Friday, 10 November 2017

THE EFFECT OF ETHANOL EXTRACT OF DESMODIUM VELUTINUM STEM ON SOME MARKER EMZYME IN LIVER OF ALBINO WISTAR RATS

THE EFFECT OF ETHANOL EXTRACT OF DESMODIUM VELUTINUM STEM ON SOME MARKER EMZYME IN LIVER OF ALBINO WISTAR RATS

Abstract
Present investigations were carried out on the effect of ethanol extract of Desmodium velutinum stem on some liver enzymes of albino wistar rats fed with high fat from cow‟s brain. Twelve healthy albino wistar rats were divided into four groups. Group I rats were fed with balanced diet (normal feed, that is grower‟s mash) and tap water. Group II rats were fed with fat diet (cow‟s brain) (3.6g/day) alone. Group III rats received combined mixture of 70% fat diet (cow‟s brain) with 30% ethanol extract of Desmoduim elutinum stem (2.7g/day), Group IV rats were fed with fat diet (cow‟s brain) and were administered with a drug atorvastatin (5mg/rat/day). The rats were sacrificed at the end of the experimental (two weeks) period. The plant extract was screened for its phytochemical constituents, using standard procedures. Phytochemical screening revealed the presence of tannins, flavonoids, saponins and alkaloids. The liver function tests was assessed by measuring the total bilirubin, total serum protein, direct and indirect bilirubin and liver enzymes such as Alanine amino transferase (ALT), Aspartate amino transferase (AST), Alkaline phosphate (ALP), Gamma-glutamyl transferase (GGT) on the liver of the albino wistar rat. The serum, ALT, ALP, AST and bilirubin concentration of the albino wistar rat increased significantly (P>0.05) compared to their total protein concentration. The result obtained indicate that the ethanol extract of Desmodium Velutinum stem possess hepatoprotective activity on the fatty liver of albino wistar rat fed with fat from cow‟s brain. The studied plant showed variable amount of phytochemicals including flavonoid, alkaloid, saponin, tannins, terpenoid which were determined quantitatively using literature methods. The significant effect of the Desmodium velutinum stem ethanol extract was compared with standard drug, atorvastatin. The result in the present study suggest that the ethanol extract of Desmodium velutinum stem can be used in treating liver diseases.

CHAPTER ONE
1.0 INTRODUCTION
The liver is the largest and most complex internal organ in the body. It plays an important role in the maintenance of internal environment through its multiple and diverse functions. Liver is involved in several vital functions such as metabolism, secretion and storage. Hepatitis or inflammatory disorder involves inflammation and change to the hepatocytes. Hepatitis is one of the most prevalent diseases in the world. Every year 18,000 people had been reported to die due to liver cirrhosis caused by viral hepatitis (Wang et al., 2008). Ectopic fat storage occurs in obesity, particularly in the liver leading to a condition termed non alcoholic fatty liver disease (NAFLD) characterized by varying degree of liver injury that progresses from steatosis to tratohepatitis, fibrosis and necrosis. Due to its prominent association with insulin resistance/obesity, NAFLD is regarded as the hepatic manifestation of metabolic syndrome. Liver has great capacity to detoxicate toxic substance and synthesizes useful principles. Therefore damage to liver inflicted by hepatotoxic agents is of grave consequences. Experimental studies have reported that animal fed a high fat diet (HFD) for more than two months develop weight, hyperlipidemic, hyperglycemia, oxidative stress and insulin resistance (IR). Besides, consumption of a calorie-rich diet results in lipid accumulation, excess production of inflammatory cytokines and macrophage infiltration that favours the progression of liver disease. Many medicinal plant/indigenous plant have been mentioned and well established as hepatoprotective agents.

Desmodium velutinum is a medicinal plant around the world. The extract of Desmodium velutinum showed significant anti-pyretic activity on experimental rats used. Desmodium velutinum is very rich in alkaloids and related amino compounds. It is a source of flavonoid, saponins and pharmacological active agent useful in the treatment of aches and pains. It also showed that one of the uses is for erectile enhancing property. Desmodium velutinum being one of the important medicinal plant in the world may have effect on the liver. However limited studies are available on the effect of Desmodium velutinum treatment on hepatoprotective effect of its extract on high fat diet fed animal. In this regard, the present study was aimed to investigate the effect of ethanol extract of Desmodium velutinum stem on liver function tests on albino wistar rats fed with high fat from cow‟s brain related to different hepatoprotective effect by comparing it to a known drug, atorvastatin treatment which is used to lower the level of cholesterol in blood. Since changes in the concentration and composition of plasma lipid and lipoproteins occur frequently in liver disease, these findings may be useful in following the clinical course of patient with liver diseases of various causes.

Liver disease is associated with characteristic changes in the lipid composition of the surface coat of plasma lipoprotein particles. Cholesterol accumulate as hepatic secretion of lecithin cholesterol acyltransferase decreases, such abnormal circulating lipoproteins tend to induce corresponding changes in cell membrane lipid composition. Studies in both human and experimental liver disease confirm that this does occur and that it is wide-spread. Low density lipoproteins, which are rich in cholesterol can also be taken up by the liver or extrahepatic tissues by a receptor mediated endocytosis that specially recognizes apolipoproteins. It can be predicted that extra hepatic membrane dysfunction might be a general feature of severe liver disease. It is proposed that many of the cellular disturbances and metabolic abnormalities accompanying hepatic disease result from, or are exacerbated by lipoprotein induced changes in membrane lipid composition and function. Hence Desmodium velutinum may be a source of a pharmacological active agent useful in the treatment of high level cholesterol in the blood which has got both liver protecting and nutritional value.

CHAPTER TWO
2.0 LITERATURE REVIEW
The use of herbs and medicinal plants as the first medicine is a universal phenomenon. Every culture on earth, through written or oral traditions has relied on the vast variety of natural medicine found in healing plants for their therapeutic properties. All drugs of the past were substances with a particular therapeutic action extracted from plants. This, natural plants have been valuable sources of medicinal agent with proven potential of treating infectious disease and with lesser side effects compared to the synthetic drug agents. Hence potentially useful drugs can often be recognized from their relative importance and use in folk medicine. Desmodium velutinum has been reported in traditional medicine to have medicinal properties Extracts of Desmodium velutinum are used traditionally in some disease, hence may be as sources of a pharmacological active agent in the treatment of aches and pains. Ethanolic extract of Desmodium velutinum possess antipyretic property.


No comments:

Post a Comment

undefinedSOLD BY: Enems Project| ATTRIBUTES: Title, Abstract, Chapter 1-5 and Appendices|FORMAT: Microsoft Word| PRICE: N5000| BUY NOW |DELIVERY TIME: Immediately Payment is Confirmed

undefinedSOLD BY: Enems Project| ATTRIBUTES: Title, Abstract, Chapter 1-5 and Appendices|FORMAT: Microsoft Word| PRICE: N5000| BUY NOW |DELIVERY TIME: Immediately Payment is Confirmed