of sand in concrete should be substituted with lateritic fine, while the mix ratio should be 1:1.5:3 (cement: sand/laterite: granite) with a water/cement ratio of 0.65 and it could also be a concrete in which the fine aggregates (sand) are lateritic soils.”

Laterite as a mixture of clayey iron and aluminum oxides and hydroxides formed as a result of the weathering of basalt under humid, can be fully or partially replacement of sand in LATCON. Also from the study effect of varying sand content of laterized concrete by Balogun and Adepegba [1982] stated that the most suitable mix of laterized concrete for structural purpose is 1:1.5:3 using batching by weight with a water/cement ratio of 0.65, provided that the laterite content is kept below 50% of the total aggregate content. Which can be good for structural member? That is, containing laterite as a full or partial replacement for sand.”

CONSTITUENTS OF LATERIZED CONCRETE

Mallet (1883) was perhaps the first to introduce the chemical concept for establishing the ferruginous and aluminium nature of lateritic soils. Fermor (1911) from his study, defined various forms of lateritic soils on the basis of the relative contents of the so-called lateritic constituents (Iron, Aluminium, Titanium and Manganese in relation to silica.

Also Lacroix (1913) divided laterite into:-true laterite, silicate laterite, and lateritic clays depending on the relative contents of the hydroxides. However, there are other several attempts by the researchers to classify laterite in terms of their chemical compositions, but Fox (1936) has verified that such classifications are inadequate, other than in relations to deposits that may be exploited for their minerals content, classification based on chemical composition cannot be used to distinguish between indurate and softer formations.

The combine silica content is low in sesquioxides. This combined silica is predominantly in the form of Kaolinite, the characteristic clay mineral of most tropical formation. It was on this basis that D’hoore (1954) made a theoretical calculation of free Al2O3 content from combined silica content employing the formula:

Free Al2O3 = Total Al2O3 — (SiO2 x 0.849), The use of this procedure leads to the statement that alumina was present mainly in combined form in laterite of Buchanan’s type. Although alumina is the main constituent, the sesquioxides of iron are most common and the most frequent.””

EFFECT OF HEAT ON LATERIZED CONCRETE

Laterised concrete is one in which the fine aggregate has been partially or wholly substituted with laterite soil in its natural form its neglect as a structural engineering material is connected with the unlikelihood of its strength of the structural.

Ikponmwosa and Salau (2010) from their study, the effect of heat on laterized concrete. While the Cube specimens were cast, cured and subjected to elevated temperatures of 250oc, 500oc and 750oC.

The content of laterite in the fine aggregate was varied from 0 – 100% at 25 interval. Specimens cured at 7 and 28 days were subjected to uniaxial compressive loading tests at room and elevated temperatures. The outcome of their tests results showed that normal concrete cannot withstand large load above 250oC while laterized concrete with 25% laterite in the fine aggregate is able to resist higher load with increase in strength at higher temperatures. The peak compressive strength value of 30.44N/mm2 is recorded for the mix with 25% laterite – 75% sand at 500oC.And also when it is exposure to high temperatures causes the modulus of elasticity to decrease in all specimens irrespective of the preload condition and the strength of concrete. Also Oluwaseyi and Mnse (2007).

Described the weathering characteristics of laterized concrete with laterite-granite fines ratio as a factor in ascertaining its suitability as a substitute for the conventional fine aggregate, They found that the compressive strength of laterised concrete with laterite-granite fines decreased when subjected to alternate wetting and drying. It was also observed that laterised concrete with 40-60% laterite-granite fines subjected to a temperature variation range of 75-125oC attained compressive strength of 22.52 N/mm2. However, the critical failure temperature of the laterised concrete is yet to be ascertained.”

RESIDUAL STRENGTH OF LATERIZED CONCRETE

“A structural component exposed to devastating fires accidentally for long periods (exceeding fire resistance duration) resulting in high rise of temperature and decrease strength, while the reduce in strength of the component is called the residual strength (Kumar, 2003).

The data on the residual strength of laterized concrete desires to be obstinate. Also, the form of changes due to high temperatures include chemical and microstructural changes, such as water migration (diffusion, drying), improved dehydration, interfacial thermal incompatibility and chemical decomposition of hardened cement paste and aggregates. These cause the changes in reduction of strength and solidness of concrete and increase irrecoverable deformation (Zhang et al, 2000).

This appearance of the conclusion of other researchers who have study that cooling concrete rapidly by fascination in water after heat pretreatment results in a thermal shock which in turn leads to lower strength values than concrete cooled freely by exposure to air after heat pretreatment (Peng et al., 2008; Yuzer et al., 2004; Chan et al., 2000).

However, from the study of residual compressive strength of laterized concrete subjected to elevated temperature by F.Udoeyo(2010). He was concluded that the compressive strength of LATCON decreased in a similar manner to that of plain concrete when subjected to elevated temperatures between 200 and 600ºC. Deterioration in strength for both types of concrete was severe at 600ºC. And the plain concrete experience a better proportion of its relative residual strength than LATCON. The results indicate that the cooling regime also significantly influenced the residual compressive strength of LATCON.”

