THE EFFECT OF N-HEXANE EXTRACT OF KOLA NITIDA BARK ON LIVER FUNCTION TEST OF ALBINO WISTAR RATS FED WITH HIGH FAT FROM COW’S BRAIN
ABSTRACT
Kola bark extract have been widely used
in tradition medicine for thousand of year, it improves liver functions
and provides protection against high fat fed metabolic rats. Present
investigations were carried out on the hepatoprotective role of Kola
bark extract meal treatment to high fat fed wistar rat. Healthy adult
male wistar rats were divided into four groups Group I: rats were fed a
standard Laboratory diet (groups match) (20g/rat/day), Group II: rats
were fed a high-fat diet alone (3.6g/rat/day), Group III: rats were fed
with combined mixture of 70% of high-fat diet with 30% Kola bark meal
(9.8g/rat /day), Group/ V: rats were fed with high fat diet and was
administered with Lipitor (Atovastatin) (10mg/rat/day) . The rats were
sacrificed at the end of the experiment (two weeks) period. The high fat
fed rat substantially elevated its serum and liver tissue AST, ALT,
ALP, bilirubin with decreased in total protein levels. Where as the
levels of all parameters significantly restored towards normalization by
the kola bark husk meal treatment. The results obtained suggest that
the Kola bark meal have potent hepatoprotective action on high fat fed
rats. A companion of the performance in both Kola bark meal and Lipitor
treatment on high fat fed rat in respect of hepatoprotective role is
clearly indicator that the Kola bark meal treatment was more and related
to the result of Lipitor as well as to the normal level.
CHAPTER ONE
1.0 INTRODUCTION
1.1 BACKGROUND OF THE STUDY
Liver is the largest and most complex internal organ in the body. It plays an important role in the maintenance of internal environment through its multiple and diverse functions. Liver is involved in several vital functions such as metabolism, secretion and storage. Hepatitis or inflammatory disorder involves inflammation and damage to the hepatocytes. Hepatitis is one of the most prevalent diseases in the world. Every year 18,000 people had been reported to die due to liver cirrhosis caused by viral hepatitis [L] Ectopic fat storage occurs in obesity particularly in the liver leading to a condition termed nonalcoholic fatty liver disease [NAFLD] characterized by varying degree of liver injury that progresses from steatosis to tratohepatitis, fibrosis and necrosis Due to its prominent association with IR (insulin resistance). Obesity, NAFLD is regarded as the hepatic manifestation of metabolite [3] syndrome. Liver has great capacity to detoxicate toxic substances.
1.1 BACKGROUND OF THE STUDY
Liver is the largest and most complex internal organ in the body. It plays an important role in the maintenance of internal environment through its multiple and diverse functions. Liver is involved in several vital functions such as metabolism, secretion and storage. Hepatitis or inflammatory disorder involves inflammation and damage to the hepatocytes. Hepatitis is one of the most prevalent diseases in the world. Every year 18,000 people had been reported to die due to liver cirrhosis caused by viral hepatitis [L] Ectopic fat storage occurs in obesity particularly in the liver leading to a condition termed nonalcoholic fatty liver disease [NAFLD] characterized by varying degree of liver injury that progresses from steatosis to tratohepatitis, fibrosis and necrosis Due to its prominent association with IR (insulin resistance). Obesity, NAFLD is regarded as the hepatic manifestation of metabolite [3] syndrome. Liver has great capacity to detoxicate toxic substances.
Kola pod is the traditional health food
around the world. Kola pod Husk meal is the residue after grinding the
pod of kola and filtration, and it is an excellent source in slightly
high in fiber (16.74%), low in crude protein (9.98%), moderate NFE
(42.391) and metabolizable energy 2497 kcal/kg, and ash content is
relatively high. (13.26%). when companied with the values reported by
(Oluokun, 1999) ;(Hamzat and Babatunde, 2001). These differences might
be due to varietals differenced and shelf life of the test ingredient
before analysis. However, the crude protein content fairly put kola pod
husk meal (KPHM) with feed ingredients like Sorghum while the fibre
content put it in same proximate composition with Bremer‘s grains. Kola
pod being one of the important pods for medical treatment in the world.
