THE EFFECT OF ETHANOL EXTRACT OF DESMODIUM VELUTINUM STEM ON SOME MARKER EMZYME IN LIVER OF ALBINO WISTAR RATS
Abstract
Present investigations were carried out
on the effect of ethanol extract of Desmodium velutinum stem on some
liver enzymes of albino wistar rats fed with high fat from cow‟s brain.
Twelve healthy albino wistar rats were divided into four groups. Group I
rats were fed with balanced diet (normal feed, that is grower‟s mash)
and tap water. Group II rats were fed with fat diet (cow‟s brain)
(3.6g/day) alone. Group III rats received combined mixture of 70% fat
diet (cow‟s brain) with 30% ethanol extract of Desmoduim elutinum stem
(2.7g/day), Group IV rats were fed with fat diet (cow‟s brain) and were
administered with a drug atorvastatin (5mg/rat/day). The rats were
sacrificed at the end of the experimental (two weeks) period. The plant
extract was screened for its phytochemical constituents, using standard
procedures. Phytochemical screening revealed the presence of tannins,
flavonoids, saponins and alkaloids. The liver function tests was
assessed by measuring the total bilirubin, total serum protein, direct
and indirect bilirubin and liver enzymes such as Alanine amino
transferase (ALT), Aspartate amino transferase (AST), Alkaline phosphate
(ALP), Gamma-glutamyl transferase (GGT) on the liver of the albino
wistar rat. The serum, ALT, ALP, AST and bilirubin concentration of the
albino wistar rat increased significantly (P>0.05) compared to their
total protein concentration. The result obtained indicate that the
ethanol extract of Desmodium Velutinum stem possess hepatoprotective
activity on the fatty liver of albino wistar rat fed with fat from cow‟s
brain. The studied plant showed variable amount of phytochemicals
including flavonoid, alkaloid, saponin, tannins, terpenoid which were
determined quantitatively using literature methods. The significant
effect of the Desmodium velutinum stem ethanol extract was compared with
standard drug, atorvastatin. The result in the present study suggest
that the ethanol extract of Desmodium velutinum stem can be used in
treating liver diseases.
CHAPTER ONE
1.0 INTRODUCTION
The liver is the largest and most
complex internal organ in the body. It plays an important role in the
maintenance of internal environment through its multiple and diverse
functions. Liver is involved in several vital functions such as
metabolism, secretion and storage. Hepatitis or inflammatory disorder
involves inflammation and change to the hepatocytes. Hepatitis is one of
the most prevalent diseases in the world. Every year 18,000 people had
been reported to die due to liver cirrhosis caused by viral hepatitis
(Wang et al., 2008). Ectopic fat storage occurs in obesity, particularly
in the liver leading to a condition termed non alcoholic fatty liver
disease (NAFLD) characterized by varying degree of liver injury that
progresses from steatosis to tratohepatitis, fibrosis and necrosis. Due
to its prominent association with insulin resistance/obesity, NAFLD is
regarded as the hepatic manifestation of metabolic syndrome. Liver has
great capacity to detoxicate toxic substance and synthesizes useful
principles. Therefore damage to liver inflicted by hepatotoxic agents is
of grave consequences. Experimental studies have reported that animal
fed a high fat diet (HFD) for more than two months develop weight,
hyperlipidemic, hyperglycemia, oxidative stress and insulin resistance
(IR). Besides, consumption of a calorie-rich diet results in lipid
accumulation, excess production of inflammatory cytokines and macrophage
infiltration that favours the progression of liver disease. Many
medicinal plant/indigenous plant have been mentioned and well
established as hepatoprotective agents.
Desmodium velutinum is a medicinal plant
around the world. The extract of Desmodium velutinum showed significant
anti-pyretic activity on experimental rats used. Desmodium velutinum is
very rich in alkaloids and related amino compounds. It is a source of
flavonoid, saponins and pharmacological active agent useful in the
treatment of aches and pains. It also showed that one of the uses is for
erectile enhancing property. Desmodium velutinum being one of the
important medicinal plant in the world may have effect on the liver.
However limited studies are available on the effect of Desmodium
velutinum treatment on hepatoprotective effect of its extract on high
fat diet fed animal. In this regard, the present study was aimed to
investigate the effect of ethanol extract of Desmodium velutinum stem on
liver function tests on albino wistar rats fed with high fat from cow‟s
brain related to different hepatoprotective effect by comparing it to a
known drug, atorvastatin treatment which is used to lower the level of
cholesterol in blood. Since changes in the concentration and composition
of plasma lipid and lipoproteins occur frequently in liver disease,
these findings may be useful in following the clinical course of patient
with liver diseases of various causes.
Liver disease is associated with
characteristic changes in the lipid composition of the surface coat of
plasma lipoprotein particles. Cholesterol accumulate as hepatic
secretion of lecithin cholesterol acyltransferase decreases, such
abnormal circulating lipoproteins tend to induce corresponding changes
in cell membrane lipid composition. Studies in both human and
experimental liver disease confirm that this does occur and that it is
wide-spread. Low density lipoproteins, which are rich in cholesterol can
also be taken up by the liver or extrahepatic tissues by a receptor
mediated endocytosis that specially recognizes apolipoproteins. It can
be predicted that extra hepatic membrane dysfunction might be a general
feature of severe liver disease. It is proposed that many of the
cellular disturbances and metabolic abnormalities accompanying hepatic
disease result from, or are exacerbated by lipoprotein induced changes
in membrane lipid composition and function. Hence Desmodium velutinum
may be a source of a pharmacological active agent useful in the
treatment of high level cholesterol in the blood which has got both
liver protecting and nutritional value.
CHAPTER TWO
2.0 LITERATURE REVIEW
The use of herbs and medicinal plants as
the first medicine is a universal phenomenon. Every culture on earth,
through written or oral traditions has relied on the vast variety of
natural medicine found in healing plants for their therapeutic
properties. All drugs of the past were substances with a particular
therapeutic action extracted from plants. This, natural plants have been
valuable sources of medicinal agent with proven potential of treating
infectious disease and with lesser side effects compared to the
synthetic drug agents. Hence potentially useful drugs can often be
recognized from their relative importance and use in folk medicine.
Desmodium velutinum has been reported in traditional medicine to have
medicinal properties Extracts of Desmodium velutinum are used
traditionally in some disease, hence may be as sources of a
pharmacological active agent in the treatment of aches and pains.
Ethanolic extract of Desmodium velutinum possess antipyretic property.
No comments:
Post a Comment