Tuesday, 8 December 2015

Evolution of Management Systems

Evolution of Management Systems

DEFINITION OF MANAGEMENT
Management in businesses and organizations is the function that coordinates the efforts of people to accomplish goals and objectives by using available resources efficiently and effectively.
Management includes planning, organizing, staffing, leading or directing, and controlling an organization to accomplish the goal or target. Resourcing encompasses the deployment and manipulation of human resources, financial resources, technological resources, and natural resources. Management is also an academic discipline, a social science whose objective is to study social organization.
Evolution of Management Systems
Bold text A management system is the framework of processes and procedures used to ensure that an organization can fulfill all tasks required to achieve its objectives. After World War II, the reigning paradigm of product-oriented mass production had reached its peak. Examples of management systems at that time are linear assembly lines, organizational hierarchies of command, product quality control and mass consumption.
Soon afterwards, the Deming–Juranprocess-quality teachings spearheaded a new quality orientation (later referred to as Total quality management) and propelled Japan directly to the post-war process focus (process quality control, just-in-time, continuous improvement).  The US responded by a painful and prolonged product-to-process transformation, ultimately leveling the playing field again by the mid 1980s.
At the end of the 1980s, business process reengineeringfocused on the radical redesign of the production process through the reintegration of task, labor and knowledge. As a result, lean, flexible and streamlined production processes were created, capable of fast response and internet-based integration necessary for the upcoming phase of supply chains – business-to-business(B2B) – as well as demand chains – business-to-customer(B2C). 
In the above three stages of Evolution of Management Systems, the competitive advantage was derived almost exclusively from the internal resources of the firm. At the end of the 1980s, a radical fourth shift has occurred: the competitive advantage became increasingly derived from the external resources of the firm through the extended networks of suppliers and customers.
 

