TREATMENT OF TANNERY EFFLUENT USING ACTIVATED CARBON
ABSTRACT
This research work was done using
granulated activated carbon (GAC) to treat tannery effluent and Atomic
Absorption Spectroscopy (AAS) was used to determined heavy metals
namely; chromium (Cr), Cadmium (Cd) and Lead (Pb) and the result showed
the reduction of Chromium by the used of activated carbon from
62.9466mg/L to 17.4221mg/L, the reduction of Cadmium 0.0723mg/L to
0.0419mg/L while Lead was 2.1807mg/L to 1.7644mg/L in both the untreated
and treated sample. Then various physico–chemical parameters were
analysed such as pH, conductivity, COD, and BOD. The parameters were
carried out on both the untreated and treated sample. The result of the
pH of both the untreated and treated samples showed that the activated
carbon best reduced the pH from 7.46 to 7.15 and the conductivity from
104.95µS/cm to 101.30µS/cm, while the COD reduced from 56.00ppm to
34.10ppm and the BOD reduced from 144.47ppm to 138.00ppm.
CHAPTER ONE
INTRODUCTION
1.0. BACK GROUND OF THE STUDY
A tannery is the term for a place where
the skins are processed. Tanning into leather involved a process which
permanently alters the protein structure of skin. Effluent means liquid waste or sewage discharge into a river or sea.
Wastewater from tannery effluents
attracts the attention of environmental protection agencies all over the
world which are highly toxic (Chu, 2001). Tannery industries used a
large number of chemicals (i.e. natural and synthetic tanning agents,
surfactants, salts etc.) for the treatment of skins and consequently
produce large quantities of effluents (about 10m3 of waste
per tone of leather) which have to be purified before being discharged
into the environment. Tanning industry contributes significantly towards
exports, employment generation and occupies an important role in many
countries. On the other hand; tannery wastes are ranked as the highest
pollutants among all the industrial waste (Laconi et al, 2002).
Some dyes are reported to harm mammalian
cells by causing kidney tumours\ and reproductive difficulties these
days are also potentially carcinogenic, genotoxic or tetratonic in many
animals’ species (Nimrat et al, 2004).
Dyes and heavy metals which are major
pollutant species usually exist side by side in effluents and waste
(Saffaj et al, 2004). This gave rise to different mixtures or complexes
which makes the treatment of effluents difficult to handle (Vista et al,
2010)
1.1. TREATMENT OF TANNERY EFFLUENTS
The degree of damage of the environment
depends on the nature and amounts of the hazardous species present.
Indiscriminate discharge of effluents into the environment can have far
reaching consequences. (Abdulrasaq et al, 2010).
There are acceptable standards/levels to
which the pollutant load from tannery effluents should be reduced to
before discharge into the environment.
Various techniques can be used to
regulate the pollutant load of raw effluents. Some of them are;
precipitation, filtration, bisorption, chemical coagulation and
flocculation, oxidation and adsorption (Kadrivelu et al, 2003). However,
adsorption using activated carbon is considered efficient for the dye
removal and is also widely used for heavy metal removal or recovery.
1.2. USE OF ACTIVATED CARBON FOR TANNERY EFFLUENT TREATMENT
In an effort to develop an optimal
method for treating effluents, the feasibility of combining the
Granulated Activated Carbon (GAC) and photocatalytic systems has
recently been studied. Effluents are generally comprised of organic and
inorganic species. The versatile nature of activated carbon makes it
usable for uptake of various pollutant species from effluents. It has
high degree of porosity and an extended inter-particulate surface area.
Activated carbon is a much preferred choice of adsorbent due to the fact
that it can easily been produced with not much complicated procedure
which therefore, makes it relatively easy to use and a less expensive
adsorbent to employ compared to others(Ocholi,O. 2012).
Activated carbon is used in the
adsorption of heavy metals like Pb, Cd, Cr and others and also in the
recovery of certain precious metals like Ag and Au.
1.3. ADSORPTION THEORY
The phenomenon of attracting and
retaining the molecules of a substance on the surface of a liquid or a
solid resulting into a higher concentration of the molecules on the
surface is called adsorption. The substance thus adsorbed on the surface
is called adsorbate and the substance on which it is adsorbed is called
adsorbent. The adsorptive or ion exchange mechanisms process is
predominantly dissolved metabolism independent. Adsorption is the
adhesion of atoms, ions or molecules from a gas, liquid or solid to a
surface. This process creates a film of the adsorbate of the adsorbent.
This process differs from adsorption, in which a fluid (the adsorbate)
permeates or is dissolved by a liquid or a solid (the adsorbent).
Note that adsorption is a surface-based
process while adsorption involves the whole volume of the material. The
term ‘sorption’ encompasses both processes, while desorption is the
reverse of adsorption. It is a surface phenomenon. A number of
mechanisms by which micro-organisms tolerate and removed heavy metals
have been proposed. Micro-organisms modulate metal toxicity by
maintaining and allow intracellular concentration of toxic metals via
precipitation, adsorption to the cell surface, or accumulation in the
pericellular or endocellular region of the cell. The cell walls of the
microbial biomass are mainly composed of polysaccharides, proteins and
lipids and often contain functional groups such as carboxylate,
hydroxyl, sulphate, phosphate and amino groups that bind to heavy
metals.
1.4. AIM OF THE STUDY
The aim of this research is to determine
if tannery effluent using activated carbon will yield efficient and
effective result for use in further treatment method.
1.5. OBJECTIVES OF THE STUDY
To determine if tannery effluent can be treated efficiently by using activated carbon.
To determine if treated effluent can be suitably reused in tanning industries for further leather production.
To determine if treated effluent is safe for human consumption.
1.6. STATEMENT OF THE PROBLEM
The discharge of chromium (vi) into
aquatic ecosystems has become a matter of concern in all the tannery
areas across the world over the last few decades (Singh et al, 2001).
This pollutant is introduced into the aquatic systems of leather
processing units as a result of chrome tanning of leather. The presence
of heavy metals in industrial and urban wastes water is one of the main
causes of water and soil pollution. Tremendous increase in the use of
heavy metals over the past decades has invariably resulted in an
increased flux of metallic substances in the environment (Gupta et al,
2009)
1.7. JUSTIFICATION
The common laboratory practice is to
carry out adsorption studies using a single adsorbate system (Meesavana
and Pavsant, 2008). Environmental pollution is a global challenge with
industrial effluent as major contributors (Garg et al., Kadrivelu et
al., 2003). These effluent are normally a mixture of atleast two or more
pollutant species i.e.aqueous binary or multi-component mixtures
(Meesaavan and pavasant 2008).
SOLD BY:
No comments:
Post a Comment