DESIGN AND CONSTRUCTION OF A THREE WAY JUNCTION TRAFFIC LIGHT CONTROLLER
ABSTRACT
T-junction traffic light controller is
such a device that will play a significant role in controlling traffic
at junctions, to ease the expected increased rush at such junctions and
reduce to minimum disorderliness that may arise, as well as allowing the
pedestrians a right of the way at intervals rather than being struck
down when in a hurry to cross the roads. Such an electrical system with a
touch of electronics that control the flow of traffic in a
pre-determined sequential pattern at a junction, has its diagram
comprising of different components. The power supply unit provides the
control unit with specified voltage from primary source. The pulse
generator consisting of a timer generates pulse for the system. The
clock or counter moderates the signal that enters the decoding logic
system. The display unit of each stand consists of led, the first is red
in colour, the second is amber in colour and the last is green in
colour.
CHAPTER ONE
INTRODUCTION
INTRODUCTION
1.1 BACKGROUND OF THE STUDY
The traffic on our roads, especially
intra-city traffic due to increasing number of cars grow by the day and
unless adequate steps are taken to control the situation, we shall soon
meet with circumstances we do not bargain for. That the innumerable
traffic junctions in the country by far out-number the staff strength of
the traffic wardens available and that the traffic wardens even where
they are enough to control all the junctions cannot do so throughout the
day is not in doubt. Traffic control at T.junctions or elsewhere
ensures orderliness of movements of vehicles, goods and pedestrians
while its absence strongly indicates chaos and most at times leads to
accidents.
In the light of the above, it is
imperative to recognize the need to compliment the physical exhausting
efforts of the traffic wardens. In doing so, steps to be taken should
assume permanence in nature rather than any ad-hoc exercise. Such is the
role expected to be played by an installed operational road junction
traffic controller.
This project –DESIGN AND CONSTRUCTION OF
A THREE WAY JUNCTION TRAFFIC LIGHT CONTROLLER is such a device that
will play significant role in controlling traffic at junctions to ease
the expected increased rush at such junctions and reduce to minimum such
disorderliness that may arise as well as allowing the pedestrians a
right of the way at intervals rather than being struck down when in a
hurry to cross the roads.
Such an electrical system with a touch
of electronics that controls the flow of traffic in a pre-determine
sequential pattern at a junction has its diagram below with blocks
representing distinct units.
The power supply unit provides the control unit with specified dc voltage from primary source, which is a 240v, 50Hz ac supply, from public power system. The pulse generator containing a timer generates pulse for the system. The clock or counter moderates the signal that enters the decoding logic system.
The display unit of each stand consists of three bulbs Red in colour showing STOP, three bulbs Amber in colour showing GET READY and three bulbs Green in colour showing MOVE.
1.2 OBJECTIVE OF THE PROJECT
The main objective of the study includes:
- To investigate the practicality of the theoretical knowledge about these components to be used.
- To experiment on the compatibility of the working relation between components to be used.
- To investigate the extent to which the design and construction of the control unit can be useful to mankind.
- To investigate the immediate usefulness of the control system as complimentary to traffic wardens.
1.3 SCOPE OF THE STUDY
The scope of this project is to
enlighten all electronics students on the use of microcontroller base
traffic light (3-ways) and timer system in T-junction. On the practical
usage it is limited to the laboratory used for reference purpose. The
larger application of this project work is found in most of our mega
cities like Abuja, Lagos, Calabar, Enugu etc, to control and manage
heavy traffic congestion.
1.4 PROJECT REPORT ORGANIZATION
This report is structured to follow the
history and origin of traffic light system all through the design and
implementation phase. The report takes into account the step-by-step
process followed in order to arrive at the final design.
Chapter one of this report introduces
the concept of the Traffic light system and its objectives. Chapter two
centers on the literature review, the origin and history of Traffic
light systems and its basic functionality. Chapter Three explains the
components which make up the Traffic light system and their basic
functionalities/mode of operation. Chapter Four discusses the design
procedure, construction, steps and packaging. Chapter five handles the
tests and results as well as conclusion and recommendation.
CHAPTER TWO
LITERATURE REVIEW
LITERATURE REVIEW
2.1 INTRODUCTION
The tremendously increased number of vehicles on our roads and the overwhelming army of pedestrians on road sideways call for great concern. The numerous avoidable accidents at junctions be it T-junction, 4-way junction is acknowledged not only by Government but also by the people themselves. The services of our traffic wardens as well as that of the policemen no longer contain adequately the situation more so when they cannot carry out a twenty-four hour duty.
The tremendously increased number of vehicles on our roads and the overwhelming army of pedestrians on road sideways call for great concern. The numerous avoidable accidents at junctions be it T-junction, 4-way junction is acknowledged not only by Government but also by the people themselves. The services of our traffic wardens as well as that of the policemen no longer contain adequately the situation more so when they cannot carry out a twenty-four hour duty.

No comments:
Post a Comment