Figure 1 above refers to the basic scheme of production and service delivery process. It represents the traditional linear input-process-output management system. This system has been fixed and unchanging for centuries. The only change has been in terms of changing focus on individual components of the system, emphasizing different parts of this basic scheme.
Although the scheme itself (inputs → process → outputs) remains mostly unchallenged, there are some indications that this business model will undergo major restructurings in the future (in the emerging stages of Evolution of Management Systems). It will become disaggregated and distributed, subjected to non-linear modularity[6]and bringing forth new ways of making things and delivering services. Then it will become reintegrated again, tying together globally distributed components into a unified recycling whole.
Henry Fayol and Frederick Winslow Taylor’s Contribution to Management Thought
Contribution of Henry Fayol On Management Thought
Industrial activities:
Fayol (1949) suggest that ―All activities to which industrial undertakings can be divided in to the sig groups:
A. Technical activities (Production, Manufacture);
B. Commercial activities (Buying, Selling and Exchange);
C. Financial activities (Search for and optimum use of capital);
D. Security activities (Protection of property and person);
E. Accounting activities (Stocktaking, Balance Sheet, Cost, Statistics);
F. Management activities (Planning, Organizing, Command, Coordination, Control).
Elements of Management:
Fayol‘s (1949) answer was unique at the time. The core of his contribution is his definition of management (To forecast and plan, to organize, to command, to coordinate and to control) as comprising five elements (Gulick and Urwick, 1937):
To forecast and plan:
Examining the future and drawing up the plan of operation;
To organize:
Building up the structure, material and human of the undertaking;
To command:
Maintaining activity among the personnel;
To coordinate:
Building together, unifying and harmonizing all activities and effort;
To control:
Seeing that everything occurs in conformity with established rules and expressed command.
General Principles of Management:
 Fayol (1949) summarizes a number of General Principles of Management on his own personal experience and observation, most become part of managerial know-how many are regarded as fundamentals tenets. Fayol outlines the fourteen principles:
Division of labor:
Concept of specialization at work;
 Authority:
The right to give order and the power to exact obedience;
Discipline:
Based on obedience and respect.
Unity of command:
Each employee should receive orders from only one superior;
Unity of direction:
One boss and one plan for a group of activities having the same objective;
Subordination of individual interest to the general interest:
To abolish the tendency of placing individual interest ahead of the group interest;
Remuneration:
Employees should receive fair payment of service.
Centralization:
Consolidation of management functions. Decisions are made from the top.
Scalar chain:
Formal chain of commanding run from the top to bottom of the organization;
Order:
All materials and personnel have a prescribed place, and they must be remained there;
Equity:
Resulted from kindness and justice;
Stability of tenure:
Limited turnover of personnel. Life time employment for good workers;
Initiative:
Call for individual zeal and energy in all efforts; and
Sprits de crops:
Stressed the building of harmony and unity within the organization. Fayol was a firm believer that if organizational leaders used his theories, including the 14 principles of management, they would be able to achieve performance excellence. For example, the principle of division of labor would help employees be more efficient by specializing in different tasks (Fayol,1949; Meier and Bohte, 2000). Rodrigues (2001) agreed that an organization‘s proper implementation of Fayol‘s 14 principles of management would lead to organizational efficiency and effectiveness. He especially supported the concept of continuous training of personnel. Training is important because it not only improves employees‘ skills, knowledge, and competencies, but it also enhances organizational capacity, capability and performance which are essential ingredients for organization effectiveness and are the foundation of an organization (Rodrigues, 2001).
Qualities of Manager:
According to Fayol (1949) the business requires a basis in the people who carry them out: a) Physical qualities; b) Mental qualities; c) Moral qualities; d) General education; e) Special knowledge of the function concerned; and f)Experience. Fayol draws the conclusion that the major ability required in the managerial function. However good technical or other ability may be, if the managerial function is week the business will not be succeed. He made a point that management is not being taught along with the technical subject because there is no theory of it to teach. An adequate theory is essential.
Managerial Duties of an Organization:
To organize a business is to provide it with everything useful for its functioning: raw materials, tools, capital, personnel. All these may be divided into two main sections, the material organization and the human organization. According to Fayol, manager concerned only with the human organization. Seemingly out of place, sixteen managerial duties of an organization follow the definition- Ensure that the plan is judiciously prepared and strictly carriedout; See that the human and material organization is consistent with the objective, resources, and requirements of the concern; Set up a single, competent energetic guiding authority; Harmonize activities and coordinate efforts; Formulate clear, distinct, precise decisions; Arrange for efficient selection-each department must beheaded by a competent, energetic man, each employee must be in that place where he can render greatest service; Define duties clearly; Encouraging a linking for initiative and responsibility; Have fair and suitable recompense for service rendered; Make use of sanctions against faults and errors; See the maintenance of discipline; Ensure that individual interests are subordinated to the general interest; Pay special attention to the unity of command; Supervise both material and human order; Have everything under control; and Fight against excess of regulations, red tape and proper control.
Command:
According to Fayol (1949), the purpose of command is to set the human organization in motion towards its objectives. Its objective is to get optimum return from all employees. To command effectively- The manager must know its employees; get rid of the incompetent; know the employer-employee agreements; Set a good example; periodically review organization; Use conferences with the subordinates to ensure unity of direction, delegate the details and establish esprit de corps. Fayol wrote as the practical man of business reflecting on his long managerial career and setting down the principles he had observed. His observation fit amazingly well into the currently developing would of management theory. Since all enterprise require managing, the formulation of a theory of management is necessary to its effective teaching (Weihrich H. and Koontz H., 1994).
Contribution of Frederick Winslow Taylor On Management Thought
Contribution of Frederic Winslow Taylor can be discussed into three phases:
1). Principles of Management;
 2). Mechanism of Management; and
3). Philosophy of Management.
 Principles of Management:
The fundamental principles that Taylor (1911) saw underlying the scientific approach to management are
The development of a scientific method of designing jobs to replace the old rule-of thumb methods; this involved gathering, classifying and tabulating data to arrive at the one best way‖ to perform a task or series of task.
The scientific selection and progressive teaching and development of employees; Taylors how the value of matching the job to the worker. He also emphasized the need the study worker strengths and weakness and to provide training to improve workers performance.
Bringing together of scientifically selected employees and scientifically developed methods for designing jobs; Taylor believed that new and scientific methods of job design should not merely be put before an employee; they also should be fully explained by management. He believed that employees would show little resistance to changes in methods if they understood the reasons for the change and they show a change for greater earnings for themselves.
Division of work resulting in an interdependence between management and the worker ;Taylor felt that if they were truly dependent on one another, than cooperation would naturally follow.
Mechanism of Management:
He put the right person on the job with the correct tools and equipment, had the worker follow his instruction exactly, and motivated the worker with an economic incentive of a significant higher daily wages. Based on his ground breaking studies of manual work using scientific principles, Taylor became known as the ―Father‖ of scientific management (Robins S. P., Coulter M. and Vohra N., 2010). Standardization, time and motion studies, functional foremanship, production planning and control, price wage system of payment on differential basis were the main ideas enunciated by Taylor.
Philosophy of Management:
Scientific management was a complete mental revolution for both management and employees towards their respective duties towards each other (Taylor, 1911). It was a new philosophy and attitude towards the use of human efforts. Thus Taylor advocated a philosophy of management under which management would undertake a basic responsibility of planning and control and prescribe the rules, laws and formulas to guide the actual operations by man and machines, so as to help employees to produce at lower cost to the employer and with more remuneration to themselves. Management should evolve laws of standard work and rules for work-measurement. Workers should be trained in advance in detail. Detailed instruction in writing should be issued to workers regarding the task to be done and methods to be used in completing the task. What, how and when the work is to be performed is to be included in management plan. Taylor shorted the management to motivate the personnel not merely by giving orders, show the authority etc. but by selecting, teaching and developing the workmen and heartily co-operating with them.
 FAYOL VS TAYLOR
 Attempts have been made to compare and contrast the work of Fayol and Taylor. The works of  Fayol and Taylor are essentially complementary. Both believed that proper management of personnel and other resources was the key organizational success. Both use scientific approach to management. Berdayes (2002) suggests that the following are ideas of Fayol and Taylor that unite their work:
Work processes, organizational structures, and an emphasis on a hierarchical division of labor. Creation of the concept of the organization as a whole (Fayol delineated clear lines of authority into a conceptual and functional unity, and similarly Taylor emphasized formalization of work processes into a total organization).
Emphasis on formal rationality by supporting scientific techniques, order, and efficiency. The role of managers is to work with and encourage their workers. Taylor (1947)
Indicated that managers should work along with the workers, helping, encouraging, and  smoothing  the way for them. However, he also sought to change their mental attitudes and  behaviors on  the basis of scientific principles so as to improve operational efficiency. Along  this  same line, Fayol  (1949)  noted  that  need  to determine their workers abilities, encourage and train them, and reward enthusiasm, initiative and success. there major difference was in their orientation. Fayol stressed the management of organization while Taylor stressed the management of operative work. Fayol wrote during the same time period as Taylor. Fayol attention was directed as the activities of all managers while Taylor was concerned with first line managers and the scientific method, Fayol wrote from personal experience as he was the managing director of a large French coal-mining firm.
Comparison between Henry Fayol and Frederick Winslow Taylor
Basis of Comparison Henry Fayol Frederick Winslow Taylor
1. Perspective Top management Shop floor level
2. Focus Improving overall administration through general principles Improving productivity through work simplification and standardization
3. Personality Practitioner Scientist
4. Results Universal truths developed from personal experiences Scientific observation and measurement
5. Major Contribution A systematic theory of management Science of industrial management Fayol observed management from the top down while Taylor worked at management from the bottom up. Fayol was a top manager and was obviously in a better position than Taylor to observe the functions of a manager. 
Fayol‘s main concern was to improve the management of total organization while Taylor concentrated on improving the management of jobs. There for Fayol‘s administrative theory has a wider application than Taylor‘s Scientific Management.
 CONCLUSIONS 
Henry Fayol made outstanding contribution to management thought. He made a clear distinction between operational activities and managerial activities. He clearly specified the functions of management by a systematic analysis of management process. This isolation and analysis of management as a separate discipline was his original contribution to the body of management theory. Fayol firmly advocated that management should be formally taught. He also highlighted the universal characteristics of management principles. He was father of management principles many of which have stood the test of time. He developed a framework for further study and research. One of the greatest contributions of Fayol is that his ideas pave the way for developing the theory of management. However Fayol‘s works has been criticized on several counts-
Firstly, his theory is said to be too formal. Secondly, he did not pay adequate attention to worker. Thirdly, there is vagueness and superficiality about some of his terms and conditions. Fourthly, he hinted at but did not elaborate that management can and should be taught. Despite of these limitations, Fayol made a unique and outstanding contribution to management theory.
Taylor‘s ideas, research and recommendations brought into focus technological, human, and organizational issues in industrial management. Benefits of Taylorism included wider scope for specialization, accurate planning, timely delivery, standardized methods, better quality, lesser costs, minimum wastages of materials, time and energy and cordiall relationship between the management and workmen. Worker earned more wages, employees saved their cost, turned out larger and better output and customer got in lighted with planning and doing. Taylor improved management methods by emphasizing the concept of work measurement. He developed the techniques of measure quantities, designed wage incentive scheme and lacked the problems of organizing complex.

