DESIGN AND IMPLEMENTATION OF A
COMPUTERISED TRAFFIC OFFENCE DOCUMENTATION SYSTEM.
(CASE STUDY OF FEDERAL ROAD SAFETY
COMMISSIONER, ENUGU)
ABSTRACT
This
project was centered on traffic offence documentation system. The current
process of traffic offence documentation is being operated manually and due to
this procedure numerous problem are been encountered. A design was taken to
computerized the manual process in order to check this problem. The problems
were identified after series of interviews and examination of documents after
which analysis was made and a computerized procedure recommended. This project
will also suggest how to successfully implement the computerized procedure and
to overcome the obstacle that would hinder the successful implementation of the
system. The new system was designed using visual basic 6.0 and Microsoft access
database. This language was chosen because of its easy syntax and features for
developing windows based applications.
CHAPTER ONE
INTRODUCTION
1.1 BACKGROUND OF THE STUDY
Around
the world road traffic injuries are a major public health challenges that
requires concerted efforts for effective and sustained prevention. An estimated
1.2 million people are killed in road crashes every year and many as 50 million
supper injuries. The world health organization believe that these figures could
increase by more them half over the next 20year unless there is a firm
commitment to road safety and accident prevention, especially in Nigeria, most
adult will know of someone who has been killed or injured in a road traffic
accidents. It is a dad fact that many of these accidents and their consequences
will have been avoidable.
Therefore
this project, computerized traffic offence documentation system will help to
keep records of all traffic offences committed by road users and also maintain
the databases of the commission (F R S C).
1.2 STATEMENT OF THE PROBLEM
The
present system of traffic offence documentation system has a lot of problems
which are mentioned below:
TIME:
– going by the present system of operation, time is consumed in the manual
handling of operation involves in road traffic documentation.
COST:
– this is the greatest problem of the federal Road safety commission. The
commission ends t o loose a lot of money running the agency manually.
DOCUMENT
INSGRITY: This is
viewed in the contest of the safety, in the contest of the safety, in validity
of the records in the document files used in the report generation. In term of
safety, the native of the system makes it vulnerable to left, fire or
accidental distruction. This makes the system in safe as the time needed to
replace lost data or files is enormously large.
1.3 PURPOSE OF THE
STUDY
This
study is designed to help federal Read safety commission to document all road
traffic offences incurred by the road users.
This
study also tries to give an in-depth looking in the easiest and most effective
way for the growth and development of the federal Road safety commission of
Nigerian in order to control and render its activities to the Nigerian and
other coteries.
1.4 OBJECTIVES OF THE STUDY
The
objectives are as follows:
1. To provide better services to the
public and users.
2. To keep records that are compact,
integrated and up dated
3. To produce a system where
information and output report will be produced or made available much faster
more accurately and more detailed to the commission and the public (Road
users).
1.5 SCOPE OF THE STUDY
This
study is strived at finagling out how effective the computerization of Nigerian
Road safety commission will improve the operation of the commission.
However,
the research project is limited to traffic offence documentation section.
1.6 DEFINITION OF TERMS
1. INFORMATION-this is the assemblage
of data into a meaningful form.
2. F R S C
3. Computerization
4. ROAD USER
5. DATA
FRSC:
Federal Road safety commission a body responsible for the control of Road users
in the country Nigeria.
Road user: person or persons making use or applying on the road.
Data-
it is unprocessed information.
Computerization: – refers to the application of computer in performing
operations or man’s problem like on mechanical a counting.
No comments:
Post a Comment