DESIGN AND IMPLEMENTATION OF COMPUTERIZED CHILD CARE INFORMATION SYSTEM
ABSTRACT
This project was centered on computerized child care
information system. The current process of keeping of child care information
records is being operated manually and due to this procedure numerous problem
are been encountered. A design was taken to computerized the manual process in
order to check this problem. The problems were identified after series of
interviews and examination of documents after which analysis was made and a
computerized procedure recommended. This project will also suggest how to
successfully implement the computerized procedure and to overcome the obstacle
that would hinder the successful implementation of the system. The new system
was designed using Microsoft visual basic 6.0 programming language. This
language was chosen because of its easy syntax and features for developing
windows based applications.
CHAPTER ONE
1.0 INTRODUCTION
1.1 BACKGROUND OF THE STUDY
Children are heritage of the cord and the fruit of the womb
is his reward. As arrows are in the hands of the mighty man, so are children of
the youth happy is the man that hath his quiver full of them (ps127:3-5) that
the African child occupies a strategic position in the family and in the
society and in the nation is not an over statement and cannot be underplayed.
The child is considered as the life. Wire of the family and the society at
large to the extent that any couple that is not blessed with a child is looked
upon with pity and sometimes sympathized with.
There is the need to know who is a child and what is child
care.
In traditional and even contemporary African, various ethic
groups have different concepts of who is a child while some ethic groups see
one one as a child in so far as she can contribute to the development of the
society some other see it in terms of one who has not yet attained the age of
initiation into the age grade. Sven in contemporary Nigeria for examples
Olukoshi etal (1990) posited that.
There is not one acceptable age, which is considered as a
worthy definition of the upper limit of child hood. The age at which a child
can become capable in law for his actions or her actions the age at which
childhood begins in terms of the right to vote and be voted for and the age
considered by the federal ministry of youth and culture and education as being
the upper limit of childhood different. Even internationally there are
divergent definitions as to who is a child. Where as the international labour
organization and the united nations population division refers to a child as
those below 18year of age the 1989 convention on the right of the child states
that a child means every human being below the age of 18year. Even though there
are divergent opinions and views as to what is the age limit of child it is the
views of this author that a child is anybody between birth to completion of
physiologically/ psychological and physical development. In order words anybody
between ages zero of his/her birth to 18years is a child.
Child care in the other hand is a kind of human acts that
jeopardizes the physical psychological and the featuring of the child either
intentionally or unintentionally child care is characterized on the continuum
by sexual care (either cast agreed or by agreement)
Child labour
Child smart
Child self control
Child honest
Child dependable
Child efficient respectable
Child not as breadwinner
Child not starving away from home
Providing a child with food and shelter
Giving of educational right to a child
Giving medical assertion of a child
Avoiding abandonment of a child
Avoiding child slavery abandonment of a child
Avoiding child slavery.
Child acre is connoted acts of giving basic needs right and
deeds of child by parents/ guardians, which will pair the well being of a
child. Caring can also take the from of adequate provision of resources for the
welfare of the child both now and in future.
Also they do not encounter problem of misplacement of vita
information or records as a result of services not being available or rendered
when needed duplications of effort due to inconsistency in activities and time
that is taken in search of file when it is required for processing.
1.2 STATEMENT OF THE PROBLEM
In every organization there are numerous problems that they
encounter. An organization like UNICEF encounter problem in their area of
documentation which includes misplacement of vital information or cases as a
result of the services that are available or rendered when it is needed
duplications of effort due to inconsistency in activities and a lot of time is
taken in search of file or reported cases when it is needed for processing.
Sit is actually this problem that is discovered that promoted
for the design and implementation of a comprised child care information system
to enable the organization to work more effectively
1.3 PURPOSE OF STUDY
The purpose of this study is to design and implement a system
that will eliminate the above listed problems, as misplacement of important
reported cases documents and records duplications of effort and a lot of time
that is required or taken when searching an processing of cases and files.
1.4 AIMS AND OBJECTIVES
The aims and objectives of the project is to study how the
organization (UNICEF) operational aims and other activities are performed.
It aimed at detecting problems that pose obstacle with a view
of modifying the operations and developing a new computerized system that will
be more efficient and accurate such as:
In the area of misplacement of vital documents a computer
will be used to record store and retrieval of large volume of documents. Which
will reduce the duplications of efforts due to inconsistency in activities and
time that is taken in search of file when it is required for processing
1.5 DELIMITATION/ SCOPE OF THE STUDY
This study is specifically concerned with the computerized
child care and carrying of the Enugu information centre of UNICEF. Although a
lot of activities are being performed by this centre. This work is therefore
concerned with childcare and caring manipulation of both the care and reporter
of a case.
1.6 LIMITATION OF THE STUDY
One to lack of time and resources the study is limited to
certain area concerned with only gathering of cases on clients and personnel
records and processing them using a computer.
1.7 ASSUMPTION
Apparently before I started this works I assumed a successful
completion by division grace of God and the cooperation of workers of unicef in
supplying me with date/information needed for the successful completion of this
project.
In terms of material resources monetary and personnel
resources the researcher had me up with them. In fact it is believed that facts
are valid.
1.8 DEFINITION OF TERMS
A child: A child means every human being below the age of 18 years
unless under the law applicable to the child majority is attained
Childcare: That is any kind of human act that
jeopardizes the physical psychological and the futurity of the child either
intentionally or intentionally.
Child caring: This connote the act of giving basic needs rights and deals
of the child by parents/ guardians peer and government and cultural community
which will pair the well being of a child. Caring can also take the form of
adequate provision of resources for the welfare of the child both now in future
Flowchart: This is the graphical representation
of the logical step and sequence involved in a procedure are program.
Date: This can be defined as groups of
non-random symbols (words value figures) which represent things that have
happened.
Information: This is the resource that enables the collection management
control and dissemination of information throughout an organization.
Monitoring: This is to keep watch and see who
denies children the rights and take the necessary steps to stop this.
CHAPTER TWO
2.0 LITERATURE REVIEW
Computerization is the process of building a new system upon
a computer technology for input, output, processing and storing. Computer
entirely replaces the manual system that is using only paper and pencil for
processing.
SOLD BY:
No comments:
Post a Comment