References
F.W.Taylor, Scientific Management ( 1911), Harper Brothers, New York
Mildred Golden Pryor and Sonia Taneja (2010), Henri Fayol, practitioner and  theoretician revered and reviled, Journal of Management History Vol. 16 No. 4, pp. 489-503, Emerald Group Publishing Limited http://en.wikipedia.org/wiki/Scientific_management. Retrieved July 24, 2013.
Fayol, H. (1949),General and Industrial Management, Sir Isaac Pitman & Sons, London(translated by Constance Storrs).
Parker, L.D. and Ritson, P. (2005), “Revisiting Fayol: anticipating contemporary management, British Journal of Management, Vol. 16, pp. 175-94.
Bakewell, K.G.B. (1993), Information: the seventh management function,  Information andSecurity Management Journal, Vol. 1 No. 2, pp. 29-33.
Wren,  D.A. (1972), The Evaluation of Management Thought, The Ronald Press, New York. NY. Breeze,
J.D. (1985), Harvest from the archives: the search for Fayol and Carlioz, Journal of Management, Vol. 11 No. 1, pp. 43-54.
Robbins, S.P., Bergman, R., Stagg, I. and Coulter, M. (2000), Management,  2nd ed., Prentice-Hall, Sydney.
Armstrong, M. (1990), Management Process and Function, Short Run Press, Exeter.