LATERITE - Compositions - properties and classification

LATERITE

“Laterite can be described as a porous soil which ranging from soft earthly material to hard rock, and changes in colour from white to dark red, also depending on the quantity of iron in the soil. It is found below the earth surface and chemically made of silica and alumina, which is formed by the weathering of rocks hence given rise to many variation of laterite in composition and properties. Lateritic soil as a material has been used especially in the rural areas in Nigeria for many years to build houses. In order to modify the properties, the soil named “Laterite” was given by Buchanan (1807) in India from a Latin word “Later” meaning brick.  He described the material as “subtle in great masses, without any sign of stratification, and is placed over the granite that forms the basis of Malayala (India).”Also Lacroix (1913) from his study, divided laterite into true laterite, silicate laterite, and lateritic clays on the basis of the hydroxides content; it was further developed by (Martin and Doyne, 1930) with the function of a silica-alumina ratio.”

Compositions, properties and classification laterite soils

Laterite can be possibly have high quantities of iron and silica apart from low aluminums contents, neither of these minerals are of high quantities enough for marketable extractions or use by industrialized.

 

Table 1, physical component of laterite.

COMPONENT% COMPOSITION
Gravel5
Sand48
Silt12
Clay35

Source: Adepegba 1975

Chemical composition of Typical laterites Soils

LocationNigeriaAustraliaSudan
SiO226.53.534.92
Al2O319.916.430.73
Fe2O336.760.612.52
FeO–––
MgO––1.25
CaO––0.76
Na2O––0.90
K2O––0.60
TiO21.11.31.02
H2O–101

SOURCE: Campbell (1977), Mohr and Van Baren (1954), Simpson (1991) cited by Yusuf, 2012.

Further research was done to classify and differentiate the difference between laterite found in Northern Nigeria and Western Malaysia, by pointing out that laterite in Western Malaysia, is of modular laterite which is most common where as in Northern Nigeria, laterite are known to overlie sandstone, granite gneiss, Mata sediments, limestone and alluvium occurs most frequently in the form of laterite crusts.”

SOLDIER ANT MOUND CLAY (SAMC)

SOLDIER ANT MOUND CLAY (SAMC)

The source of soldier ant mound clay is from termite mound, and the mound is the accumulation of earth made by termite resembling a small hill. The plasticity of the mound is improved by the secretion from the termite which is being used in constructing the mound, (Mijinyewa et al., 2007).

However, it is a better material when compare to ordinary clay in terms of operation for moulding lateritic bricks (Odumodu 1999, Mijinyewa et al., 2007) and soldier ant mound clay has shown to perform better than ordinary clay in terms of dam construction,(Yohanna et al., 2003).

The clay obtain from the termite mound has the ability of maintaining its permanent shape even after moulding due to its plasticity.

It has less liable to crack by comparing it with ordinary clay. Therefore, the clay has low thermal conductivity and also decreases solar heat flow and temperature fluctuation in a closet space, (Mijinyewa et al., 2007).

It was reported that soldier ant mound clay material when combine with lime is used as partly substitution of cement in plastering and it was observed which compressive strength of the mortar cubes gains with age and reduces with gain % replacement of cement combine with lime together with (SAMC), (Olusola et aI., 2006).

Soldier ant mound clay (SAMC) is considered as one of the most visible figure of various tropical ecosystems, particularly in African savanna landscapes. The large soil builders are considered and giving out considerable amount of material in their building performance and strongly influence the clay properties, when compared to the ordinary clay, (review in Lee & Wood, 1971 and Lobry de Bruyn & Cornacher, 1990).

Soldier ant mound clay (SAMC) has high clay content when compare to the surrounding surface soil, F.O Adekajode and M.O Ogun Koya, (2009).

Properties of soldier ant mound clay

Physical and chemical properties of soldier ant mound clay.

An investigation was carried out on the soil on the soil obtained from soldier ant mound clay (SAMC) to determine the physical and also the chemical contents of the liquid constituents of the freshly built (SAMC) that was dry. In the soldier ant mound clay, the physical properties determined are the particles size distribution, liquid limit, plastic limit plastic index, and moisture content; Mijinyewa, (2007).

It was evaluated that the chemical composition of soil obtained from (SAMC) establish if the clay soil has been modified chemically by the termite to cement the particles and increase the resistance of the mound to erosion by rainfall, (Yohanna et al., 2003).

A research shows that in literature, the strength properties of soldier ant mound clay have high level of calcium, phosphorus and organic matter that attributed to better crop development, especially on the poor soils in the area. Plants also take up nutrients very easily from soldier ant mound clay and that is proven a viable option to local farmers, (Rupela et al., 2006).

According to Tathiane Santi Sarcinelli et al., (2009), chemical analysis showed that PH and the contents of organic carbon and nitrogen, phosphorus, calcium and magnesium were significantly higher in soldier ant mounds clay compare to ordinary clay soil. The microbial biomass of (SAMC) material was about six times that of the surface soil, J.A.Hott, (1998).

SOURCES OF HEAT ENERGY

SOURCES OF HEAT ENERGY

The third factor necessary for the initiation of the reaction between a fuel and anoxidant is a source of heat energy. Only in some exceptionally rare circumstances will the sole contact between the fuel and oxygen lead to a spontaneous combustion. In the great majority of cases, an outside source of heat energy is necessary for the initiation of the combustion. The source of heat energy often behaves as a catalyst, especially in the piloted ignition. Its presence is necessary for the promotion of the combustion reaction, but only up to the point where the reaction becomes self-sustaining.

There are several distinct means of generating heat energy in the quantities and duration required for the initiation of fire. They may conveniently be divided into three broad categories, namely electrical, chemical and mechanical sources of heat energy (Hartzell G.E, 2008). Each of these is further described below.

