THE PRODUCTION OF YAM FLOUR
ABSTRACT
The project dealt on the production of yam flour from yam
chips. The yams were peeled and washed, 100grams samples coded sample A to G
were subjected to two different drying conditions. Some were dried using the
sun drying method while the others were dried through oven drying method kept
at constant temperature of 500C, sodium bi-carbonate was added to some of the
samples, all these were done to obtain a flour with the best colour and texture
quality. From the results obtained, it was observed that sample B (yam boiled
with sodium bi-carbonate and dried with oven) gave the best result and quality
when tested with hot water, this was as a result of the drying condition used,
the constant temperature maintained and the presence of the sodium bi-carbonate
used which helped in achieving the result. Generally, the samples dried through
the oven drying method at 500C gave better colour and result of the yam flour
when tested with hot water more than other samples dried by sun drying and this
was due to the stability in temperature in the oven drying method used.
CHAPTER ONE
1.0 INTRODUCTION
1.1 Background Of The Study
Yam (dioscorea spp.) is a multi-species crop that originated
principally from Africa and Asia before spreading to other parts of the world
(Hahn et al.,1987). It belongs to the family of dioscoreae within the genus
dioscorea and serves as a staple crop in west Africa.(Asiedu et al., 1992).
There are many cultivars of yam, though only six are important as staple foods
in the tropics. the economically important species grown are Dioscorea
rotundata(white yam),D.alata (yellow yam),D.bulbifera (aerial yam), D.esculenta
(Chinese yam) and D.dumenterum (trifoliate yam). Yam tubers which is the most
important part of the plants can be stored longer than other root and tuber
crops. This ensures food security even in times of general scarcity. Yam is the
third most important tropical root and tuber crop after cassava and sweet
potato (fu et al., 2005).
West Africa is the leading producer of yam and grows over 90%
of the worldwide production (40 tonnes fresh tuber/year) followed by the west
Indians where Jamaica is the leading producer (FAOSTAT,2004).
Nigeria is the world’s largest producer of yams followed by
Ghana, ivorycoast and togo (FAO,2003). Both fresh tubers and yam flour are now
exported from Ghana and Nigeria to developed countries such as united kingdom
and united states of America. These are mostly patronized by emigrants from
growing regions according to the Nigerian export promotion council (NEPC)
Nigeria realized N56 billion in 2007. Sustainable production and utilization of
yam are important steps in enhancing food security and alleviatind poverty
particularly in west Africa where it is estimated to provide more than 200
dietary calories each day for over 60 million people (Nweke et al.,1991., FAO
2002).
Yam is consumed in different forms,mainly boiled,fried or
baked.tubers are often dried and milled into flour for various product,boiled
yams,poundes yams and amala are the forms of yam mostly consumed in west Africa
especially Nigeria and benin (Akissoe et al.,2001). Yam production faces many
constraints among which are production cost (mainly planting material and
labour cost),post-harvset losses(low yields).
Water yam (Dioscorea alata) posses a higher multiplication
ratio and tuber yields as well as better storability than the preferred
indigenous species such as D.rotundata, D.alata is popular and prevalent
abakaliki agro ecological zone of ebonyi state Nigeria where it is called
‘Mbala or Noula’ (igbo names) (Udensi et al.,2008) even though D.alata is also
eaten boiled,it is less preferred to D.rotundata varieties. D.alata can also be
processed into flour and reconstituted into fufu though generally D.alata
contains less sugar and has an extended shelf-life (Raemackers,2001) which ensures
availability in times of scarcity.it is also known for its high nutritional
content,with crude protein content of 7.4%,starch content of 75-84% and vitamin
C content of ranging from 13.0-24.7mg/100g (Osagie.1992).breeders are therefore
kein to improve the food quality of the species as it has good agronomic
characteristics.
1.2 STATEMENT OF THE PROBLEMS
The principal problem in yam production that has been
identified is the high cost of seed yam, high labour requirement, diseases,
pest as well as high post harvest losses(Orkwor 1998).another constraint to yam
production is the limited processing technology. About 30% of harvested yam
tubers are lost to waste. The bulkiness of fresh transport and low margins for
both farmers and traders are thus a matter of serious concern in the urban
market (Cooke et al.,1988).
During the processing of yam through sun-drying method,the
problem encountered is the loss due to potential contamination of the product
variability in drying time, rain damage and so on. Ohweever, D.alata fresh
texture is usually not firm as the D.rotundata (white yam) and less suitable
than other species for the preparation of the most popular food product from
yam in the west Africa region(Wireko-manu et al.,2011).
Finally, during the production of flour from yam, in the
western part of Nigeria (the yorubas), the yam flour produced which is called
“AMALA” is normally brownish in colour and dark in nature, hence does not have
a good quality and colour. Technologies therefore have been discovered to bring
about the production of yam flour that has a high quality and a good colour and
texture.
1.3 OBJECTIVE OF THE STUDY
1.3.0 MOTIVATION
The growing need for the variety of food in Nigeria has
become a primary concern for the urban and rural households in Nigeria. In
recent times, the concern has raised much researcher’s interest to do related
studies. As reported in many different studies around the world, food security
is a common problem.
1.3.1 OBJECTIVES
The present study aims at carryout an experiment on fresh
yams, optimize the drying parameters and investigate the effect of drying
conditions on the quality of the yam. To result to this, the present study
which will address particular issues food drying could stimulate producers,
farmers, agriculturists, educational practitioners on the phenomenon of drying
to enhance the quality of yams to solve past harvest losses.
1.4 SCOPE OE THE WORK
1. To
carryout drying experiment on fresh yams and optimize the drying parameters.
2. To
determine the effect of drying on the quality properties
3. Process
the yam samples into chips and carryout approximate analysis of the fresh and
dried samples.
4. Production
of flour from the yam chips
5. Compare
flour samples in terms of colour and texture evaluation.
SOLD BY:
No comments:
Post a Comment