DESIGN AND CONSTRUCTION OF AUTOMATIC WATER LEVEL CONTROLLER FOR BOTH OVERHEAD AND UNDERGROUND TANKS
ABSTRACT
Automatic water level controller for
both overhead and underground tank is designed to monitor the level of
water in a tank. It displays the level of water and when it is at the
lowest level; a pump is activated automatically to refill the tank. When
the tank is filled to its maximum capacity, the pump is automatically
de-energized. Several circuits are put together to ensure proper working
of this design, and the block diagram includes the supply unit, the
micro-processor unit, the sensor unit, the display unit and the pump
drives unit. The power unit is responsible for turning on the entire
circuit. Some components are used to set up power unit and they include;
a 15v step down transformer, a bridge rectifier circuit, a smoothening
capacitor and a voltage regulator IC. The microprocessor (AT89S50)
controls virtually all the actions carried out in this design. (AT89S50)
is used in the design. The sensor unit is responsible for sensing the
level of water and transfer the current position of water to the
microprocessor. The display unit in the circuit is use to physically
show the current position of water in the tank, the properties of seven
segment display are been used.
CHAPTER ONE
INTRODUCTION
INTRODUCTION
1.0 BACKGROUND OF THE STUDY
The project “automatic water level
control with an automatic pump control system” is design to monitor the
level of liquid in the tank. The system has an automatic pumping system
attached to it so as to refill the tank once the liquid gets to the
lower threshold, while offing the pump once the liquid gets to the
higher threshold. Sustainability of available water resource in many
reason of the word is now a dominant issue. This problem is quietly
related to poor water allocation, inefficient use, and lack of adequate
and integrated water management. Water is commonly used for agriculture,
industry, and domestic consumption. Therefore, efficient use and water
monitoring are potential constraint for home or office water management
system. Moreover, the common method of level control for home appliance
is simply to start the feed pump at a low level and allow it to run
until a higher water level is reached in the water tank.
This water level control, controls
monitor and maintain the water level in the overhead tank and ensures
the continuous flow of water round the clock without the stress of going
to switch the pump ON or OFF thereby saving time, energy, water, and
prevent the pump from overworking Besides this, liquid level control
systems are widely used for monitoring of liquid levels in reservoirs,
silos. Proper monitoring is needed to ensure water sustainability is
actually being reached with disbursement linked to sensing and
automation, such programmatic approach entails microcontroller based
automated water level sensing and controlling or using 555 timer IC.
1.1 AIMS AND OBJECTIVES
The goal or objectives of which the
designed device is expected to accomplish is to build an automatic water
level control with automatic control system. In this project sensors
are place at different level of the tank and with the aid of this
sensors, the micro-controller monitor the level of the liquid at any
particular point in time, some of the objectives are
1. to design an automatic water monitoring system
2. to incorporate an interactive medium between the end user and the machine
3. to prevent over labor of the pumping machine and prevent it from getting bad
4. to avoid wastage of water
5. since the demand of electricity is very high, automatic water level control saves energy
1. to design an automatic water monitoring system
2. to incorporate an interactive medium between the end user and the machine
3. to prevent over labor of the pumping machine and prevent it from getting bad
4. to avoid wastage of water
5. since the demand of electricity is very high, automatic water level control saves energy
1.2 JUSTIFICATION OF THE STUDY
Automatic water level monitor came into existence because of human error and inconsistence that is associated with manually operated water pumping machine. This is because it takes time for individual who is manually operating the water pump to turn off the pumping machine and this may cause water spillage and at times the individual might not know that the water level has drop so low until the tank is completely empty. This was the problem that leads to the development of the ideal of an automatic water level control and automatic pump short down.
Automatic water level monitor came into existence because of human error and inconsistence that is associated with manually operated water pumping machine. This is because it takes time for individual who is manually operating the water pump to turn off the pumping machine and this may cause water spillage and at times the individual might not know that the water level has drop so low until the tank is completely empty. This was the problem that leads to the development of the ideal of an automatic water level control and automatic pump short down.
1.3 SCOPE OF THE PROJECT
The project was design to automatically
control the pump which ensures constant reserve of water in the
reservoir. The scope of the design was keep concise and simple to in
other not to introduce unnecessary complexities and render it generally
uncomfortable. The system does not have attached complex peripheral
device which though impossible for the detail printable information has
been excluded for reasons of affordability material of low range and
less accurate performances as opposed to a well built automatic water
pump was use d to achieve this aim, the automatic water level controller
detect and control the water in the tank
1.4 CONSTRAINS
The biggest setback experience during the course of this project is difficulties in finding the design of the project, secondly sourcing of material and component I used for the project were difficult to find like pump and buffer for programming
The biggest setback experience during the course of this project is difficulties in finding the design of the project, secondly sourcing of material and component I used for the project were difficult to find like pump and buffer for programming
1.5 LIMITATIONS OF THE PROJECT
It is significant to know that this design is limited to 12v, 5amps electric pump and cannot be use to control industrial water pump above 5 amps
It is significant to know that this design is limited to 12v, 5amps electric pump and cannot be use to control industrial water pump above 5 amps
BLOCK DIAGRAM OVERVIEW
This project report writing is written is design in such a way that each chapter is related to the next as shown below
This project report writing is written is design in such a way that each chapter is related to the next as shown below
1.6 PROJECT RESPORT ORGANISATION
The organization of this project report
is well detailed and vast in its coverage it covers all the activities
encountered during the research work. The first chapter of this work
took care of the introduction, aims and objective, scope, Justification
and project report organization. Chapter two highlight on literature
review chapter three highlight on description of system and some of the
component used were emphasized chapter four highlight on the system
design and implementation, construction, testing and packaging of the
pump. Chapter five is all about the conclusions problem encountered
recommendation and cost of the project.
CHAPTER TWO
2.0 LITERATURE REVIEW
An automatic water level control detects
the water level in the tank and also ensures continuous water flow
round the clock because of its automatic, this automatic water control
is made up of microcontroller written in C programming language this
program is burn into an IC called AT89S52 With 40 pins.

No comments:
Post a Comment