1. Electrical Heat Energy

Electricity is repeatedly quoted as a major cause of many fires. Fire statistics regularly show electricity to be responsible for between 20% and 40% of all fires of known origin (Purser D, 2009). Although formally it is true that electrical heat energy does cause a significant number of fires, it is also undisputable that fires will seldom be initiated by the electricity if the electrical installations and equipment’s are made, used and maintained in accordance with the corresponding codes and standards.

Electrical heat energy is always generated when an electric conductor carries a current (Kealy et al, 2003). From classical physics, it is known that the greater the current and resistance, and the longer the current flows through the conductor, the greater the heat energy liberated. For safe use of electrical conductors, electrical codes specify the maximum current which will not overheat them.

The resistance of conductors is determined by the kind of material employed. Materials which are good conductors, such as copper, silver and aluminium are preferred and generally used. Finally, the time the current takes to pass through the conductor is determined by the intended use of electrical appliances, unless the appliance is left on unintentionally, causing an accidental fire.

2. Chemical Heat Energy

Heat energy necessary for the initiation of fires may be produced by several types of chemical reactions. Among them of primary concern to fire protection are combustion reactions. These reactions when brought to a completion release aconsiderable amount of heat known as the heat of combustion (Kobes, 2009). Examples of common sources of heat energy formed by combustion reactions are open flames, a lighted cigarette and acetylene torch used for cutting and welding, a hot fuel- fired boiler, a drier or a furnace surface. Other types of chemical reactions which release heat are spontaneous heating (self-heating) and spontaneous ignition (self- ignition)

3. Mechanical Heat Energy

It is well known that some forms of mechanical energy can be converted to heat energy (Margrethe et al, 2009). The greater the mechanical work, the greater the amount of heat released. The mechanical heat energy, formed as result of mechanical failure or malfunction of equipment, is the source of ignition for a significant number of fires (5 – 10%) (Krasny, 2001). Furthermore, when two moving solids are in contact, the resistance to relative motion is manifested in the form of heat due to friction. If heat due to friction is not dissipated as rapidly as it is formed, there will be overheating which may ignite the combustible material.

SOURCES OF FIRE HAZARDS

SOURCES OF FIRE HAZARDS

Sources of fire hazards can be classified based on the triangle of fire, namely from materials, oxidants and heat energy (Tharmarajan 2007). Each of these elements is described below;

1.  Hazards of materials

Hazards of materials can be further classified into wood and wood-based products, plastics, textiles, liquids and gases. These are further described below.

2.Woods and wood based products

Wood and numerous wood-based products such as paper, cellulose-based fibrous materials and many others, are indeed ubiquitous. They are invariably involved in almost all kinds of fires. Therefore, understanding of their fire characteristics is important for fire protection.

The chemical content of dry wood and wood-based products is relatively simple. Carbon (50%), oxygen (40%) and hydrogen (6%) are the most abundant elements with nitrogen and mineral ash making up the remainder. However, these few elements are combined to form a large number of substances, of which cellulose (50%), lignin (26%) and extractable (1%) are the major components. Wood also contains water, either as moisture or absorbed water in wood cells. Whereas moisture is readily removed on heating wood and wood products above 380 K, absorbed water remains even after prolonged heating. Apparently, dry wood may still contain considerable amounts of water (5 – 6%) (Stroup David W, 2007).

Wood and wood based products are combustible. They can burn in different modes such as smouldering, charring, ignition followed by flames or burning with a lot of smoke (Leonard Y, 2007). Smoke produced from burning wood has a characteristic recognizable odour. In comparison with other solids, the toxicity of smoke produced from wood burning is not pronounced. Except for carbon monoxide, other toxic gases are either absent or only present in traces.

3. Plastics

Plastics are used practically everywhere, namely in building construction, homes, offices, shops, schools, hospitals etc. A lot of equipment’s and applications, furniture, wall coverings, curtains, textiles and many other products either are made completely of plastic or contain some plastic parts.

All plastics, regardless of chemical characteristics, being organic compounds are combustible. Various flame retardants can considerably reduce flammability but cannot completely stop combustion. Ignition temperatures of plastics are somewhat higher in comparison with wood and wood – based products. However, the rates of flame spread are generally much higher than wood.

The burning of plastic s rapidly produces smoke which is usually dense, contains a lot of soot and has a dark colour. It has been found in many cases that the inhibition of flammability of plastics by flame retardants increases smoke production (Stollard p, 1994). Thermoplastics soften on heating before reaching ignition temperature and harden on cooling. At higher temperatures, thermoplastics melt and flow. This characteristic of plastics is potentially hazardous since the flaming liquid may drip and thus spread the fire.

Another hazard is that during the burning process, some plastics release corrosive and toxic gases such as HCL, HF, HBr, HCN and NH3(Johnson L.E, 1994). The conditions which enhance the emission of such gases during a fire are low ventilation and lengthy fire growth which releases fire temperatures to the point of an easy break of the polymer matrix and the release of simple gaseous constituents.

4. Textiles

The widespread use of textiles in daily life, coupled with the fact that nearly alltextiles are combustible, explain the leading role of textile fires in fire deaths. More than 50% of fatal incidents involve a fabric. As to the type of fabric first ignited, artificial fibres, cotton and rayon comprise the largest percentage (41%), whereas wool and wool mixtures are very rarely first ignited (1%). This marked difference is due to the differing ignition temperatures. While cotton and most artificial fibres ignite at relatively low temperatures (520 – 670 K), the ignition temperature for natural protein-based fabrics such as wool, silk and cashmere is between 840 and 880K (FN Spon, 1994).

