THE IMPACT OF POOR MAINTENANCE CULTURE ON THE FULL UTILIZATION OF PRIVATE RESIDENTIAL BUILDING IN NASARAWA TOWN
ABSTRACT
Building maintenance is a subject
that has to be considered seriously if building is to live up to its
expected life span a questionnaire was designed and distributed to the
occupant both respectively from their responses, a serenity index method
was used to rock the importance of each factor, which make it possible
to cross-compare the relative importance of the variable factor by
different respondent based on the analysis, it was found that the major
cause of maintenance problem were past construction preventive
maintenance management design resolution lack of founds, response time
to maintain and usage since these factor are of post of human nature,
the introduction of the culture of post construction preventive
maintenance should be encouraged Keywords: maintenance, construction,
impact, property, design.
CHAPTER ONE
1.0 INTRODUCTION
1.1 BACKGROUND OF THE STUDY
Maintenance culture is an attitude which
is seen sadly lacking in Nigerian, whether in the home, office,
school, or factory Mbamahi (2003) added that poor maintenance culture
has become a widely recognised problem in Nigeria. Maintenance culture
in Nigeria is the lowest around the world especially in our principal
town aid cities. In the rural areas, the story is different and pleasant
to hear. The traditional practice of communal clearing of community
owned places such as market; playground is in almost every village. In
private homes it is customary to refurbish building interiors with
mixtures of cow dung or natural red clay. The end result is attractive
and totally indigenous.
According to Wahab (1995) the nation accords low
priority to property management. Faworaja (1996) in Mbamali (2003)
asserted that we have no maintenance policy and therefore no such
culture exists. Neglect of maintenance has accumulated consequences in
rapid increase in the deterioration of the fabric and finishes of a
building accompanied by a harmful effect on the contents occupants
(Seeley, 1987). Inadequate maintenance culture is a peculiar feature of
almost every building in Nigeria. According to Rotimi and Mtallib (1995)
is partly due to poor maintenance culture on one hand and partly due to
the absence of an appropriate benchmark. Gurji (1990) asserted that
lack of proper maintenance culture bring the life of a building lost
before reclining the total obsolescence state. The declining maintenance
culture in Nigeria and its effect on building has become a major
problem to both the public and private sectors. This study examines the
trend of maintenance culture and its effect on construction, and quality
of materials, design and facilities as well as services used during
constructing the building. A great portion of a nation’s wealth is
evident in the total value of its buildings. It is also an important
factor in the production of the building to be preserved. A poorly
maintained building in a decaying environment depresses the quality of
live and contributes in some measures to anti social behaviour which
threatens the socio-political environment it finds itself in. This
research is necessitated to look at the existing knowledge about
continuous negligence on maintenance and its impact on construction as
being suffered by residential buildings.
1.2 STATEMENT OF PROBLEMS
According to Stephen (2002) building
services rarely perform as well as desired. The causes emanate from
deficiencies in design, construction, commissioning, tenancy work and
maintenance; many researchers have also observe that the generators of
maintenance problems could be looked at under three main divisions.
- Courses initiated during the design stage
- Courses initiated during the construction stage
- Courses initiated during the usage stage or the users carefree attitudes (bad maintenance culture).
He further said that all these could be
planned for during the design stage. Maintenance problems though do
manifest during the use of the building, their cause might be during the
design state. These made Dekker (2002), Kelly (2002); Kachashkin (2002)
to assert that “thinking on the maintenance should start in the design
phase”. According to Speight (2000). It is at the design stage that the
maintenance burden can be positively influenced for better or for
worse. Where the designer fails to make adequate consideration for
minimizing maintenance problems.
It is in view of these noticeable
obstacles that promoted this study so as to unveil the constrains and
proffer possible and useful recommendation to how maintenance problem
can be solved.
1.3 AIMS AND OBJECTIVES OF THE STUDY
The aim of this research is to discover
the impact of poor maintenance culture on the full utilization of
private residential building in Nasarawa town.
In other to achieve the above stated aim the following objectives shall be pursue:
- To examine the impact of poor maintenance culture in study area.
- To examine the effectiveness and efficiency of private building maintenance in the study area.
- To examine the problems associated with poor maintenance culture in the study area.
- To examine the pattern and types of residential property development in the study area.
- To proffer possible solution to the stated problem.
1.4 RESEARCH QUESTIONS
- What are the effect of poor maintenance culture?
- What are the impact of poor maintenance culture
- What are the problems associated with poor maintenance culture?
- What are the types and patterns of residential property in Nasarawa town?
- What are the solutions to the poor maintenance culture on residential building in Nasarawa town?
1.5 HYPOTHESIS
H0: There is no significance relationship between poor maintenance culture and private residential building.
H1: There is significant relationship between poor maintenance culture and private residential building.
1.6 SIGNIFICANCE OF THE STUDY
This study is essential in the sense
that it would not only contribute to the theory and knowledge but will
also contribute to an effective maintenance on private residential
property in Nigeria. This is because the study will attempt to find out
the impact of poor maintenance culture on private residential property
in Nasarawa town.
This research work would be of great
significance and relevance as a source of information which will guide
the private property developers, student of estate management, building
technology, property managers as well as the government and its relevant
agencies dealing with poor maintenance culture on residential property.
it will also serve as a reference materials for researchers alike.
1.7 SCOPE AND LIMITATIONS
This project work covers entirely the
poor maintenance culture as in regard to private residential buildings.
With requisite effect it has on private resident in Nasarawa town.
From the conception design, construction
and post construction, the various problems being faced by property
developers owners, users as regards to maintenance of private buildings.
Much emphasis is placed on the aspect of maintenance work such as
social and economic as well as scope management and its application on
the scope of this project.
The limitation can be seen base on the
effort that has been put to exhaust the scope are mentioned but time and
cost constraint and some residents are so adamant in answering the
question relative to the magnitude of maintenance problems are the major
form of limitations for the total achievement of the project objective.
1.8 DEFINITION OF OPERATIONAL TERMS
The definition of maintenance as in
regard to building or residential building can be seen as ingeneric term
to which include the planning maintenance, repairs and reimbursement
and provision of replacement of the structure. The good of maintenance
is to sustain the life of major asset whether building or
infrastructure.
The British standard (BS 583) (1974)
define maintenance as the combination of all technical and associated
administrative actions intended to retain an interim or restore it to, a
state in which it can perform its required function. The requirement
for maintenance must not be less than those necessary to meet the
relevant requirement and “maintained” is defined in factions act 1961
as “Maintained in an efficient state, inefficient working order, and in
good repairs”.
Chartered institute of building
(C.I.O.B) UK (1982) went forward to use this definition on maintenance
works undertaken to keep, restore or improve every facility that is
every part of the building. Its services and surrounding to agreed
standards determined by the balance between need and available
resources.
Obiegbu M. E. (1998) also defined
maintenance as a programmed transformation of a building fabric and
services, reflecting changes on pattern of the use and the technology.
1.9 HISTORICAL BACKGROUND OF THE STUDY AREA
Nasarawa Local Government area of
Nasarawa state was established in 1976 during the military regime under
the leadership of general Mohammed Administration, the local government
have thirteen 13 wards and it consist of six department which is
responsible for carried out the activities personal social primary
health care agriculture and natural resources. The state derived its
name from the local government Nasarawa. The local head quarter is
between latitude 7.8 degree east by Karu.
The also shared boundary with Benue
state, Toto Local government area and federal capital territory, the
local government have a population 187220 by the 2006 census through
contest in the law court it has multi ethnic Afo, Agatu, Gwandara etc.