EFFECTS OF PROCESSING METHODS ON THE PHYSICO-CHEMICAL PROPERTIES OF SWEET POTATO AND SORGHUM
ABSTRACT
This study evaluated the effects of
processing methods on the physico-chemical properties of sweet potato
and sorghum flour”. Sweet potato (Ipomoea batatas) is an important food
crop in the tropical and sub-tropical countries and belongs to the
family convolvulaceae. Sweet potatoes are rich in dietary fiber,
minerals, vitamins, and anti oxidants such as phenolic acids,
anthocyannins, tocopherol and β-carotene. The proximate composition of
sweet potato was determined and these include moisture, lipids, ash,
protein, carbohydrates and fiber. In carrying out the analysis
practically, methods used vary according to the food material. The anti
oxidants were also determined alongside with phenol oxidase, pasting
properties, minerals and sugar contents. Sorghum is a tropical plant
belonging to the family of poaceae. More than 35% of sorghum is grown
for human consumption. The analyses carried out in sweet potatoes are
same with sorghum with the exclusion of phenol oxidase.
CHAPTER ONE
INTRODUCTION
Sweet potato (Ipomoea batatas) is an
important food crop in the tropical and sub tropical countries and
belongs to the family convolvulaceae. It is cultivated in more than 100
countries. ( Woolfe, 1992). Nigeria is the third largest producer in the
world with china leading, followed by Uganda. Sweet potato ranks
seventh among the world food crops, third in value of production and
fifth in caloric contribution to human diet (Bouwkamp, 1985). Sweet
potatoes are rich in dietary fibre, minerals, vitamins and anti oxidants
such as phenolic acids, anthocyanins, tocopherol and ß- carotene.
Besides acting as anti oxidants, carotenoids and phenolic compounds also
provide sweet potatoes with their distinctive flesh colours ( cream,
deep yellow, orange and purple). Sweet potato blends with rice, cowpea
and plantain in nigerian diets. It is also becoming popular as a
substitute to yam and garri. It can be reconstituted into fofoo or
blended with other carbohydrate flour sources such as wheat ( Triticum
aestivum) and cassava ( Manihot esculenta) for baking bread, biscuits
and other confectioneries (Woolfe, 1992).
The leaves are rich in protein and the
orange flesh varieties contain high beta carotene and are very important
in combating vitamin A deficiency especially in children.
Sorghum (sorghum bicolor (S. bicolor) is
a tropical plant belonging to the family of poaceae, is one of the most
important crops in Africa, Asia and Latin America. More than 35% of
sorghum is grown directly for human consumption. The rest is used
primarily for animal feed, alcohol production and industrial products (
FAO, 1995). The current annual production of 60 million tons is
increasing due to the introduction of improved varieties and breeding
conditions. Several improved sorghum varieties adapted to semi-arid
tropic environments are released every year by sorghum breeders.
Selection of varieties meeting specific local food and industrial
requirements from this great biodiversity is of high importance for food
security. In developing countries in general and particularly in West
Africa demand for sorghum is increasing. This is due to not only the
growing population but also to the countries policy to enhance its
processing and industrial utilization.
More than 7000 sorghum varieties have
been identified, therefore there is a need of their further
characterization to the molecular level with respect to food quality.
The acquisition of good quality grain is fundamental to produce
acceptable food products from sorghum. Sorghum while playing a crucial
role in food security in Africa, it is also a source of income of
household . In West Africa, ungerminated sorghum grains are generally
used for the preparation of “to”, porridge and couscous. Malted sorghum
is used in the process of local beer “dolo” (reddish, cloudy or opaque),
infant porridge and non fermented beverages. Sorghum grains like all
cereals are comprised primarily of starch.
AIM AND OBJECTIVE
The aim and objective of this work is to obtain diet low in sugars, with enriched nutrients intended for diabetics.
No comments:
Post a Comment