DESIGN AND IMPLEMENTATION OF AN AIRPLANE PASSENGER MANIFEST INFORMATION SYSTEM
(A CASE STUDY OF NIGERIA AIRWAYS)
ABSTRACT
This project is aimed at improving at
long lasting processing system on airplane passenger manifest
information. It is also aimed at keeping records all immigrants and for
processing visa with view of modifying it into a full computerized
system. The study covers the areas of application entry, record
verification, list generation, code numbering and maintenance of the
managed information. The new system developed is very easy to use, and
gives answers to report generation. Problems which evolve from the
existing system as a result of inefficiency will be notified and new
system design implemented. With references to the rapid growth in the
information technology, it is deemed necessary to develop a fully
computerized system for the processing of visa in Nigeria airways
service through this project.
CHAPTER ONE
INTRODUCTION
1.1. BACKGROUND TO THE STUDY
How is computer and other related
devices actually able to send information across data communication
lines. The answer to this is the installation and maintenance of
computer network.
Furthermore, installation and
maintenance of computer network is the glue that holds all data in the
exact form, the data is to be transfer from one place to another. While
the procedures for installation of computer methods are embodies in this
project.
1.2. STATEMENT OF THE PROBLEM
Computer hardware may fail, telephone
line may fail and more likely, the computer software may have bugs that
make the network stop working. How does the airlines clerk sell tickets
when the computer is down? How can a pilot send a message across if the
network fails? How do you get your get electronic mail, pay bills, get
news, if you become dependent on computer networks that sometimes fails.
If you a put shaved database, you want to be sure that it will not
disappear or be tempered with. If you can use home computer raid your
accounts and toil will your money?
A company that puts all its important data in line runs the risk to go out of business if that information is boss or incorrect.
Furthermore, suppose the owners of a
saved data based want only certain people to use it one way to limit use
is to give a password to those people alone, that will have access to
it and before opening the database, the computer will ask the user to
enter a password.
Password protection is not parted,
through if someone finds out your password and use it, the computer will
not know that such password is been used illegally by such person.
Finally, inability of the computer
scientist to observe appropriate procedure in connection during
installation poses treat to them, which however may lead to damage of
the computer and cards
The purpose of the study is to design a
system which shall render assistance to the computer scientist during
the installation and maintenance of a computer network.
Moreover, proper installation of various
components of the network is achieved and the prevention and corrective
maintenance are proper addressed.
1.3 AIM AND OBJECTIVES
The aim and objectives of the study are as follow:
- To minimize cost; with maintenance, there is reduction in cost, i.e. instead of spending more money in purchasing of new equipment, the money can be used in the maintenance of the faulty equipment.
- To reduce the staff; with the introduction of the computer network (computerized). There is possibility that the number of staff will reduce.
- To share file and resource at a Govern time; with the computer network or file and other peripherals can be shared at any given time as printer, scanner and files.
- To increase output; with the computer network, jobs that are schedule for 10 days can be done in 3 days and this will increase output.
- The overall objectives of the local area network; is to connect the computer system and devices in the same geographical area.
1.4. SIGNIFICANCE AND DELIMITATION OF THE STUDY
The significance of this work is to
outline the uses of computer system in the area of intelligence test
(IT) mental abilities and their measurements,
To student: the proposed study serves
the students as their reference or guide in creating their program. It
will also help students taking computer related courses to identify the
best programming language use.
To teacher: The proposes study will help
teachers to have deeper understanding to the said programming
languages. By this study they will come up with easier and powerful
program. To future researcher. The proposed study will benefits and help
the future researcher as their guide. The study can also open in
development of this study.
There are different kinds of computer
network system, such as local area network (LAN) and wide area network
(WAN) etc. but this project is limited to only LAN and using about 100
workstation.
All area of human Endeavour is usually
characterized by some limit factors. But the peculiar constraint
encounter in caring out this project is as follows:
- Time; it can be a limit when it is not sufficient enough due to time factor by which an objective or task must be accomplished.