SCHOOL OF MANAGEMENT THOUGHT

SCHOOL OF MANAGEMENT THOUGHT

The following are the various school of management thoughts.
1. The Operational (Management Process) School.
2. The Empirical School.
3. The Human Relations or Human Behaviour School.
4. The Social Systems School.
5. The Decision Theory School.
These schools of thought are discussed below:
1. The Operational (Management Process) School:
The exponents of this school concede that the primary function of management is to get things done with and through people as individuals and as members of work groups. That is why; this school is known as Operational School. It views management as a universally applicable body of knowledge and theory applicable to all types and levels of organizations.
This school aims at finding out the main functions of the managers and to classify them into basic principles of management practice. This school attempts to analyse intellectually the nature, purpose, structure and the underlying process of each of the functions of management. The essence of this approach, therefore, lies in the analysis of the process of management.
This school of management thought was propounded by the noted French management thinker and practitioner, Henry Fayol. A contemporary of Taylor, Fayol for the first time attempted a systematic analysis of the overall management process. His ideas on management have been referred as the Administrative Management Theory, which later evolved into the Management Process School.
This approach is also known as the “Traditional Approach”, “Universalist Approach”, and “The Classicist Approach.”
Harold Koontz says that this approach bases its analysis on the following fundamental beliefs:
(i) Management is an operational process which can be divided into various functions.
(ii) Experience can furnish grounds for distillation of theory and principles. It can also help to improve the practice.
(iii) The principles of management can be tested through research and experiment to find their validity and improve their applicability.
(iv) Management is an art but like medicine or engineering, it relies on its principles.
(v) Management principles shall never become untrue even if a practitioner ignores them in a given situation.
(vi) Manager’s job may be affected by varied environmental factors. But the management science need not cover all the fields of knowledge in order to serve as a foundation of management practice.
Criticism:
This school has been criticized on the grounds that (a) it is losing its validity for want of any significant contribution after Hemy Fayol’s contribution at the end of the 19th century; (b) The so called universal principles of management have, on various occasions, failed to stand the test of empirical scrutiny ; (c) Since organizations function under dynamic conditions, searching for universal principles may not always prove to be a full-proof exercise.
Conclusion:
Despite all this criticism this School has certainly provided a concept on framework which can be beneficially utilized to identify the essentials of management.
2. The Empirical School:
It is also named as the management by customs school. The pioneers who have contributed to this school of thought maintain that management is a study of the past experience of managers. The important contributors associated with this school are Earnest Dale, the researchers from Harvard Business School and the Management Associations in different countries, more notably the American Management Association.
According to them (a) Management is the study of experience ; (b) the managerial experience can be gainfully utilized by passing it over to the practioneers, students, etc. and also for drawing generalizations on management activities ; (c) the success and the failure of management in the process of decision making can provide a fruitful guidance to the manager in a similar situation that may arise in future, i.e., case studies in management prove useful in training future managers and (d) any theoretical research shall be based on practical experience.
Thus the empirical schools of thought depends heavily on the precedents connected with the managerial situations handled by the managers and their own experience on the ground that research and thought evolved in the course of study is sure to help in ready verifications of principles.
Since this approach lays emphasis on case studies of management, it is also known as “Case Study Approach”. By analyzing cases, certain generalizations can be drawn and can be applied as useful guides for future thought or action.
Defects of Empirical Approach:
The orientation of this approach towards past is regarded as its main defect. Critics feel that a manager has to work under dynamic conditions and that history does not repeat itself. There may be a great contrast between the situations of the past and those of the present.
Harold Koontz opines that “Management unlike law is not a science based on precedents and situations in the future exactly comparable to the past are exceedingly unlikely to occur. There is positive danger in relying too much on past experience and on undistilled history of managerial problem solving for the simple reason that the technique or approach found right in the past may not fit into a situation of the future”.
Management is not an exact science based on precedents. Further, past situations may not occur in the same pattern and the techniques evolved to solve the problems of the past may prove irrelevant to the situations of the Future.
Moreover, learning of management through experience is a time consuming process and top-level executives have neither patience nor time to learn about the management in this fashion. Finally, this approach altogether discards the theoretical aspects of management.
3. The Human Behaviour School:
Elton Mayo, the director of the “Hawthorne Studies” is the proponent of this school of thought.
Human behaviour school considers the behaviour of human beings as the focal point of the management action. It does not view management strictly as a technical process. Based on its objectives and scientific research of individual behaviour and motivation, it was established that the relationship between morale and productivity had been over-simplified by human relationlists.
The Behaviour Science approach to management laid more stress on the application of the methods and findings of general social psychology and sociology for understanding the organisational behaviour. Behaviour Science Movement is regarded as a further refinement of human relations movement. It covered much wider aspects in interpersonal roles and relationships.
With its major emphasis on human relations, informal groups, communication, employee motivation and leadership styles, the behaviour approach to management has drawn attention to a wide range of socio-psychological phenomena like the dynamics of organisational behaviour, group dynamics, organisational conflict, change and techniques of organisational development.
This approach is, therefore, also known as “Human Relations Approach” or “Behavioural Science Approach”. As this approach views the manager as a “Leader” and treats all “Lead” activities as managerial activities, it is also called as “Leadership Approach.”
The following are the important aspects of the behavioural science approach:
(i) Employee Motivation:
This includes a determination of the factors that lead to high productivity and high morale.
(ii) Organisation as a social system:
It includes studies of role, status symbol as well as the functions of informal groups.
(iii) Leadership:
This school also underlines the role of personal leadership in management. The scope of this school includes study of human relations and how the manager can grasp their implications, study of manager as a leader and the way he should lead and study of group dynamics and interpersonal relationships. It involves the study of successful and unsuccessful managerial behaviour.
(iv) Communication:
It includes the study of factors relating to achieving understanding among persons in an organisation as a consideration of the best structuring and use of the channels of contract in an organisation.
(v) Employee Development:
It is concerned with the continued upgrading of employee skills and managerial skills.
This new thinking in management started with the development of need hierarchy by Abraham Maslow in 1940, followed by the works of Frederick Herzberg, Douglas Mcgregor and Kemis Likert. Research during this period has provided sufficient evidence that human element is the key factor in the success or failure of an organisation.
Job enlargement, participation of employees in decision-making process and development of an organisational climate more conducive to the satisfaction of human needs, less reliance on the use of formal authority, and changes in the traditional methods of supervision and control are the tools suggested by the contributors of this era for increasing the productivity of the human beings.
Defects of Human Behaviour Approach:
Like other approaches, the human behaviour approach also has its own defects. This approach leans heavily on individual psychology. It goes too far in insisting that people need to be made happy so that the organisation can function effectively.