The kola pod husk provides some essential materials for doth drying. The
pod bark, when mixed with some ingredients is used in traditional
medicine to reduce Labour pains.
The bark is used in treating swellings
and fresh wounds. The roots provide excellent chewing sticks for
cleaning the teeth and the wood is used in local carvings coachwork and
boatbuilding. Lipid refers to the different kind of fats present in the
bodies of human plasma include triglyceride (TG), phospholipids (PL),
cholesterol esters (CE), and free cholesterol (FC) and non-esterified
fatty acid (NEFA. Each lipid plays a different role in our bodies yet
all of them except free cholesterol (FC) contain esters of long chain
fatty acid in their structures. Lipids are insoluble in plasma due to
their non- polar structures thus; they need some carriers that are
soluble in polar and non- polar environment. Lipids are packaged and
carried in the form of lipoprotein, which is a molecule that contains
both protein (i.e. apolipoprotein) and lipids.
Statins (lipitor) are group of drugs
approved for their Cholesterol reduction properties and are commonly
used to treat atherosclerosis and coronary artery disease. These drugs
inhibit 3-hydroxy-3-methylglutaryl Coenzyme A (HMG-COA) reductase. The
rate limiting enzyme in cholesterol biosynthesis; which converts HMG.CoA
to mevalonate. Apart from cholesterol, mevalonate is also the substrate
for the synthesis of nonsteroid, isoprenoids such as coenzyme Q.
Depletion of these isoprenoids results in the so called plelotropic
effects of statins which are independent of cholesterol.
Lowering effect.These plelotropic effects of anti-inflammatory, anti-apoptotic and ant-proliferative effect. In addition, data from experimental and observational studies indicated that statins have neuroprotective effects and be a treatment option for neurodegenerative diseases of the central nervous system and the ocular structures particularly the retina (schemer, 2007). Statins (Atorvastatin) is widely used in the treatment of hepatic diseases. They have been widely used in chinning proactive as cholesterol lowering agents to reduce mobility and mortality from coronary artery diseases. It also has an effect in inflammatory diseases such as rheumatoid arthritis, and multiple sclerosis.
Lowering effect.These plelotropic effects of anti-inflammatory, anti-apoptotic and ant-proliferative effect. In addition, data from experimental and observational studies indicated that statins have neuroprotective effects and be a treatment option for neurodegenerative diseases of the central nervous system and the ocular structures particularly the retina (schemer, 2007). Statins (Atorvastatin) is widely used in the treatment of hepatic diseases. They have been widely used in chinning proactive as cholesterol lowering agents to reduce mobility and mortality from coronary artery diseases. It also has an effect in inflammatory diseases such as rheumatoid arthritis, and multiple sclerosis.
However, limited studies are available
on the effect of kola pod husk meal treatment on hepatoprotective effect
in high fat diet fed animal in this regard, the present study was aimed
to investigate the effect of kola pod meal on high-fat fed rats related
to different hepatoprotective effect by comparing Lipitor Treatment.
CHAPTER TWO
LITERATURE REVIEW
LITERATURE REVIEW
2.1 Origin of kola
The gems Kola of the family sterculiaceae (Russel, 1955), is indigenous to tropical Africa and has its centre of greatest diversity in west Africa in the forest areas of west Africa, kola is perhaps second only to palm oil in importance in the list of indigenous cash crops
The gems Kola of the family sterculiaceae (Russel, 1955), is indigenous to tropical Africa and has its centre of greatest diversity in west Africa in the forest areas of west Africa, kola is perhaps second only to palm oil in importance in the list of indigenous cash crops
SOLD BY:
No comments:
Post a Comment