EFFECTIVENESS OF MOTIVATIONAL FACTORS ON SALES FORCE PERFORMANCE
(A CASE STUDY OF NIGERIA BREWERIES PLC LAGOS)
CHAPTER ONE
1.0 INTRODUCTION
The title of this project “Effectiveness
of Motivational Factors on Sales Force Performance” (Case Study of
Nigeria Breweries Plc Lagos).
Motivation is a word derived from the word ‘motive’ which means needs, desires, and wants drives within an individuals. Motivation in management describes ways in which managers promote productivity in their employees.
Therefore, motivation is the process of stimulating people to action to accomplish set goals. Motivation is essentially about commitment to doing something. In work goal context the psychological factors stimulating the people’s behavior can be desire for money, job satisfaction, success, recognition, teamwork etc. The performance of employees is a product of both their abilities and the will to work (e.g. skills and experience). A talented employee who feels de-motivated is unlikely to perform well at work, whereas a motivated employee can often deliver far more than is expected from him or her. Although a great number of sales force have known the importance of motivation in relation to employees performance and the aim of this project work is to examine the effectiveness of motivational factors on sales force performance in the Nigeria Breweries plc.
1.1 HISTORICAL BACKGROUND OF THE CASE STUDY
The Nigerian Breweries plc is the
pioneer and largest brewing company in Nigeria and was incorporated in
1946 and recorded a land mark when its first bottle of beer, star
larger, rolled off the bottling lines of its Lagos brewery in June 1949.
Other breweries were subsequently commissioned by the company,
including Aba Brewery in 1957; Kaduna Brewery in 1953 etc. Thus, from
its humble beginning in 1946 the Nigeria Breweries plc now have eight
operational breweries from which its products are distributed to all
parts of Nigeria, in addition to the Maltina plants in Aba and Kaduna.
The company has a portfolio of high-quality brands including:-
- Gulder Lager (1970)
- Star Larger (Launched in 1949)
- Legend Extra Stout (1992)
- ABV Extra Stout
- Life Continental Lager (October 2011)
- Goldberg Lager (October 2011)
- Premium Lager
- Heineken Lager (June 1998)
- Star Lite Lager (February 2014)
- Ace passion Apple Spark (December 2011)
Most of the products are packed in returnable bottles and all products are presently produced in cans.
1.2.1 EXPORT OPERATION
Nigeria Breweries plc has an increasing
export business that dates back to 1986. The company currently exports
to the United Kingdom, European Union and the West African sub-region.
1.2.2 RESEARCH AND DEVELOPMENT
Nigeria Breweries plc has kept pace with key international
development, thus ensuring that its
system process and operational procedure is always in conformity with
proven best practice in most part of the world. It is in line with this
policy that the company established a research and development centre in
1987 to enhance its research activities on all aspects of breweries
operation.
1.2.3 ANCILLARY INDUSTRIES
As a major brewing concern, the company
encourages the establishment of ancillary businesses. Many of these
organizations depend largely on the company for their means of
livelihood. These include manufacturing of bottles, crown corks, labels,
cartons, plastic crates and such service providers such as
hotels/clubs, distributors, transporters, event managers, advertising
and marketing communication agencies etc.
1.2.4 SOCIAL RESPONSIBILITY
Nigeria Breweries plc is a social
responsible corporate organization with good track of records of
corporate social initiative in identified and strategic areas. The
company’s social
responsibility is driven by a vision to
always “Win the Nigeria”. Over the years, Nigerian Breweries plc has
been very active in supporting our national development aspiration in
line with our commitment to “Win with Nigeria”. The company in 1994
established an educational trust fund with take-off grant of N100
million to take more active part in higher learning, all these efforts
are to provide and encourage academic excellence in Nigeria.
This is in addition to its secondary and
university scholarship programmes for children of its employees. The
company is also involved in the development of leadership, musical and
motive talents, through various programmes. Some of these activities are
captured in the company’s social and Environmental-Report.
1.3 BACKGROUND OF THE STUDY
The background of this study is about the motivational concept on
sales personnel that is being used in Nigeria Breweries.
The concept, of motivation covers a vast
area in business setting as the matter of concept the area of focus
will be entirely on sales department (sales force). People differ so
much in their learning; as a result, a great deal of information is
usually required, before we can infer clearly a means motive from what
he/she is doing. The success of any organization is connected to its
ability to control, coordinate, and motivate its human resources with
this view, it becomes absolutely necessary for managers to have a good
knowledge of psychology in other to develop motivational scheme that
will be adequate enough to motivate their subordinates to perform their
best in their duty or task.