The study of human interactions is of course, very important and its usefulness cannot be disputed. But the field of human behaviour alone cannot cover the whole field of management.
4. The Social System School:
The generalisation of this school of thought is heavily oriented to sociological concepts. This school believes that the theory of management rests on the understanding of the interaction of social groups. This school is closely related to the Human Behaviour School of management. “This includes those researches that look upon management as a social system that is system of cultural inter-relationships.
Sometimes, as in the case of March and Simon, the system is limited to formal organisation, using the term ‘Organisation’ as equivalent to enterprise rather than the authority activity concept used most often in management. In other cases, the approach is not to distinguish the formal organisation but rather to encompass any kind of system of human relationship.”
Chester Barnard is considered as the father of social system school. He examined the inter-relationships within the organisation. He developed his concept .of Formal Organisation. It is regarded to be a major contribution in the field of management. He visualized management as a co-operative system where persons are able to communicate with each other and who are willing to contribute effectively towards a conscious common goal.
He started with the individual, moved to co­operative organised endeavour, and ended with the executive functions. His publication ‘The functions of the Executive’ (1938) is a significant work. The other exponents of this school of thought are Max Weber, Maslow, Argyris, March and Simon, Herzberg and Likert.
The main thrust of the social system is to study different aspects of social systems. For the contributors of this school (i) organisation is essentially a cultural system composed of groups of people who work in co-operation (ii) complete co­operation among the members as well as the groups is very necessary for achieving the goals of the organisation (iii) All the efforts of the management should aim at the establishment of harmony between the goals of the organisation and goals of the groups and the individual members, and (iv) the existence of relationship between internal as well as external environments and change can be easily identified.
Criticism:
Even though this school has made valuable contribution in the field of management still, critics feel that (i) Sociology is one of the important tools required to understand the organisation as a social entity and the different types of cultural pressures and conditions under which this social system has to work and (ii) it cannot do justice to many other aspects of the working of an organisation including the technological factors and the factors connected with the psychological behaviour of the people which is, in turn, connected with the organisation, whether they are individuals or groups.
As observed by Koontz, this approach is, broader than management and in practice it tends to overlook many important concepts and techniques of management.
5. The Decision Theory School:
The exponents of this school led by Simon concentrate their attention fully on decision-making. They are of the view that all the managerial functions boil down to one point that is decision-making; Decisions are taken through rational choice among different alternatives within the given constraints. The school’s stress is on the study of alternatives through right assessment of different variables.
“This group concentrates on rational approach to decision … the selection from among possible alternatives of a course of action or of an idea. The approach of this school may be to deal with the decision itself or with the persons or organizational group making the decision or with an analysis of the decision process.
Some alternatives are regarded to be fairly large to the economic rationale of decision, while others regard anything which happens in an enterprise the subject of their analysis, and still others expand decision theory to cover the psychological and sociological aspects and environment of decisions and decision makers.”
The exponents of these schools go for beyond decision making and they cover almost the entire range of human activities in an organization as well as the macro conditions within which the organisation functions.
They have expanded their area of theory building from the decision making process to the study of the decision maker. The decision theorists start with the small area of decision making and then look at the entire field of management through this keyhole.
This school is heavily oriented to model building and different mathematical tools and techniques. A wide range of mathematical and rational research tools and techniques have been used for taking decisions with regard to the great variety of problems that management faces, such as work study, work flow, inventory control, incentives, marketing, communication, planning and information system etc.
The methods of decision making also have undergone radical changes from the past. Several new concepts and approaches have been developed in the field of decision making. For example, the concept of sub-optimization, marginal decisions and “muddling throw are some of the major developments in the field of decision making. Slowly and gradually the superficial methods of decision making are giving way to real situation-oriented approaches to management.
The advocates of this school contemplate that the future development of management discipline will revolve round the decision-making. Thus, in their view, the entire field of management is covered by this school.
Notes on general review of management of schools:
From the foregoing description of various schools of management thought, it is quite clear that some of schools overlap each other. Management is no longer the restricted domain of managers and entrepreneurs. Different disciplines have contributed to the growth of managerial thought. As a result of these diverse contributions, management has grown as a discipline. Some of the approaches take only partial view of the area of management and see the managerial problems through coloured glasses. This is owing to the fact that the exponents of particular schools have a tendency to stress the concepts as developed in their parent disciplines.
This exclusiveness has blurred their vision and they take part or parts to be the whole. They do not attempt to see that management is an inter-disciplinary subject which draws heavily on the knowledge developed in different disciplines.
Inspite of this fact managements has established itself as an independent discipline. Managerial problems cannot be viewed only from one exclusive angle which the advocates of different schools have attempted to do.
Various approaches to managements theory and exclusiveness of theories have created confusion. Different intellectual cults have developed. Prof. Koontz has called this phenomenon as, “The Management Theory Jungle.” He has suggested for taking fresh look on different schools of thought in management and finding the possibility of evolving a unified theory of managements.
In his opinion “the different approaches of management were not different schools of management, but are a kind on intellectual division of level in studying the problems of managing.” With a view to disintegrating the management theory jungle, it is essential that the area of management should be clearly defined.
It should have a specific area of study. A proper distinction should be made between the subject-matter of management and the tools of analysis of different subjects, which are not a part of management discipline. The contributions of other disciplines should not make management a part of those disciplines. Management should be integrated with other disciplines but it should not lose its specific identity.
References
F.W.Taylor, Scientific Managements ( 1911), Harper Brothers, New York
Mildred Golden Pryor and Sonia Taneja (2010), Henri Fayol, practitioner and  theoretician revered and reviled, Journal of Management History Vol. 16 No. 4, pp. 489-503, Emerald Group Publishing Limited http://en.wikipedia.org/wiki/Scientific_management. Retrieved July 24, 2013.
Fayol, H. (1949),General and Industrial Management, Sir Isaac Pitman & Sons, London(translated by Constance Storrs).
Parker, L.D. and Ritson, P. (2005), “Revisiting Fayol: anticipating contemporary management, British Journal of Management, Vol. 16, pp. 175-94.
Bakewell, K.G.B. (1993), Information: the seventh management function,  Information andSecurity Management Journal, Vol. 1 No. 2, pp. 29-33.
Wren,  D.A. (1972), The Evaluation of Management Thought, The Ronald Press, New York. NY. Breeze,
J.D. (1985), Harvest from the archives: the search for Fayol and Carlioz, Journal of Management, Vol. 11 No. 1, pp. 43-54.
Robbins, S.P., Bergman, R., Stagg, I. and Coulter, M. (2000), Management,  2nd ed., Prentice-Hall, Sydney.
Armstrong, M. (1990), Managements Process and Function, Short Run Press, Exeter.

