DESIGN
AND IMPLEMENTATION OF A COMPUTERIZED HOTEL BUSINESS BILLING SYSTEM.
(A
CASE STUDY OF MODOTEL HOTEL LIMITED ENUGU)
ABSTRACT
This work is carried out to identify and discuss the need
for a computer system in hotel business billing system. A hotel business is a
hospitality industry which caters for both leisure and well being of its guest.
The duties of hotels are to offer accommodation to their guest and to render
services to them. These services are usually personal. The focus on this topic
is to introduce computer in the allocation of rooms and billing system of a
hotel. The current process of billing is being operated manually and due to
this procedure numerous problem are been encountered. A design was taken to
computerized the manual process in order to check this problem. The problems
were identified after series of interviews and examination of documents after
which analysis was made and a computerized procedure recommended. This project
will also suggest how to successfully implement the computerized procedure and
to overcome the obstacle that would hinder the successful implementation of the
system. The new system was designed using Microsoft visual basic 6.0
programming language. This language was chosen because of its easy syntax and
features for developing windows based applications.
CHAPTER
ONE
1.0 INTRODUCTION
Hotel is defined by British law as a place where a bonafide
traveller can receive food and shelter, provided he is in a position to pay and
is in a fit condition to be received. Hence, a hotel provides food and
beverages, and lodging to travellers on payment. In turn, it has the right to
refuse a traveller is drunk, disorderly, unkempt or is not in a position to pay
for the services.
The hotel industry is perhaps, one of the oldest commercial
endeavors in the world. The first inns date back to the sixth century be and
were the products of the urge to travel, spurred by the invention of the wheel.
The earliest hotels were managed by husband and wife teams,
who provided large halls for travelers to make their own bed and sleep on the
floor. The entire cooking service and recreation were provided by the husband
and wife team and his family.
It was in Europe that the birth of well managed hotel
industry took place on the shape of chalets and small hotels which provided
variety of services. They were mainly patronized by the aristocracy of the day.
The real growth of the modern hotel industry took place in
the United State of America in 1794. the real boom in hotel building came in
the early twentieth century. This period also saw the beginning of chain
operation under the guidance of E.M stalker. It involved big investments, big
profit and trained professional to manage the business.
The management business billing of a hotel system was
virtually left in the hands of the front officers. The front office in hotels
is the department responsible for the scale of hotel rooms through systematic
method of reservation, followed by registration and assigning of rooms to
customers, it was usually done manually. This was boring and cumbersome in
hotels that still operate manually today. This development in hotel business
billing system continued gradually until recently when computer was invented as
an electronic method of processing data, computer can be defined as an
electronic device that accept input, manipulated data and produces information
which is the output, as required. Computerization of hotel business billing
system: a focus on the lodging system of a hotel, therefore, the application of
computer in the lodging system of a hotel. A hotel which operated a
computerized system will ensure that the program carries provision for
different tariffs, locations and individual guest preferences. Details of each
room are stored within the memory and as a guest registers the guest list is
immediately updated while that particular room is removed from the list of
those which are available for letting. Because the system is so accurate, there
is little chance of two people being given same room.
1.1 BACKGROUND OF THE STUDY
The lodging system of Mooted Hotels Limited Enugu started
when this hotel was established in 1986. at its inception, Mooted Hotels
Limited inherited three modern hotels. There were ninety three chalets at the
time of its establishment. These hotels were located at Enugu, IMO, Anambra.
However they have since been improved upon with additional chalets, better
management and better services.
The management of Muddle Hotels Limited insists that
standard obtainable in its hotels of all types compare favorably with the
standards elsewhere. Each chalets is provided with a room stewards, hot and
cold water tub, wall-To-wall carpet, air conditioner, television, refrigerator
and inter-com. The Cable News Network (CNN) is received in the hotels through
its satellite dish. The body managing the hotel now at the apex of the
management include-
1. The general manager
2. The company accountant
3. The company secretary
4. The operational managers
5. The public relations officer
6. The house keeper
7. The food and beverages manager
8. The number of staff are eighty
These are both junior and senior cadres.
1. Administration
2. Accounts
3. Restraurant
4. Bar
5. Kitchen
6. Laundry.
1.2 STATEMENT OF THE PROBLEM.
The introduction of computer in the hotel is to reduce
problem encountered on arrival and event at check out time by guest’s customers
and visitors to the hotel and by the reception staff on their efforts to
manually attend to each guest’s requests going through the reception routine in
the front office by the guest is normally frustrating and time wasting. As
guest can be kept on his feet for several minutes waiting to be attended to
.the billing procedures in the cashier section are similar to that of the front
office. The staff at the cashier section is also limited by their human
capabilities.
1.3 PURPOSE OF STUDY
The main aim of this study is design a computerized
reservation entry and guest billing system for timely services. In hotel
services, time is of essence.
Another objective of is to design a computerized system
which will ensure that the program carries provisions for different tariffs,
locations and individual guest preferences. The computer will select the best
available rooms for particular reservation or offer an alternative, if the
preferred room is already taken or is not yet ready. The program will be
flexible enough to ensure that any special request by a guest can be catered
for.
1.4 SCOPE AND LIMITATIONS OF THE
STUDY
The computerization of the hotel business billing system is
centered on the front office. (i.e. reception and cashier section) of the
Modotel hotel limited. A lot of limitations were encounter during this study.
Such limitations are:
1. Finance: this hindered my movement
in the process of gathering of facts.
2. Time: this is another constraint to
my undertaking a more comprehensive fact finding, since the period for this
study was very small compared to the actual work.
3. Lack of textbooks: this is also
another major constraint in the course of carrying out this work. One had to
move one library to another.
4. Protocols: I encountered series of
protocols, often called red tapism before I was granted interviews.
1.5 IMPORTANCE OF THE STUDY
There is a high hope that this project will solve those
problems the reception personnel encounter on the sale of rooms in the hotel. A
hotel which is computerized can, with dispatch, answer inquires and write
confirmation letters for reservation, keep messages for guest’s, advice the
hotel management about regular guests, improve the level of services the hotel
offers to guest and monitor room services to guests. It will greatly help the
reception personnel to know the number of room available and how many rooms
that have been booked. This helps in updating of reservations. In a situation
of efficient services, the hotel will be attractive to guest and visitors and
thereby make profit.
1.6 DEFINITIONS OF PROCESSING
REAL TIME PROCESSING: Technique by which enter data for
immediate processing.
ON LINE PROCESSING: Also called transaction processing,.
It is the collecting and processing of data as transaction occurs.
INFORMATION: When data undergoes certain
manipulations like calculation, sorting, amending etc. they eventually become
useful meaningful. In other words, they become information.
DATA:
Bit and pieces of fact and figures representing an idea or event needed for
processing to give out information.
FIED:
A unit of information containing a group of related data.
ARRIVAL:
Time that a guest registers into the hotels.
ACCOMMODATION: The term simply refers to rooms.
BOOKING:
Reservation of rooms.
CANCELLATION: When a room reservation is with drawn by the
guest.
CHECK-IN: Arrival of a guest who has registered at
the reception.
CHECK-OUT: Department of a guest who has settled his bills.
DEPARTURE: Time when a guest leaves the hotel.
DOUBLE ROOM: Room with one large- size bed.
GUEST:
Person who uses the services of a hotel.
RECEPTION: Counter in a hotel that registers guests.
RESERVATION: Counter that receives documents on
reservation requests.
SKIPPER:
A guest who departs without paying his bill.
SINGLE ROOM: Room with one bed.
No comments:
Post a Comment