- Finance; is one of limitation in local area network in sense that if there is shortage of capital, the objective will affected and it will not be accomplished on time.
1.5 RESEARCH METHODOLOGY
Method of choosing respondents area of
the study apart from the comprehensive lecture hand book, journal and
relevant text book used for research work and more is obtained through
the research question.
This deals with the critical mode of
operation currently utilized at airport, these give an insight at their
operation and how they handle their activites on a daily basic. This
passenger manifest information (PMI) is a kind of record that help
individual fight to organized their passenger in flight.
This record helps them to know members
of passenger in the flight, without their records they cant know number
of the passenger in the flight. So the passenger manifest information
contained the follow:-
- Full Name
- Date of Birth
- Emergency contact
- Social Security Number
- Telephone Number
The Passenger Manifest information
(PMI), is used to point out identity date elements that may point to a
passenger who represent a security risk. Once highlighted, analytical
special list can then manually review these record and identify those
passenger who should be subjected to additional screening upon their
arrival. After this information has been collected, then the agency put
the data in order the process, the formal for clearing goods coming into
the country. Billing of a customer starts after the customer has
consulted customer officer.
The development tools are defined as the
basic required devices that are used during the design of the computer
based processing and publishing system to enable the programme design an
effective and efficient software. There were five component that were
needed to be added in the system when the development of the system was
yet at an initial stage. These component can be referred to as the
software development tool. The underlisted tools were chosen and used
because of their features and case of accessibility. These tools are
briefly discussed below:
OPERATING SYSTEM:- The
program work was carried out on one computer which run window xp as the
operating system. In the final implemation the visual Studio was texted
on two computer which run window 7 and xp.
Visual Studio and php:-
The choice of programming language in this project work is the
Microsoft Visual studio and PHP. Microsoft Visual Basic is a program
that allows it users to create new program in graphical user interface,
it is especially well suited to the creation of programs for supporting
business operation and it has grown considerable acceptance in various
companies and organization around the world because of the it’s
following characteristics:-
- It is an object oriented language.
- It flexibility allows modular programming techniques.
- Application written in visual studio and PHP are interaction essay to use and understand..
- It enable input and output statement to function in window statement.
Microsoft Access :–
Microsoft access is a relational database management system that runs as
service providing multi-user access to a number of database. Microsoft
Access is owned and sponsored by Microsoft Corporation, it’s free for
open source and not for profit projects as it was designed for three
principles, performance, easy to use and simplicity. It is a perfect
tool for development and administrator to establish, maintain and
configure applications.
1.6 DEFINITION OF OPERATIONAL TERM
- Computer network: this is the process whereby two or more computers are connected so that they can communicate with each other at the same time. Share resources, file and other peripherals devices like scanner and printer.
It is a collection of computers (CPS)
and other devices connected together with cable (cats) and RJ45 plus.
This allows them to communicate with each other and other to exchange,
preserve and protect information and it also make it easier to share
expensive hardware/printer, scanner and CDROM and software’s.
- Expert system: is a computer program which solves problems from a specific knowledge base that is a body of knowledge in a specialized field.
- Installation: installation is the process whereby a device, apparatus, or piece is fixed or fitted in a place to perform some specific functions.
- Knowledge: it can be define as information and skills or education; the theoretical or practical understanding of a subject.
- Knowledge based system: is a computer that reasons and uses knowledge to solve complex problems.
- LAN: is a computer network interconnected computer in a limited area such as a home, school, and computer laboratory or office building using network. LAN is also an acronym of local area networks.
- Maintenance: this is the performance of present maintenance in the aid to prevent incipient hardware faults or to connect hardware faults that has occurred.
- Online: it indicates the state of connectivity is the condition of being connected to a network of computer or other devices?
- System: is a set of connected things that interact or independent component forming an integrated whole.
No comments:
Post a Comment