SAMPLE OF QUESTIONNAIRES FOR THE AWARENESS AND USE OF E-LIBRARY FACILITY

A Study Of Awareness And Use Of E-Library Facilities At The National Open University Of Nigeria, Abuja, Nigeria
Instruction: Please tick the appropriate bracket
Section A:   Personal Data
  1. Gender:  a. Male [   ] b. Female  [   ]
  2. Age (year): a. less than 30  [   ] b. 31-39 [ ] c. 40-49 [   ] d. 50 and above [   ]
  3. Work experience (year): a. less than 10 [   ] b. 11-19 [   ] c. 20-29 [   ] d. 30and above [   ]
Section B: Awareness and Patronage of e-library
  1. Are you aware of the availability of e-library in National Open University of Nigeria, Abuja? a. Yes [   ] b. No [   ]
  2. How do you learn to access and use the e- library facilities /resources?
    1. Through a workshop organized by the University management  [   ]
    2. Through the help of the e- library assistant    [   ]
    3. Through self – training /peer      [   ]
    4. Others (please specify)       [   ]
  3. How often do you use the e- library facilities/resources?
    1. Daily           [   ]
    2. Weekly         [   ]
    3. Monthly         [   ]
    4. Occasionally         [   ]
Section C: Usefulness and effectiveness of e-library in academic research
  1. What are your purpose (s) for accessing the e-library facilities/ resources?
    1. Research          [   ]
    2. Information          [   ]
    3. Preparing lecture        [   ]
    4. Project  Journal note        [   ]
  2. How does the use of the e- library facilities improve the quality and quantity of your work?
    1. Greatly improved        [   ]
    2. It has improved a little        [   ]
    3. It has not improved       [   ]
  3. What is the level of your satisfaction in the use of the e- library
    1. Very satisfactory         [   ]
    2. Satisfactory         [   ]
    3. Not satisfactory         [   ]
  4. To what extent does the deployment of e-library influenced the National Open University Library, Abuja capacity of supporting student in academic research?
    1. To a large extent        [   ]
    2. Averagely         [   ]
    3. Poorly         [   ]
  5. Does the utilization of e-library leads to effective and efficient research?
    1. To a large extent        [   ]
    2. Averagely         [   ]
    3. Poorly           [   ]
  6. Are there state of the art equipment and resources in the e-library of National Open University of Nigeria, Abuja?
    1. To a large extent        [   ]
    2. Averagely         [   ]
    3. Poorly         [   ]
  7. What are the problems identifiable in the use of the e-library?
    1. Slow response rate       [   ]
    2. Lack of workstation       [   ]
    3. Poor attitude of workers       [   ]
    4. Inadequate seat        [   ]
    5. Others (please specify       [   ]

 