The fire characteristics of textiles depend on the nature and proportion of individual fibres, on their weight and the method of blending. Textiles based on cellulosic fibres such as cotton and jute behaves differently in fires compared to protein fibres. The latter ones do not burn readily; shrink at temperatures approaching their decomposition temperature and burn more slowly. Common artificial fibres such as nylon and rayon burn similarly to protein-based natural fibres. Thus, they are relatively safer compared to fabrics containing cellulose. However, when exposed to heat, artificial fibres often melt and stick to the skin. Therefore, they should not be employed for protective clothing.

Synthetic fabrics can be hazardous in some special atmospheres, such asoxygen-enriched atmospheres or atmospheres containing flammable gases and vapours because of the accumulation of static electricity (Drysdale D, 2007). The discharge of this electricity to the ground or other objects may produce a spark of sufficient energy to ignite a flammable gas. In such situations, electrically conductive fabrics should be employed.

5.  Liquids

Flammable and combustible liquids are among the most fire hazardous materials. Fire statistics record that fires involving a liquid are the most frequent ones. Flammable and combustible liquids are the most hazardous in all instances when the liquid is exposed to air, such as in spillages (Drucker, 2004). The fire and explosioncharacteristics of a liquid can be described using a number of parameters. Some of them are applicable to solid and gaseous materials as well. Thus, most of the hazardsare similar to the ones already described earlier.

6. Gases

For fire protection purposes a gas may be defined as any substance which exists in a gaseous state at normal temperature and pressure. Since at these conditions many substances may exist as either liquids or gases, depending on the partial pressures of their vapours, it is generally accepted that all those liquids which exert a relatively high vapour pressure may be regarded as gases (Frantzich, 1997).

In most situations, gases are used in large volumes. Since gases are much lighter than liquids and solids, the only practical means of having a reasonable quantity of gas on hand is either by gas compression in containers or by filling the containers with liquefied gas. Both these forms of gas-packing present hazards. Fire hazards of gases are very similar to those of liquids. This is not surprising since in fire hazards of liquids it is the vapour of a particular liquid which is hazardous, rather than the liquid phase itself. Thus, most of the hazards are also similar to the ones already described previously.

Thus, most of the hazards are also similar to the ones already described other properties. The hazard stems from properties such as toxicity, reactivity and chemical inertness (Hakan, 2007). However, the basic hazard of all gases and vapours, regardless of their chemical composition, is related to the change of gas pressure with changing temperature. From classical gas laws, the doubling of temperature leads to a doubling of gas pressure. Hence, gas containers would normally be ruptured in the event of fire.

NATURE OF FIRE

NATURE OF FIRE

One generally accepted the definition of fire as a process involving rapid oxidation at elevated temperatures accompanied by the evolution of heated gaseous products of combustion, and the emission of visible and invisible radiation (Abdullah, 2001). The combustion process is a chemical reaction between the oxidation of a fuel in the presence of oxygen with the emission of heat and light. The concept of fire can be symbolized by the Triangle of Fire, which is represented by fuel, heat, and oxygen (Tharmarajan 2007). If the fire is in a fire grate or furnace, this process can be referred to as a controlled fire, and if it is a building on fire, this process is referred to as an uncontrolled fire. The removal of any one of these factors usually will result in the fire being extinguished.

1.    Pyrolysis

Fire is a combustion and oxidation process when fuel material undergoes pyrolysis (Tharmarajan 2007). It is in effect a chemical process when oxygen reacts with the material’s fuel components to liberate stored energy into thermal energy with high temperatures. Fuels that predominantly consist of carbon and hydrogen elements, however, may contain small amounts of sulphur, lead, zinc, etc., and non-combustibles like mineral matter (ash), water and inert gases.

With the exception of hydrogen itself, all common fuels are organic compounds, whose energy is ultimately sourced from the sun through the process of photosynthesis in green plants. The atmosphere contains 21% of oxygen, 78% nitrogen and 1% of other elements. All of these would enter the combustion process where in the case of oxygen; only the amount required for the combustion process is utilized while the excess of it exits in its original oxygen (O2) state. Nitrogen, that requires very high temperatures for oxidation, is inert as far as the combustion process is concerned. Nevertheless, it acts as a moderator or cooling agent in that it absorbs some of the heat of combustion thus assisting in limiting the maximum temperature reached (Abdullah, 2001).

A stoichiometric mixture of air and fuel is one that contains sufficient air (oxygen) for complete fuel combustion. A weak mixture is one that has excess of air (oxygen) and hence favourable for combustion. A rich mixture (excess of fuel) is that of one having deficiency of air (oxygen) and thus considered unfavourable for complete combustion.

2.    Combustion

Complete combustion occurs when the conditions are favourable. The products of complete combustion are carbon dioxide in gaseous form, water in vapour form and heat energy (Tharmarajan 2007). However, small quantities of carbon monoxide and partial flume gas components may form. The amount of energy released in the burning of a substance is called its heat of combustion or combustion enthalpy.

