DESIGN AN IMPLEMENTATION OF A COMPUTER BASED SEAPORT BILLING SYSTEM
(A CASE STUDY OF NIGERIAN PORT AUTHORITY LAGOS)
ABSTRACT
Handling of cargo has been a circular
task all these while in our various ports. And Nigerian Ports Authority
(N.P.A) being an organization responsible for seeing to the affairs of
our various sea ports in Nigeria, have worked endlessly to make sure
cargoes are properly handled without much complain of damage or
misplacement. To ease the operation of cargo handling in our sea ports,
researcher took up this study by critically understanding the work,
procedure involved, analysis of the various steps and at the same time
detecting problem in the present system and designing a new system that
has solution to the problem of the existing system. The new design is
computerized and is subject to modification at any given time. It also
have this interaction feature and accurate in it’s output.
CHAPTER ONE
1.0 INTRODUCTION
Nigeria Ports Authority is a government
owned organization under the supervision of the federal Ministry of
transport with responsibility of providing specific ports and labor
services for the country’s meantime industry.
One of their numerous duties and major
functions is the provision of Cargo Handling Quays facilities. Right
from the inception of this company, the billing system has been manually
processed. The port complex is in the early stage of computerization
and the manual method of preparing customers’ bills are delayed.
A computer-based billing system is
necessary for handling and preparing of accurate bills for customers.
The new system will facilitate the prompt preparation of bills, easy
retrieval of information, security to vital information and resource
sharing among the billing department.
1.1 BACKGROUND OF STUDY:
Once Port complex is located near Port
Harcourt, Rivers State of Nigeria, the port is a natural port and was
established about twenty years ago, firstly with the construction and
commissioning of the Federal Lighter Terminal (FLT) in 1982 and later
the Federal Ocean Terminal (FOT) in 1996.
These two terminals handle lighter
(smaller) vessels and ocean-going vessels respectively. The average
draught of FLT is about 5.7m while that of FOT is about 13.0m being the
cheapest in the West and Central African sub-region. In this regard, the
FOT is envisaged to be attiacting more cargo ship and traffic not only
as a transit but also as a transshipment center in the sub-region. It
however did not have any mechanical handling equipment for billing.
The billing system is presently handling
manually by the marketing department of this port. The marketing
department of the port took over the function of revenue billing from
the traffic department in the 80’s. Their main function is to raise
customer’s bills of all statutory charges against port users for the
services rendered to them. These services includes Rental period at the
number of days the consignment in within the port vicinity, NPA shore
handling, transfer service, documentation, terminal delivery value added
tax (VAT) and miscellaneous.
The role at which the bills are prepared
with the increasing number of customer is insignificant. There are
procedural ways in which these bills are being prepared. They are the
provisional bills of vessels, the final bills of vessels and the
miscellaneous bills. A staff has to raise as many bills as the number of
the customer increases: more importantly, delays bring extra cost on
the importer, and this makes the importer feel disappointed when they
come to collect their raised bills.
Hence, a thorough investigation and
analysis of the manual billing method enables me to gain understanding
on the true nature of their problems and design a computerized seaport
billing system that would bring solutions to the problem inherent.
1.2 STATEMENT OF PROBLEM
History has it that the billing system
in Nigeria Port Authority, one port has been plagues by several factors
based on the current manual process by the use of the Draft import Debit
and import Debit Note, these factors includes:
- Fills and records are not properly kept
- Errors are easily made and hardly detected
- A lot of time is wasted to prepare bills
- Information is not well documented
- Security of files or document is not granted.
1.3 PURPOSE OF STUDY
The main aim of this study is to
computerize Nigeria Ports Authority, Onne Port billing system in order
to improve their transaction rate of services to their various
customers.
1.4 OBJECTIVE OF THE STUDY
The primary aim of this project research
is to develop a computer-based seaport billing system that will handle
the bills raised for various customers specifically in NPA, Onne Port. A
computer –based system can be ‘batched’ or ‘interactive’. A batch
processing system is one where transactions are accumulated into batches
of suitable sizes, then each batch is sorted and processed as a simple
unit. Batch processing has a degree of delay. Interactive systems are
those which allow the user to input data in response to the information
displayed on the screen.
This project is concerned with
only ever, the researcher touched all parts of system design
that will enhance a computer based billing system in NPA.
1.5 LIMITATION OF THE STUDY
During the course of this project work,
the researcher batted with time and money constraint which nearly
affected the progress of the work. Despite all odds, the researcher was
able to produce a defendable work.
1.6 SIGNIFICANT OF THE STUDY
The need for a study of this nature can
not be over emphasized. It is expected that with the designed system,
one can realize some important effects of the computerized billing
system. Some of the effects are :-
- The chances of frauds of any kind will be drastically reduced as well as errors on customer’s bill.
- The new system saves time and facilitates the prompt raising of bills as delay brings on extra cost to customers.
- The information flow is well maintained and it enhances the top management decision making.
- The new system ensures ease of processing and hence ensures faster processing of output on customers waiting to collect theirì¥Á_G_ personal property other than animals.
1.7 DEFINITION OF TERMS
- CONSIGNMENT: The same as the container of goods.
- CONSIGNEE: The same as importer of the container.
- GROUPAGE: When two or more importers come together to improve one or more containers.
- HARBOUR: This is a safe place where ships can be to load or unload.
- HARDWARE: Is all the physical devices around the computer.
- INTERACTIVE PROCESSING: A process where by the users communicates directly with the computer.
- PORT: It means the commercial area of the harbor at the part of the harbor used for loading and in loading of goods.
- QUATS: A stone or metal plate form in a harbor where boats/ships come in to load.
- SOFTWRE: All the programs in the computer.
- SYSTEM: This is a set of interrelated elements working together to form a unit to get some output.
- SYSTEM FLOWCHART: This is a diagrammatic representation of logical flow of development of a system through different stages or processes around the computer and its various task.
- TARIFF: Tax on a particular class of imported goods.
- TRANSFER CHARGE: The money paid for the services rendered by N.P.A in transferring the consignment from the ship to the port.
- VAT: Value Added Tax-tax on the value of a product at each stage of manufacture and marketing.
No comments:
Post a Comment