DESIGN AND CONSTRUCTION OF RADIO FREQUENCY GSM SIGNAL JAMMER
CHAPTER ONE: INTRODUCTION
1.1 Introduction
A wireless signal jammer is a device which blocks transmission by creating interference. This wireless signal jammer can be categorized into the Radio Frequency (RF) jammer and GSM jammer.
A wireless signal jammer is a device which blocks transmission by creating interference. This wireless signal jammer can be categorized into the Radio Frequency (RF) jammer and GSM jammer.
A Radio Frequency jammer is a device
used to disrupt or prevent communication via a broadcasted RF signal. It
is an RF and GSM frequency disrupter commonly known as wideband radio
frequency (RF) and GSM cell phone jammer. Simultaneously, they can
blocks all commercial FM broadcast band (87.5 MHz to 108 MHz) and GSM
signal transmissions within the jammer’s transmission range. The device
can possibly block these frequencies by transmitting a dirty signal
(like noise) on the same frequency at which the GSM and radio system
operates.
A Radio Frequency jammer is a device
that transmits a radio frequency signal on the same frequency at which
the radio system operates and the jamming succeeds when the radio sets
in the area where the jammer is located are disabled.
A GSM jammer is a device that transmits a
signal on the same frequency at which the GSM operates. The jamming
succeeds when the mobile phones in the area where the jammer is located
are disabled.
In recent times, where bombs are being
planted and detonated by GSM or Radio Frequency signals, this device can
be at an advantage by jamming the signals required for the detonation
of the bomb.
Presently, the mobile jammer devices are
becoming civilian products rather than electronic warfare devices,
since with the increasing number of the mobile phone users the need to
disable mobile phones in specific places where the ringing of cell phone
would be disruptive has increased. These places include worship places,
university lecture rooms, libraries, concert halls, meeting rooms, and
other places where silence is appreciated.
The solution to these annoying and
disrupting noises is to install a device which can block the signal
transmission from mobile phones and radio sets and thus, disrupt the
triggering of bombs by these wireless signals.
1.2 Project Background
The technology being used by this device is very simple. The mobile phone transmission is being blocked and interfered by RF which creates high noise. The frequency being generated by the jamming device jams the signal being generated by the cell tower (as illustrated in figure 1.1 below). When the signal has been blocked, the mobile phone will show “NO NETWORK” on the network bar, and radio devices will not be able to tune into any signal. Thus, all phones and radio devices in the 200m radius of the jammer will be having the same situation.
The technology being used by this device is very simple. The mobile phone transmission is being blocked and interfered by RF which creates high noise. The frequency being generated by the jamming device jams the signal being generated by the cell tower (as illustrated in figure 1.1 below). When the signal has been blocked, the mobile phone will show “NO NETWORK” on the network bar, and radio devices will not be able to tune into any signal. Thus, all phones and radio devices in the 200m radius of the jammer will be having the same situation.
Radio Frequency (RF) and Mobile signal
jammer is an illegal device in many countries. It is because the device
is blocking the signal which has been approved by government agency as a
legal communication transmission system. According to the National
Communications Commission (NCC) in Nigeria, “The manufacture,
importation, sale, or offer for sale, of devices designed to block or
jam wireless transmission is prohibited”.
The reason I am developing this device
is for educational purpose only. This device was developed and tested in
this report just for Final Year Project presentation. There is no
intention of manufacturing or selling such device in Nigeria or
elsewhere.
In the construction of this wireless
signal jammer, the device will be able to jam GSM and Radio Frequency
(RF) signals and this can be done alternatively through a switch.
As shown in Fig. 1.1 below, the wireless signal jammer is divided into two major branches: the GSM signal jammer, and the radio receiver jammer. The radio receiver jammer is also sub-divided into the Amplitude Modulated (AM) signal jammer and the Frequency Modulated (FM) Signal jammer. The Cell phones and Radio receivers cannot be blocked simultaneously as they operate at separate frequencies. The frequency can then be varied using a frequency tuner mounted on the jammer.