Incomplete combustion occurs when the fuel element is not completely oxidized in the combustion process. Fire would occur in a less vigorous and smouldering state emitting thick smoke containing toxic gases and contaminants. Factors that give rise to incomplete combustion on a burning fuel material are as follows (Abdullah, 2001):

  1. Insufficient air to the fuel material (causing local fuel-rich and fuel-lean zones);
  2. Insufficient air supply to the flame (providing less than the required quantity of oxygen
  • Insufficient reactant residence time in the flame (preventing completion of combustion reactions;
  1. Flame impingement on a cold surface (quenching combustion reactions); and
  2. Too low flame temperature (slowing combustion reactions).

When there is incomplete combustion to a burning fuel material, the formation and subsequent release of partially oxidized compounds such as carbon monoxide, aldehydes and ketones occurs (Abdullah, 2001). Should such adverse toxic smoke situation predominate in building fires, this would be the main contributing factor to the ill-favoured consequence of high occupant-fatality rate not to mention the lifelong agony and suffering of the survivors.

3.    Ignition

There should be sufficient heat to set a fuel material into combustion and this is called ignition. Ignition occurs in any one or combination of the following forms (Abdullah, 2001):

  1. Induced Form (as in internal combustion engines or lighting a fire);
  2. Spontaneous Form (when the fuel material ignites itself through electric sparks, friction, grinding or rubbing effect, magnified sunlight, etc.);
  3.  Contact Form (through flame contact); and
  4. Pilot Form (transmission of heat radiation through a stream of hot gases, volatile and flying brands)

FIRE SAFETY CULTURE

THE FIRE SAFETY CULTURE

Fire Safety Culture is the amount of attention and concern the fire issue garners with the public, the industry, and the government officials responsible for regulating them, and the beliefs, attitudes, roles, and social and technical practices that are concerned with minimizing the exposure to dangerous conditions. Not only are Fire Safety Culture, and its more generic concept, Safety Culture, an illustration of the public’s attentions in regards to safety, but also guides the attentions of the public. Research has shown that there are three levels at which culture can be observed: Basic Assumptions, Espoused values and Artifacts.

Basic assumptions of an object or procedure affect our attitude towards it, which then affects what precautions we take. In a country with a developed Fire Safety Culture, such as the United States, assumptions regarding the safety of an object or procedure can be made because of our basic understanding of risk. This understanding comes from issued warnings. Not only do dangerous products such as vehicles come with many warnings, but products as simple as coils of string come with warning labels describing possible risks associated with them.

With a larger understanding of objects or procedures and their risks, people can begin to make assumptions on the risks and dangers of other objects and procedures. These assumptions then guide the behavior of the public, their perceptions regarding risks, and how they feel about taking them. This culture then becomes taken for granted, and actions based on other assumptions are difficult to understand (Guldenmund, 2000).

These basic assumptions are not necessarily in regard to safety, yet still affect the safety culture. This is to say that society’s assumptions control our attitudes towards an object or behavior, which clearly affects intentions and behavior’s taken.

Attitudes are an example of society’s espoused values, along with policies, training manuals, procedures, formal statements, bulletins, and accident and incident reports. These values determine whether or not an organization, such as a business, or community have emergency training manuals, or planned emergency procedures; whether or not an investigative or regulatory body produces an accident or incident report after an emergency situation and the effect of this report in determining changes in emergency procedures in order to improve their effectiveness.

Finally these espoused values or attitudes control the final level of safety culture the artefacts are physical reactions to our attitudes. Artefacts in this context are personal protective equipment, informative posters, dress codes, etc. If a group’s attitude towards an object and procedure is that it has specific and dangerous risks, they may prescribe protective equipment, or attempt to educate other of the risks.

REFERENCES

Bryan, J. L., (1986), “Human Behaviour and Fire”, Fire Protection Handbook, 16th Ed. Quincy, MA :   NFPA

Craighead, G. (1995), “High-Rise Security and Fire Life Safety”, Boston :Butterworth-Heinemann.

Canter. D, (1990), “Fire and Human Behaviour,” UK, David Fulton Publishers, 2nd Edition.

Charters, David, (2009), “Fire Evacuation Studies in HealthCare Paper given at the National Association of Hospital Fire Office” (NAHFO) Annual Conference, Leeds.

Cooper L.Y. (1995),”Compartment Fire Generated Environment and Smoke Filling,” The SFPE Handbook of Fire Protection Engineering, 2nd Edition.

Cooper. Leonard Y., Stroup. David W., ASET- A computer Program for Calculating available safe egresstime Fire Safety Journal, Volume 9, Issue 1, May 1985.

Dodge, F. W., (1991),”Fundamentals of Fire Safety in High-Rise Buildings”, Skokie, IL : Concrete and Masonry Industry Fire Safety Committee.

Drysdale D, Stollard P, Johnsson L.E & FN Spon (1994), “Design against Fire : an Introduction to Fire Safety Engineering Design Ed.

FIRE RISK ASSESSMENTS (FRA)

FIRE RISK ASSESSMENTS (FRA)

FIRE RISK ASSESSMENTS – Under the requirements of the Regulatory Reform (Fire Safety) Order 2005 in England and Wales, a suitable and sufficient fire risk assessment is required for all premises, other than private dwellings. It is of paramount importance that a well-structured and properly impltured and properly implemented fire safety management plan accompanies the assessment.

The essential components of a fire risk assessment and fire safety plan for a public building can be broken down into the four steps: preparation, prevention, protection and management. There is no standardized format for recording or presenting the findings of a risk assessment or safety plan, but in every case the aim should be to produce clear and comprehensive documentation that is regularly reviewed.

The suite of fire safety guides from the Department of Communities and Local Government contains useful guidance on some of the methodologies used for presenting fire risk assessments.