ONLINE STUDENT AND STAFF INFORMATION SYSTEM

ONLINE STUDENT AND STAFF INFORMATION SYSTEM

ABSTRACT
Online student and staff information system (OSSIS) is a software application that institutions use to manage data regarding their students and staff. The manual method of storing information has been a major challenge facing many institutions today.Manyliterature were reviewed during the course of this project. The problem encountered using manual method of storing students and staff information are lost of file by fire outbreak, file misplacement which leads to lost of information regarding students and staff of the institution.  This project work is aimed at designing an online students and staff information system for students affairs division Federal Polytechnic Nasarawa to allow both students and staff record to be kept properly and to register, update, generate pin, create account and search record of students and staff there by eliminate the problems that were associated with the manual method of keeping students and staff information. This system is designed using the top down approach methodology and the system is interactive and user friendly therefore, any changes in future can be easily made. PHP programming language was used for designing this software due to its robustness and the data will be managed using MY SQL database. Mozilla Firefox browser was use for testing the result of the designed system and the result of the testing carried out on the developed system attest to the fact that indeed, online students and staff information system can be use to keep accurate information of students and staff of the institution. This system designed will provide a comprehensive online students and staff information system needed for use by the institution. 
 CHAPTER ONE
INTRODUCTION
1.0     Introduction
Online can be refers to condition of being connected to a network of computers or other devices.  Because of the capabilities of speed and accuracy which the computer possesses, it has become an indispensable tool used in various data processing operations in producing information. Most institutions and organization today are becoming fully computerized i.e, equipped with computer for doing various complex tasks which are cumbersome to be executed manually. Task such as storing student and staff information entails some difficulty especially when the manual system is employed.
Student and staff information system is a software application for Education establishment to manage student and staff data. Institutions use students and staff information to keep record of the total number of students and staff in the institution and to keep record of number of students who graduated from the institution and their year of graduation.
On-line student and staff information system is a computerized or web based system designed for student affairs division Federal polytechnic Nasarawa. This system is capable of storing student and staff information, create staff account, register students, generate pins for school fees, view list of registered staff , search students by their department, level, sex etc and both  students and staff records can be updated at will. This system designed will enable both students and staff to view information concerning them irrespective of their location. 
There are two user categories in this system                                             
a.     Students and b. staff.
1.1   Background of the Study
Information system in an academic institution provide a comparative information on the way in which institutions of higher learning go about to establish a complete database of individual students and staff to help educators accomplish their mission. The automation of student and staff information when fully implemented will replace and effectively enable the work to be easy. However, because of the capabilities of speed and accuracy which a computer possesses, it has also become indispensible. Hence the need for online students and staff information system.
1.2    Statement of the Study
As student’s population of Federal Polytechnic Nasarawa increases, the work of the student’s affairs division becomes tedious, difficult and in most cases impossible for management to obtain required information about students. The new proposal on-line student and staff information system was found necessary of their encounter in the manual system as stated below.
1.     Delay or slow rate of processing record for hostel allocation
2.     Delay or slow rate of processing record for list of NYSC students.
3.     There may be misplacing of record file by the student affairs department.
4.     Delay in getting adequate information of students.     
1.3     Aim and objectives
The aim of this project is to design and implement an on-line student and staff information system, to enable easy access, storage, update and retrieval of students and staff record of students affairs division Federal Polytechnic Nasarawa for effective and accurate decision making.
     Objectives: 
1.     To create a useful and flexible program for student affairs division.
2.     To replace the existing manual method of keeping student  and staff information which is a tedious task.
3.     To reduce/save cost and time in keeping student and staff information.
4.     To enhance accuracy and efficiency on keeping students information.
5.     To increase the speed of access and update of keeping student information there by facilitating decision making.
6.     To have a roburst database that will store students and staff information and other relevant information needed.
7.     The software will allow both students and staff information to be kept into the database.
8.     The software will be able to generate pin to restrict non authorized user from having access to the program
1.4    Significance of the Study
An on-line student and staff information system is of great importance considering the increase in the number of staff employed and students admitted.
1.                  It will save cost of getting information of students.
2.                 It will increase the speed of access and update of student and staff information.
3.                 It will facilitate decision making by the division or academic.
4.                 Easy in checking students with irregular admission.
5.                 Minimize wastage of resources in bearing student information.
1.5     Scope and Limitations of the Study
The scope of this project is to design software that will involve database which will capture and process student and staff information  of student affairs division Federal Polytechnic Nasarawa.
Limitation
Some difficulties and limitation where encountered during this project process
1.     Lack of full cooperation from staffs of some certain information.
2.     Some of the required information cannot  be obtained due to improper  method of record keeping.
3.     High proximity to research area from home.
1.6     Research Methodology
Three methods were employed in this study for the purpose of the research, the methods includes :
1.     Internal search ( personal interview)
2.     Observation
3.     Investigation
     i.   Personal interview
The personal interview played a leading role in this paper work. In fact, it provided a lot of information; questions and answers would not have been available if only the reference to textual materials method was used without supporting it with some interview. Specific questions, which require adequate answers were prepaid and asked at student affairs division.
 ii.      Observation Method:
I collected data based on observation and findings, at the end I was able     to know how the student affairs division keep information of students and staff.
iii.      Investigation:
I went to investigate about students and staff information and  how importance their information will be to students affairs division.
1.7     Definition of Terms
1.     Data:      Data is the raw materials of organizational life; it consists of disconnected numbers, words, symbol and syllables.
2.     Record: These are collection of information about a person or thing e.g. names, sex, address etc
3.     Information:information is data that have been processed into a form that is meaningful to the user.
4.     System:   system consisting of people, technology and procedure that work together to achieve a set of goals.
5.     Database:        A generalized, integrated collection of data structured to model the natural relationship in data.
6.     Computer: is an electronic device that specifically accept input, store, organize, find information, do calculation and control other machines.
7.     System: This is an organized set of ideal or a coherent set of inter-independent component which exist for some purpose views as a whole.
8.     Server: A computer that makes program and data files available to other computer on a network.
9.     WAMP SERVER: A web developed plate form on window allowing you to create dynamic web application with PHP, and MYSQL
10.            Software: Collection of computer program and related data that provides the instruction for telling a computer what to do and how to do it.
11.            PROGRAM: is a set by set instruction giving to the computer to carry out the specific tasks which generate the desired information for the user.
12.            PHP: The PHP hypertext pre-processor is a programming language that allows web developer to create dynamic content that internet with database.

   

