DESIGN AND IMPLEMENTATION OF AN HOSPITAL BILLING SYSTEM
(A CASE STUDY OF PENULTS HOSPITAL ENUGU STATE)
ABSTRACT
This project was centered on Hospital
Billing information system. The current process of keeping records of
patients is being operated manually and due to this procedure numerous
problem are been encountered. A design was taken to computerized the
manual process in order to check this problem. The problems were
identified after series of interviews and examination of documents after
which analysis was made and a computerized procedure recommended. This
project will also suggest how to successfully implement the computerized
procedure and to overcome the obstacle that would hinder the successful
implementation of the system. The new system was designed using
Microsoft visual basic 6.0 programming language. This language was
chosen because of its easy syntax and features for developing windows
based applications.
CHAPTER ONE
1.0 INTRODUCTION
Hospital is responsible for the supply
of drugs to various inhabitants in zone at specific drug rates. Form the
inception of the hospital, billing has been manually processed.
The manual system employed is not very
efficient, a lot of paper work has to be done, receipt, irrespective of
patients, take a long period of time to prepare. Due to the volummous
number of drugs users, record of patients which serve as information for
preparing managerial decision are very difficult to locate manually.
Therefore because of the problem and
error arising from such a system, the computer based billing system
because very invaluable.
1.1 THE BENEFIT OF THIS WORK
- To assist hospital organization to maintain concise patients monitoring. This project is designed to overview how computer can be use to operation in hospital set-up system. Consequence, this can also serve as aid for computer efficiency designed to carry out administrative job.
- In the event of hug investment the risk at least will be reduced, this means that when the hospital spends a hug capital to carry out some project, that they will recover the capital with minimum risk.
1.2 STATEMENT OF THE PROBLEM
By account of history, hospital billing has been plague by several factors based on the current manual process:
– File and record are not properly kept.
– Error are easily made and hardly detected.
– Information is not well maintained.
The sole aim of this project is to reduce units entirely all these irregularities by the use of computer.
1.3 PURPOSE OF THE STUDY
To reduce stress, abnormalities,
irregularities, time consumption and cost of operation involved or fund
in various aspects of record control.
To raise the standard of computer to a greater height in the organization and also in the society
1.4 AIMS AND OBJECTIVE
This project aim primary at developing a
computer-based hospital billing system that will prepare bills for
patients in an area. A computer-based system can be “batched” or
“interactive” a batched processing system is one where transaction are
collected and prepared for input for processing as a simple unit. There
may be some delay between the occurrence original event and the eventual
processing of the transactions. Interactive system are those which
allow the user to input data in response to the information displayed on
the screen
The project is concerned with only interactive system. The practical system used is the hospital billing system.
The project however aims at the following:
– A faster means of billing a patient
– Reducing redundancies of files
– Generation of monthly billing transaction information
– Increasing billing efficiency
– A faster means of calculating revenue
1.5 SCOPE
The scope of this study, which is
equally the domain or the problem area is particularly the case study of
this research work “penults hospital Enugu” and it is to provide a
program that will effectively handle the operations of a hospital
billing system.
A program that will be interactive one,
which means there will be at time/opportunities for operator to supply
data to the computer
1.6 LIMITATION
Form the on set, everything seemed, to
be good. But there is nothing with merit without demerits. Some of the
constraints, which would have made me not to finish this work.
- Financial help which I needed most to carry out this project work
- Constant fluctuation of light, which almost made me to have hypertension.
- Economic uncertainty in the country
No comments:
Post a Comment