THE EFFECT OF PTEROCARPUS MILDBREADII SEED ON PLASMA HDL CHOLESTEROL OF ALBINO RAT
ABSTRACT
This work was carried out to investigate
the effects of pterocarpus mildbreadii seed on the HDL- level of albino
rats.High density lipoprotein(HDL) is a fraction of cholesterol,which
helps to transport cholesterol from peripheral of cell to the liver.High
density lipoprotein is carried out to investigate cardio vascular
diseases.Fresh oha seed (pterocarpus mildbreadii seed) was collected
from Amokwe in udi local government Area Enugu state. They were dried at
room temperature for about a month in an open laboratory space, groud
into coarse form and weighed on an electrical weighing balance. 3%
tween-80 was prepared by dissolving 3% tween -80 in 97ml of distilled
water. The grounded pterocarpus mildbreadii was dissolve in the 3%
tween-80.A total of sixteen wistar abino rats used for this analysis.
The rats were divided into 4(four) groups. Group 1contain 4 rats and
received 0.5 each of 3% tween-80. Group 2 contain 5 rats and were
administered with 1400mg/kg b.w of pteridocarpus mildreadii solution
Group 3 contain 3 rats and were administered with 2600mg/kg. b.w of
pteridocarpus mildbreadii solution. Group 4 contain 4 rats and were
administered with 500mg/kg. b.w. of Edmard MRT complex.
CHAPTER ONE
1.0 INTRODUCTION
Pterocarpus mildbreadii are trees with
edible parts successfully budded, pterocarpus species (P.Soyauxii and P.
mildbeadii are reported to have different patterns of leaf flush, one
spontanous and the other intermitted making the first suitable for
commercial production and the second the home production (Okafor 1978).
Pterocarpus mildbreadii being the major case study both the vegetable
and the seeds.
The vegetable is majorly used in our
various home for cooking. Pterocarpus mildbreadii (Oha seed) are not
consumed by the people from the eastern part of Nigeria. So it cannot be
majorly stated the content of this oha seed.
The demand for vegetable oils as a
result of diminishing source of oils and fats creates the needs for new
sources as well as exploiting sources that are currently unexploited in
order to supplement the existing ones (Minzangi et al. 2011).
As industrialists continues to rely
mostly on the popular vegetable oil like coconut oil, soyabeans oil,
ground nut oil, palm oil etc. for the preparation and production of
their various products.
Plant lipids also posses nutritive value
and have an impact on human nutrition and the world economy.more than
three quarters of the edible and industrial oils marketed annually are
derived from seed and fruit triglycerol (Schimid & Ohlrogge, 2002).
Seeds have nutritive and calorific value which makes them necessary in
diets. They are good sources of edible oils and fats. The amount of
energy provide by 1g of fat and oil when fully digested is more than
twice as many joules of protein and carbohydrate do. Fats makes meals
more satisfying, enrich its flavor and delay the unset of hunger
(Odoemelan, 2005). Unfortunately, insufficient availability of animal
protein and the costliness of available plant protein sources have also
increased the need for research on revealing lesser known under-utilized
legumes and oil seeds of nutritive value (Schimid & Ohlrogge, 2002).
No comments:
Post a Comment