The block diagram in Fig. 1.2 below gives a pictorial representation of the working principle of a wireless signal jammer

The cell tower 1, 2, 3 and 4 transmits
signals which can be received by GSM or radio sets. The jamming device
is placed in-between cell towers 1 and 2 and thus produces a signal
which is at the same frequency being operated /transmitted by the cell
tower. It can be said that the resultant of the signals is zero.
From Fig. 1.2, the sending object is the jamming device and the target object is the cell towers.
However, mobile phones placed within the
range of cell towers 3 and 4 will not be jammed due to the fact that
they are not within the range of the jamming device.
1.3 Problem Statement
Due to the increasing sophistication and
high technology, most people are using mobile phones, and also due to
the need for man to stay updated with his environment, the use of radio
is also in wide use.
Mobile phones have become a very important communication tool today. With the use of the mobile phones everywhere, it becomes annoying device while working, studying, praying and many more.
Modern technology has contributed to the sophistication of bombs which are being triggered by GSM and Radio signals.
Wireless mobile jammer can be placed in
schools, mosque, and conference hall, meeting rooms, library and many
more places which need quiet and peaceful environment. This device will
block the transmission of Radio and GSM signals.
1.4 Objectives
The Development of Wireless Signal Jammer for Security Application objective is:
- To design Radio Frequency (RF), Intermediate Frequency (IF), and Power Supply circuit.
- To construct the Development of Wireless Signal Jammer for Security Application’s circuit.
- To construct the development of wireless signal jammer for security application’s circuit.
- To simulate Intermediate Frequency (IF) section circuit.
- To block mobile phones transmission by creating interference.
- To block amplitude modulated and frequency modulated signal transmission by creating interference within its range.
This project only focuses on blocking
the signal transmission of GSM900 which is the range between 935 to 960
MHz. This is because the components are hard to find in Nigeria for the
GSM1800 frequency range between 1805 to 1880 MHz The components for
GSM1800 are also very expensive compared to GSM900.
The second limitations of the project
are, the device only can block the three main operators which are
ETISALAT, MTN and GLOBACOM. This is because, the lines are only for
Nigerian users and the frequency band range is between 935 to 960 MHz.
These requirements fulfil the GSM900 specifications.
The third limitation is that for reliability of the jammer, a Radio Frequency amplifier should be incorporated but the components required for this are difficult to find in Nigeria.
The third limitation is that for reliability of the jammer, a Radio Frequency amplifier should be incorporated but the components required for this are difficult to find in Nigeria.
This project is mainly intended to
prevent the usage of mobile phones in places inside it coverage without
interfering with communication channels outside it range, thus providing
a cheap and reliable method for blocking mobile communication in the
required restricted area only. Although we must be aware of the fact
that nowadays lot of mobile phones can easily negotiate the jammer
effect are available and therefore advance measures should be taken to
jam such type of devices. The main disadvantage of the mobile phone
jammer is that the transmission of the jamming signal is prohibited by
law in many countries. These disadvantages will restrict the use of
Radio Frequency jammer. [10]
CHAPTER TWO
LITERATURE REVIEW
2.1 Introduction
This chapter will discuss more about all
of the information related to the project. It discusses about the
previous history and the present work about my project. The literature
review in this paper is based on Internet, journal, books, and articles.
2.2 History of RF/ GSM jammer
Communication jamming devices were first
developed and used by military. This interest comes from the
fundamental area of denying the successful transport of the information
from the sender to the receiver. Nowadays the mobile jammer devices are
becoming civilian products rather than electronic warfare devices, since
with the increasing number of the mobile phone users the need to
disable mobile phones in specific places where the ringing of cell phone
would be disruptive has increased. These places include worship places,
university lecture rooms, libraries, concert halls, meeting rooms, and
other places where silence is appreciated.

No comments:
Post a Comment