The following are fire risk assessments:
1. Preparation

Before undertaking a FRA, it is necessary to obtain accurate plans of the building, as this will not only save time and effort in the long run, but can also be useful when preparing business continuity plans, inventories of artefacts, cleaning regimes and security assessments. The plan of the building will form the framework for the FRA and fire safety plan and should contain information on the existing fire safety measures (if there are any), compartment lines, exit routes, room usage, location of artefacts, hidden voids (disused chimneys, goods lifts, panel infill’s etc.), potential ignition sources and flammable materials.

The task of risk assessing and planning is made considerably easier if careful consideration is given to the building plans at the outset. Ultimately it will be the building plans, with relevant and up-to-date information on hazards, firefighting equipment and salvage strategies that will form the basis of how the fire and rescue service will respond in the event of a fire.

2. Prevention

Clearly, preventing a fire in the first place is the ideal situation, and is the first stage of physically assessing the fire risk within the building. By identifying potential ignition sources and flammable materials, and either removing them or introducing alternative methods or systems, the risk will be greatly reduced. Putting in place remedial measures can be relatively inexpensive and involve minimum intervention in the fabric of the building.

Among the relevant questions to ask when looking at preventing fire within a public building include:

i. When the electrical circuits were last tested and have all appliances, both fixed and portable, been tested for safety?

ii. Are all drapes/curtains/tapestries a suitable distance from potential ignition sources such as halogen lamps?

iii. If smoking is allowed outside the building, have adequate precautions been taken – for example, dedicated smoking shelters located away from the building?

iv. Are waste and/or flammable materials appropriately stored?

v.Is there a significant threat from arson and can it be deterred?

3. Protection

Once the risk of fire has been mitigated as far as practicable, protective measures should be introduced, in order to safeguard occupants, the property and important artefacts.

Therefore, by dealing with each of the requirements in turn, and introducing practical solutions suited to the building and its contents, a holistic fire safety strategy can be developed that will not only satisfy the functional requirements of the Building Regulations, but also ensure a safer environment for occupants, reduce the risk of fire, and minimize the impact of fire, should one occur.

When it comes to public buildings, protective measures are often controversial because they can be disruptive to the original fabric of the building, and the physical installation of the systems can sometimes be difficult. It is possible, however, to take suitable protective measures that are sympathetic to the historic fabric, but which can also be designed for individual premises. It is highly recommended that a third-party approved company with a proven track record of installations in public buildings is appointed.

4. Management

Poor management can render the most comprehensive risk assessment and protective measures ineffectual. Therefore, once the risk assessment has been completed and suitable protective measures are in place, a robust management system, in the form of a fire safety management plan, must be drawn up. The following should be noted in the management process;

i. Measures identified during the prevention step are regularly reviewed/revisited to prevent fires from developing

ii. Maintenance schedules to ensure the protective measures put in place are still capable of performing as intended

iii. Comprehensive and regular training of staff in evacuation procedures, raising the alarm, first-aid firefighting and salvage plans

iv. Emergency drills must be performed and any shortcomings recorded and rectified as soon as possible
v. Periodic review of the risk assessment and fire safety management plan, especially after a change in use of the building or a ‘near-miss’ incident.

All staff involved with salvage operations must be fully trained and made aware of the risks and dangers involved with such tasks. Regular salvage drills should be undertaken, with any problems recorded and remedied as soon as possible. A business continuity plan should be integrated within the fire safety management plan so that, in the event of fire, restoration work can proceed as quickly as possible. Being prepared for an emergency will significantly improve recovery rate.

5. Co-operation and Conservation

Safeguarding our public buildings from the ravages of fire should be considered as conservation of our record for future generations. Providing that there is co-operation between all persons with a vested interest (e.g. building owners, the fire and rescue service, fire safety consultants, architects, staff and visitors), public buildings and the treasures within will be preserved and enjoyed for many years to come.

References

Bryan, J. L., (1986), “Human Behaviour and Fire”, Fire Protection Handbook, 16th Ed. Quincy, MA :  NFPA

Craighead, G. (1995), “High-Rise Security and Fire Life Safety”, Boston :Butterworth-Heinemann.

Canter. D, (1990), “Fire and Human Behaviour,” UK, David Fulton Publishers, 2nd Edition.

Charters, David, (2009), “Fire Evacuation Studies in HealthCare Paper given at the National Association of Hospital Fire Office” (NAHFO) Annual Conference, Leeds.

Cooper L.Y. (1995),”Compartment Fire Generated Environment and Smoke Filling,” The SFPE Handbook of Fire Protection Engineering, 2nd Edition.

Cooper. Leonard Y., Stroup. David W., ASET- A computer Program for Calculating available safe egresstime Fire Safety Journal, Volume 9, Issue 1, May 1985.

Dodge, F. W., (1991),”Fundamentals of Fire Safety in High-Rise Buildings”, Skokie, IL : Concrete and Masonry Industry Fire Safety Committee.

VENTILATION CONTROLLED FIRES

VENTILATION CONTROLLED FIRES

Under ventilation controlled conditions excess pyrolizate and flammable products of combustion present in smoke are a significant hazard to firefighters. Let’s go back to the fire triangle (see Figure 4) to examine the nature of this threat. While fuel, heat, and oxygen are present in proportion to support combustion where the fire is burning, the heat of the fire is pyrolyzing more fuel vapour than the fire can consume. In addition, incomplete combustion results in production of flammable gases such as carbon monoxide. The speed of fire development is limited by the availability of atmospheric oxygen provided by the current ventilations profile of the compartment or building.

