DESIGN AND IMPLEMENTATION OF A COMPUTERIZED EDUCATIONAL ADMINISTRATIVE INFORMATION SYSTEM
(A CASE STUDY OF POST-PRIMARY SCHOOL MANAGEMENT BOARD (PPSMB)
ABSTRACT
The manual approach used in the regulation of the school
activities by the management board is very tedious and stressful. This research
work investigated into the complications encountered due to the debilitation of
man-power admitted into the school management with respect to how indepth it
affects other operational system that conduct in school with a view of
designing a computerized system to handle the work with less difficulty for an
effective decision-making. In the course of the study, an existing system was
digested and its deficiencies were detected and emphatically analysed, after
which solutions to the problems were proffered in the new designed computerized
system that is reliable and more interactive. The new system terminates all the
problems experienced with the existing system. The case study is Post-Primary
School Management Board (PPSMB) Enugu.
CHAPTER ONE
INTRODUCTION
1.1 BACKGROUND OF THE STUDY
Education is an indispensable system on which the life of
everyone is built and as well stimulates the entire life application. It could
be referred to as a process designed for the acquisition and dissemination of
skills and knowledge to the posterity of the nation. The identified system
tends to be implemented in diverse dimensions basically in schools.
For the past ten years, it has been discovered that schools
are not what they were as attributed to the wide ranging changes which have
occurred and brought new pressure associated with increased size. On the
account of this, an increasing complexity of organization has been instigated
so that stresses and anxieties of choice have been added to those of dimension.
The competent educational administration constitute the
intensity of education and its impediments mount a disturbing diffusion and
obscuring of purpose and all these changes concede with a major recruiting of
curriculum and methodology. In most cases, the manual method adopted in
monitoring some school activities undermine other roles like enrolment of
students, computation of student’s result, examination supervision and making
of examination scripts.
With
regard to the discrepancies created by the manual techniques of school
administration, the school management board should devise a competitive means
of achieving their set objective in a computerized educational administrative
information system.
1.2 AIMS/OBJECTIVES
The basic aim of the study is to provide a lasting solution
to the problems emanated from the manual means of school management. They are
as follows:
- To produce a system which tends to increase the predictability of the organization by assessing critically its obsolescence in relation to fresh challenges.
- To produce a reliable system that would coordinate most of the school activities.
- To produce a flexible and comprehensive system that would meet up with the future development in the school.
- To design and develop a computerized system that would handle the execution of school activities most especially post-primary schools so as to liquidate all the problems identified with the existing system.
1.3 STATEMENT OF THE PROBLEM
The sudden increase in the number of students enroll in each
school has transcended the manipulation of the existing system used by the
school administrators and this prompted a lot of problems which encompass the
inaccurate computation of students result by the staffs on the account of
non-availability of adequate number of computer systems for the computation.
This is a very ugly development. Also, it was very complicated to observe when
the enrolment of students should cease since there was no efficient system for
the estimation of enrolment ratio to give a signal when the enrolment tends to
move beyond the projection. All these and more are encountered due to the
debilitation of the prevailing system used. It was very difficult to point out
students who cheat in the course of examination as attributed to the
non-standard measure used in the supervision of the examination. The staff
complained seriously on the unnecessary stress encountered while marking the
examination answer scripts manually
1.4 JUSTIFICATION OF THE STUDY
The implementation of this computerized system would
definitely stimulate the school standard. This would as well help the
management to ease the burden on the staff which would be on the benefit of
students and staffs. It is also a basic study for research and for the entire
populace and future researchers.
1.5 SCOPE OF THE STUDY
This study covered the substantive solution to the problems
generated by the existing system used in the school administration and
management. However, the case study is post-primary school management board
(PPSMB) Enugu.
1.6 METHODOLOGY
On account of time, she adopted only 2 procedures of
capturing data for the study. Those 2 procedures encompass.
1. A) INTERVIEW METHOD:-
During the interview conducted in the post-primary school management board. The
research interviewed the director of school supervisor on the nature of duty conducted
in schools she had supervised with special reference to the examination
coordination and supervision, enrolment ratio for the admission of students in
school. The director of administration department was equally interrogated
based on the obligation and dereliction of the management board towards the
growth of education observed in schools with little assistance from some of the
staffs. The response to the questions enabled the researcher to take off.
B) REFERENCES TO WRITTEN DOCUMENT: – In spite of the interview took place
in the PPSMB, the researcher extended her collection of data to the written
document as a result of inadequacy from the responsiveness of the interview.
The researcher had to visit Enugu State and National Library for more information
and references from already written text on educational administration varying
more emphasis on school administration and management. The information from
this specified method made the successful completion of this study possible.
No comments:
Post a Comment