Motivation therefore can be seen as the
propelling force for effective and efficient management. In conclusion,
it is essential to state that motivation is not by any way an attempt to
manipulate people, people rather understand the required or desired
motivating force needed in designing a better environment for better
performance.
1.4 STATEMENT OF PROBLEM
The adequate understanding of motivation and its application regards to induce workers to higher level of performance;
it has been an inherent problem in most
organizations today. The duty of a manager is to initiate an effective
control and coordinates workers on a high level performance.
The activities of individuals towards the achievement objective cannot be achieved effectively without adequate motivation. Managing involves the creator and conducive environment for the performance of individuals working in group towards a common objective. It quite understands that a manager cannot do without knowing how to motivate people around him/her. Many sales manager’s fall in marketing roles due to failures to identify factors for low productivity endless complains and confusion and high level of the main causative factors responsible for all manners of organizational problems in modern times.
Nigeria Breweries plc has long success history of business, assorted beer and beverages products throughout Nigeria. Therefore, it is hope that the findings of this study will reveal a lot of role of motivation in relation to sales performance in Breweries industries in Nigeria’s with reference to Nigeria Breweries plc Lagos.
1.5 AIMS AND OBJECTIVE OF THE STUDY
The research the “Effectiveness of motivational factors on sales force performance” is aimed at examining the effectives on motivational factors on sales force performance. The specific objectives are:
- To find out the motivational packages to sales force.
- To examined the level of employee’s satisfaction with motivation given.
- To investigate the root cause of employees grievances in the Nigerian Breweries plc.
- To examine conflict management techniques in the Nigeria Breweries.
- To provide appropriate strategies for improve sales performance in Nigeria Breweries plc.
This study is a partial fulfillment for the award of Higher National Diploma in Business administration and Management,
Federal Polytechnic Nasarawa State. The importance of these studies lies in its great benefits to individuals as well as business organizations. First of all, students of Business at National, Higher National,
Post Graduates Diploma and Professional levels will find this study
as their needs in the course of carrying out research on the topic motivation.
Secondly, in Nigeria Breweries plc will also find the analysis and finding of this research very useful in their quest for objectives and realistic data on the effect of motivation on sales force performance especially in times of decision making on appropriate motivation for improved marketing performance.
Finally, the general reading push will also immensely benefit from the analysis and findings of the study.
1.7 SCOPE AND LIMITATION OF STUDY
The study of the effectiveness of motivational factors on sales
force performance could be difficult to
be carried out in all areas of Nigeria Breweries in order to achieve
high level of accuracy and objectives.
This study is confirmed to the motivational factor of sales force of the Nigeria Breweries plc over the years.
This survey also cover all issues relating to the sales force performance including complaints, grievances, strikes (if any) and conflict management of Nigeria Breweries plc.
LIMITATION: In as much as the researcher hopes to provide as much material facts as possible with respect to this study, a number of constraints were in the course of the study.
One of the major constraints in the
conduct of this research project is time. The conflict between
schedules, appointments with the area sales manager of the same company
and the researcher’s ongoing lectures and official assignment in office,
all posed a great deal of constraints in obtaining a meaningful amount
of data for the project.
In addition, non-availability of literature (textbooks) relating to the topic under research, limited the depth to which the researcher intended to review related literatures.
Finally, the in-accessibility of
information required from the company termed secret and classified
information passed constraints,
as much information would have an immense contribution to the topic under research.1.8 STATEMENT OF HYPOTHESIS
The following hypotheses are drawn to guide this study:
HO: The motivational scheme of Nigeria Breweries plc does not significantly contribute to the company’s sales force performance.
HI: The motivational scheme of Nigeria Breweries plc contributes significantly to the company’s sales force performance.
1.9 DEFINITION OF TERMS
Company: Any legal entity engaging in business.
Employee: A person working for another person or a business
firm for pay.
Incentive: A thing that motivates or encourages one to do something.
Job Recognition: Lets employees know that their hard work is valued.
Job Dissatisfaction: When people are not happy with their job.
Manager: A person who is responsible for controlling or in charge of certain task in a company.
Management: Is an act of getting things done efficiently and effectively with and through other people.
Performance: The results of activities of an organization.
SOLD BY:
No comments:
Post a Comment