When the fire is burning in a ventilation controlled state, any increase in the supply of oxygen to the fire will result in an increase in heat release rate. Increase in ventilation may result from firefighters making entry into the building (the access point is a ventilation opening), tactical ventilation (performed by firefighters), or unplanned ventilation (e.g., failure of window glazing due to elevated temperature).

It is essential to recognize when the fire is, or may be ventilations controlled and the influence of planned and unplanned changes in ventilation profile. Most compartment fires that progress into the growth stage are ventilation controlled when the fire department arrives. A bi-directional air track (smoke out the top and air in the bottom) is often a significant indicator of a ventilation controlled fire. As illustrated in Figure 5, as the neutral plane drops, smoke exiting through the opening reduces the size of the inlet opening, further restricting the air available for combustion and extent to which the fire is ventilations controlled.

The series of photos in Figure 5 also illustrates the influence of decreased oxygen supply on the colour and optical density of smoke. As combustion becomes more incomplete, smoke production increases, colour darkens, and optical density increases. When working inside a burning building, flames moving through the hot gas layer are also a strong indicator of a ventilation controlled fire (john moore, 2012).

VENTILATION INDUCED EXTREME FIRE BEHAVIOR

When the fire is ventilation controlled, increased air supply to the fire will result in increased heat release rate and depending on conditions may result in extreme fire behaviour such as flashover or backdraft. While similar, vent induced flashover and backdraft are different phenomena.

REFERENCE

P.J. Denno& W.D. Walton [Eds.], SFPE Handbook of Fire Protection Engineering, 3rd Edition

Frantzich, Hakan, Rapport. (1997), “Fire Safety Risk Analysis of a Health Care Facility” Department of Fire Safety Engineering, Lund Institute of Technology, Lund University, Lund

Dodge, F. W., (1991),”Fundamentals of Fire Safety in High-Rise Buildings”, Skokie, IL : Concrete and Masonry Industry Fire Safety Committee.

Ayuba P, Olagunju, R.E. and Akande O.K (2012).Failure and Collapse of Buildings in      Nigeria: The Role of Professionals and other Participants in the Building Industry.

Interdisciplinary Journal of Contemporary Research in Business.Vol 4, No. 6.

Fire Behaviour Indicators

Fire Behaviour Indicators

Fire Behaviour Indicators – Firefighters can easily observe some of the B-SAHF indicators. However, fire behaviour indicators encompass a wide range of factors that firefighters may see, hear, or feel. Some factors are relatively unchanging (i.e. building construction) and others are quite dynamic, changing as the fire develops (i.e. smoke conditions and flames).

Building: Unlike the other fire behaviour factors, the building and its contents are present prior to ignition and can be examined during the preplanning process. While many common types of buildings and occupancies (such as single family dwellings) are not the focus of a formal preplan program, firefighters can examine common features and their influence on fire behaviour. This pre-fire assessment of likely fire development and spread should be compared with actual fire behaviour encountered during emergency incidents to improve skill in reading building factors.

Smoke and Air Track: Smoke conditions and the pattern of smoke and air movement are two of the most important indicators of fire behaviour. The location and appearance of smoke can provide valuable cues related to the location of the fire, its burning regime (fuel or ventilation controlled) and the stage of fire in various areas of the building. It is critical that firefighters begin their assessment of smoke and air track indicators from outside the building, but continued this process on an ongoing basis from both the interior and exterior of the structure.

Heat: While heat cannot be observed directly, observation of the effect of heat on air track (i.e., velocity of smoke discharge), the building or exposures, and sensation of changes in temperature can be significant fire behaviour indicators. It is important to remember that our personal protective equipment provides significant insulation and slows the transfer of heat and resulting sensation of changes in temperature.

Flame: Flaming combustion is often the most obvious or visible indicator observed by firefighters. However, do not get so focused on visible flames that you miss more important, but subtle building, smoke, air track, and heat indicators. Flame indicators such as location, volume, colour, etc. are important, but need to be integrated into the B-SAHF framework to provide a more complete picture www.firehouse.com (2014).

Figure 3 integrates the concept maps presented in previous articles and outlines some of the major interrelationships between the B-SHAF fire behaviour indicators.

STAGES OF FIRE DEVELOPMENT

STAGES OF FIRE DEVELOPMENT

Fire Development – Building Factors, Smoke, Air Track, Heat, and Flame (B-SAHF) are critical fire behavior indicators. Understanding the indicators is important, but more important is the ability to integrate these factors in the process of reading the fire as part of size-up and dynamic risk assessment www.firehouse.com (2014).

The following are the various fire development stages:
  1. Incipient Stage

Going back to the basics of fire behaviour, ignition requires heat, fuel, and oxygen. Once combustion begins, development of an incipient fire is largely dependent on the characteristics and configuration of the fuel involved (fuel controlled fire). Air in the compartment provides adequate oxygen to continue fire development. During this initial phase of fire development, radiant heat warms adjacent fuel and continues the process of pyrolysis.

A plume of hot gases and flame rises from the fire and mixes with the cooler air within the room. This transfer of energy begins to increase the overall temperature in the room. As this plume reaches the ceiling, hot gases begin to spread horizontally across the ceiling. Transition beyond the incipient stage is difficult to define in precise terms. However, as flames near the ceiling, the layer of hot gases becomes more clearly defined and increases in volume, the fire has moved beyond its incipient phase and (given adequate oxygen) will continue to grow more quickly.