CHAPTER TWO
LITERATURE REVIEW
2.0            General Overview
Student and staff information is an important procedure in every higher institution of learning. The level of significance cannot be over emphasized and this accounts for its existence in all tertiary institution as a mandatory procedure to keep information of students and staff at all levels. This is because, there is needed to know every staff and students in the school database. Without this record, it will be difficult to effectively store students’ staff record.
2.1     Review of Related Literature
Many textbook, literature and journal have attempted to define the concept of information and its components. MAJI E. (1995): said “I had implemented the use of password before an access can be made to run the program successfully, those access will only be made known to the user of my new system, he added that an unauthorized user will be thrown out of the program after the third attempt to enter wrong password. Furthermore, in attempt to describe the storage of data performed by the computer system a writer stressed that a warehouse stock file which contain record of many times, the computer system can be used to maintain this file so that for items, the quantity in stock shown on the records is the same as the actual quantity updated every time goods enter or leave the warehouse.
POPOOLA.(2000):What actually keeps the civil going in any modern system of government is recorded information called  “records” which are used for planning decision making, and controlling. The need for a record management programmed in all organization cannot be overstressed in digital age.
The purpose and essence of any record system in the right place in the right order, at the right time for the right person at the lowest cost. For this feat to achieve an integrated record management program is needed.
RETREMMA H. (2001): Observed that  it is perhaps appreciated to state at this junction, the contemporary changes in information stir and retrieval. We are today in a computer age. Computer as we know, are electronic processing equipment that can handle job faster more efficient and without mistake than human. Computer can handle very large valve of job, which could ordinarily overwhelmed human being or take much longer time to complete the job and can also process valve of data into information that could be use for decision making. Using computer, it will be easy to get information not only on professional career prospect but also access information on numerous level of social economic development science agriculture, and income, housing and medical provision.
Dr Lawrence C. Pejukwu: in the daily time of Friday December, 1995 reveals in his research work titled “Bridging the gap on Nigeria “ database envisaged that “ o:n major handicap research often suffer in Nigeria  is the lack of access to handling a scientific database as easy reference point of information gathering the people of Nigeria, its valve of human activity such as vital events, the general characteristics by classification, specific social and economic in dice among other useful information that be sort about the country or its people. He went further to state that Nigeria can be supper power in all area of field if the abundant resources are well licensed by the effective method of documentation.
STAIR S. (1980): say that information system can present information by producing charts and formatted document. The study of information system is not about the use of information relevant to the user.
KROENKE T. (1982): Stipulated that an information system is an open purposive system that produce information using input/output. He further that information system serve as data storage and retrieval device, in this mode the production of information. Finally, it serves as a communication device to obtain data information from other system.
CORONEL R.P (1997) describes performance to be the ability to retrieved information within a reasonable time and at reasonable cost.
LAPLANTE L. (1996) explain that basically, any database security strategy must be designed to protect data from illegal access and ensure that data can be reconstructed or  recovered in case of damage or loss.
2.2     Historical Background of the Institution
In the early 1990’s the student affairs division coexisted as the student affairs unit of federal polytechnic Nasarawa, but later changed to student affairs division in the year 2001. The division is headed by a dean an academic staff, and students affairs officer. The division is in charge of allocating hostels to the students of the polytechnic and organizing of sports competition done by the sports unit of the division. Guidance and counseling of students that needs advice which is done by the guidance and counseling unit of the student affairs division. The student’s affairs divisions also perform function of short listing names of graduated students that are due for NYSC. 

REQUEST FOR PROJECT MATERIAL

For the complete research material visit our CHECKOUT PAGE or fill the request form below:

 

[contact-form]

Thanks for your interest in the research topic we will reach out to you as soon as possible.


SUMMARY WRITING

SUMMARY WRITING

A summary, also called a precise, is a concise, clear, logical and readable representation of a longer passage.
It requires the use of the minimum number of words to convey a maximum amount of thought, brevity is a necessary quality of a summary but more importantly is clarity.
The purpose of a summary of precise, is to present the salient points of a given passage in a more concise form so that the essential ideas are easily and quickly understood in this respect, the precise is primarily a test of comprehension, which leads to an exercise in expression and style.
There are several ways of writing summaries and each student must develop the technique that best suits him or her. There is no precise formula for writing summaries, the steps below are merely suggestion to assist the student to get started.
a.     Read the passage once or twice over, for a thorough understanding.
b.     Read the questions based on the passage.
c.      Read the passage once again, making notes, or jotting down points that will help you answer the questions.
d.     Write out your own answers, to be able to write a good answer, you should observe the clues, visual and verbal, which indicate the organization of thought, the main ideas and important details, underline key words and concept with a view to drop some concepts which maybe irrelevant or repetitive.
e.      Write out the main idea or ideas
                   i.      Outline the material
                 ii.      Assume that each paragraph contains a main idea and write a summary sentence for each.
              iii.      Make rough notes of the main ideas of the passage.
f.       Using your notes or outline, ask yourself; what does this passage say? Repeat to yourself the contents of the article. This will help you to discover if you really have understand the passage.
g.     Write out the final copy, then read over the questions and your answers to ensure that there is no error.
Useful Hints In Summary Writing
a.     When writing summaries, always indicate which part of the question you are answering since the order of your answer may not correspond to that of the questions.
b.     Pick from the passage only the information demanded by the questions; do not attempt to give your own additional information, even if you know more about the topic discussed.
c.      Keep strictly to the contents of the passage and do not try to correct any piece of information given in the passage.
d.     Avoid repetition, illustrations, wordy comparison and poor expression.
e.      As much as possible, use your own words in presenting your answers. If for any reason you have to lift, or borrow words of phrases used in the passage, do it sensibly. Do not copy out whole paragraphs from the passage in answer to summary questions.
f.       Be as brief as possible, but do not give phrases and clauses when sentences are required.
g.     Make sure that the meaning whatever you have written is not ambiguous.
h.     Make sure that you do not write more than the required number of words, sentences of paragraphs.

undefinedSOLD BY: Enems Project| ATTRIBUTES: Title, Abstract, Chapter 1-5 and Appendices|FORMAT: Microsoft Word| PRICE: N5000| BUY NOW |DELIVERY TIME: Immediately Payment is Confirmed

undefinedSOLD BY: Enems Project| ATTRIBUTES: Title, Abstract, Chapter 1-5 and Appendices|FORMAT: Microsoft Word| PRICE: N5000| BUY NOW |DELIVERY TIME: Immediately Payment is Confirmed