DESIGN AND IMPLEMENTATION OF A COMPUTERIZED GOODS TRANSPORTATION SYSTEM
ABSTRACT
This project is to address the problems encountered by the
staff of custom and their customers. In view of this problems, the manual
process involved in the handling and management of goods in custom office were
critically studied and the problems noted. This project went further to treat
the different techniques used in implementing the newly designed software. This
work is conducted towards the computerization of the existing system of
processing data in order to identify some various problems that is being
encountered in mechanical aspect of it and the manual method of data processing
in the billing of imported and exported customer goods and thereby recommending
first class solution to the problem of information system in the organization. This
theory also compares the existing system with the new system which is exact and
a faster way of processing data and the problem that is faced by customers when
they are clearing their goods from the wharf. This theory includes with the
implementation, programming, test run, change over the process of the new
system. The software is designed using visual basic 6.0 language. This language
was chosen as a result of its easy syntax and structure for developing
windows-based applications.
CHAPTER ONE
1.0 INTRODUCTION
Computer plays a vital role is the development of any
company, it also solves some of its complex problem faced by man and processed
voluminous data within a short period of time or at a fantastic speed. Recent
emphasis on information and data processing in most of our business and
shipping industries has grown vastly as in the case of super manifest shipping
company Lagos that an alternative method has to be mechanical handling of data,
preparing of freight, manifest etc.
Super maritime shipping company is a company which handle the
clearing and forwarding of goods, importation of goods and undertakes the
clearing of shipping documents and goods within the vessel leaves, the port for
a designated ware house as the clients of the company wishes computer
technology has come to be accepted as an indispensable innovation in shipping
system. It is an all purpose machine that accepts data as input and process it
using a set of information given out result as output which can be retrieved
for future use. And its revolution has been evident in shipping in order to
eliminate most hardship encountered in most of air shipping industries, the
need for the computerization with the design and implementation of a
computerized goods transportation management information system and its
advantage to the shipping industries in needed.
1.1 BACKGROUND OF THE STUDY
The study is based on design and implementation of a
computerized goods transportation management information system. The study
helps one to understand the origin of goods transportation and of the same time
some loop holes occurs in the management of goods and its solutions.
1.2 AIMS AND OBJECTIVES
The aims and objectives of this study is to develop and
implement a computerized goods transportation management information system
that will make provision of the following to ensure a fast and more efficient
services to the customer based on quick access of data and accurate
information. The branch of all routine work which does not demand quantitative
consideration to enable then provide letter counter services.
To be receivable and capable of providing an to
date information relevant to company and their clients.
To affect a simpler handling of bill leading and updating of
customers manifest checking of fraud and other criminal acts which lead to
security and control.
1.3 STATEMENT OF THE PROBLEM
The management of goods/goods in Nigeria has over the years
attracted poor patronage as a result of errors that loss of customers goods is
now the order of the day, the reason are not for fetched due to the manual
procedure involved, chat have no other option than to be at the mercy of this
error prime procedures and the storage of information such as files and other
important documents can easily be last hereby attracting distrust of the firm
by its client/customer as a result of eagerness would prefer their goods to be
cleared on time but since there are so many activities involved there will be
delay in processing and this does not portray the image of the company in a
good way.
1.4 PURPOSE OF THE STUDY
The existing system of custom and exercise office has
exhibited some loop holes and it is against this loop holes that this work was
carried out, the study is also undertaken to produce a system which will
address the loophole and co-operate need of the customs at the smallest
possible cost and within the limit of technology available which was the
driving force of this project.
1.5 JUSTIFICATION
With the computerization of the shipping company, this
bitting system will be sufficient and reliable, the establishment of the new
system will create for a faster and efficient means if transacting business
between the shipping company and their customers, there will be a networked and
direct of communication between shipping companies both in and outside the
country process like billing daily report generation customer registration will
be for formed with speed, efficiently existing loots incurred. The information
pertaining to the customer and his goods will be secured as they are contained
in the computer and there will be case to store and retrieve information to and
fro from the computer.
1.6 SCOPE OF THE STUDY
This study is restricted to the full operations of custom and
office department.
1.7 DEFINITION OF TERMS
GOOD- Goods carried in a ship
TONNAGE- A measure of the capacity of a ship (1 ton = 100 cubic feet)
PORT- A place where ship load and unload goods shattered form
storms.
VESSEL- A ship for transport by water
BILL OF LOADING- A list giving details of a ships
goods
CONSIGNCE- A person or company to whom goods are sent form the counting
of export and who receives them.
MANIFEST- A list of all goods on the ship
WHARF- This is a landing stage built along the shares for loading
or unloading vessels.
LABOUR- An area of water protected from the open sea by land or
walls in which ships can shelter.
BERTH- This is a place in the wharf where a ship can be died up or
swing at anchor.
PORT OF LOADING- A place where ships load goods and
leave for the definition.
PORT OF DISCHARGE- A place where unload goods from poof
of loading.
OCEAN FREIGHT- This is an amount charged by the carrier by the
carrier for transportation of goods by sea.
VOYAGE- A journey by water mostly a long one in a ship.
SHIPPING- This is the process of pulling things on in a ship or
transportation goods by ship
WAREHOUSE- This is a store house
TRASNPORT- This is carriage of goods from one place to another
SAILING- This is the movement of ship on a sea from one place to
another
CUSTOM- This are the people that are in charge of checking the
vessel if it contains any contraband items and the paper that contains the
particulars of the container in the vessels.
ROTATION NUMBER- A number allocated by the department
of customs and exercise to every ship entering into future use.
COMPUTER- This is an electronic machine that accepts data as input,
process it using a set of instructions and given out result as output. It also
stores information which could be received for future use.
DATA- This are raw fact that have not been processed.
DISK- It is a storage device that stores data or information.
1.8 LIMITATION
During the process of carrying out the study encountered many
problems.
Firstly, it was difficult in a way to get to the staff of
different section of the company to talk about the present state of
computerized office processing system. Due to the fact of that it were thought
to be complicated. I took a lot of strenuous time to make sure that it obtain
first hand information to make this study a very successful one and also
variable.
However,
in spite of all these limitations, the study has been able to a large extent
achieved the best out of the limited resources.
1.9 DELIMITATION
This research work ended how the problem of accessing bulky
data by the workers can be turned to computer responsibility thereby making
power easy end fast. The work focused on the custom and exercise office that
choose to be the case study here the data I collected are based on the
secondary data of custom and exercise office processing system. I also strongly
believe that the fact and observation I got from the customs are well reliable
for the study to be a very successful one.
No comments:
Post a Comment