Depending on the size of the compartment and ventilation profile, there may only be a limited indication (or no indication at all) from the exterior of the building that an incipient stage fire is burning within.

2. Growth Stage

If there is adequate oxygen within the compartment additional fuel will become involved and the heat release rate from the fire will increase. While considerably more complex, gas temperatures within the compartment may be described as existing in two layers: A hot layer extending down from the ceiling and a cooler layer down towards the floor. Convection resulting from plume and ceiling jet along with radiant heat from the fire and hot particulates in the smoke increases the temperature of the compartment linings and other items in the compartment.

As gases within the compartment are heated they expand and when confined by the compartment increase in pressure. Higher pressure in this layer causes it to push down within the compartment and out through openings. The pressure of the cool gas layer is lower, resulting in inward movement of air from outside the compartment. At the point where these two layers meet, as the hot gases exit through an opening, the pressure is neutral. The interface of the hot and cool gas layers at an opening is commonly referred to as the neutral plane.

The fire can continue to grow through flame spread or by ignition of other fuel within the compartment. As flames in the plume reach the ceiling they will bend and begin to extend horizontally. Pyrolysis products and flammable byproducts of incomplete combustion in the hot gas layer will ignite and continue this horizontal extension across the ceiling. As the fire moves further into the growth stage, the dominant heat transfer mechanism within the fire compartment shifts from convection to radiation. Radiant heat transfer increases heat flux (transfer of thermal energy) at floor level.

3. Flashover-Transition to a Fully Developed Fire

Flashover is the sudden transition from a growth stage to fully developed fire. When flashover occurs, there is a rapid transition to a state of total surface involvement of all combustible material within the compartment. Conditions for flashover are defined in a variety of different ways. In general, ceiling temperature in the compartment must reach 500o-600o C (932o-1112o F) or the heat flux (a measure of heat transfer) to the floor of the compartment must reach 15-20 kW/m2 (79.25 Btu/min/ft2)-105.67 Btu/min/ft2). When flashover occurs, burning gases will push out openings in the compartment (such as a door leading to another room) at a substantial velocity.

Recognizing flashover and understanding the mechanisms that cause this extreme fire behaviour phenomenon is important. However, the ability to recognize key indicators and predict the probability of flashover is even more important.

It is important to remember that flashover does not always occur. There must be sufficient fuel and oxygen for the fire to reach flashover. If the initial object that is ignited does not contain sufficient energy (heat of combustion) and does not release it quickly enough (heat release rate), flashover will not occur (e.g., small trash can burn in the middle of a large room).

Likewise, if the fire sufficiently depletes the available oxygen, heat release rate will drop and the fire in the compartment will not reach flashover (e.g., small room with sealed windows and the door closed).

4. Fully Developed Stage

At this post-flashover stage, energy release is at its greatest, but is generally limited by ventilation (more on this in a bit). Unburned gases accumulate at the ceiling level and frequently burn as they leave the compartment, resulting in flames showing from doors or windows. The average gas temperature within a compartment during a fully developed fire ranges from 700o – 1200o C (1292o – 2192o F) Remember that the compartment where the fire started may reach the fully developed stage while other compartments have not yet become involved. Hot gases and flames extending from the involved compartment transfer heat to other fuel packages (e.g., contents, compartment linings, and structural materials) resulting in fire spread. Conditions can vary widely with a fully developed fire in one compartment, a growth stage fire in another, and an incipient fire in yet another. It is important to note that while a fire in an adjacent compartment may be incipient, conditions within the structure are immediately dangerous to life and health.

5. Decay Stage

A compartment fire may enter the decay stage as the available fuel is consumed or due to limited oxygen. As discussed in relation to flashover, a fuel package that does not contain sufficient energy or does not have a sufficient heat release rate to bring a compartment to flashover, will pass through each of the stages of fire development (but may not extend to other fuel packages).

On a larger scale, without intervention an entire structure may reach full involvement and as fuel is consumed move into the decay stage. However, there is another, more problematic way for the fire to move into the decay stage. When the ventilation profile of the compartment or building does not provide sufficient oxygen, the fire may move into the decay stage. Heat release rate decreases as oxygen concentration drops, however, temperature may continue to rise for some time. This presents a significant threat as the involved compartment(s) may contain a high concentration of hot, pyrolized fuel, and flammable gaseous products of combustion.

REFERENCE

Abdullah, J. (2001),”Fire in Tall Buildings: Occupant’s Safety and Owner’s Liability”, Kuala Lumpur : International Law Book Services.

 

Ayuba P, Olagunju, R.E. and Akande O.K (2012).Failure and Collapse of Buildings in  Nigeria: The Role of Professionals and other Participants in the Building Industry.

Interdisciplinary Journal of Contemporary Research in Business.Vol 4, No. 6.

Benjamin, J. A., (1984), “The Challenge of Smoke”, Fire Safety J. vol. 7, 3 – 9.

Bryan, J. L., (1986), “Human Behaviour and Fire”, Fire Protection Handbook, 16th Ed. Quincy, MA :NFPA

Cote, A. E., (1986), “Assessing the Magnitude of the Fire Problem”, Fire Protection Handbook, 16th Ed., Quincy, MA : NFPA.

 

Craighead, G. (1995), “High-Rise Security and Fire Life Safety”, Boston :Butterworth-Heinemann.