EFFECT OF PARTICLE SIZE ON OIL YIELD USING SCENT BEAN SEED (‘OZAKI’)
ABSTRACT
This project was done to extract and characterize bean oil
according to their particle sizes. The experiment was carried out using scent
bean (i.e. ‘Ozaki’, ‘Ijilizi’or ‘Azamu’) as sample. The oils were extracted by
solvent extraction /leaching extraction using n-hexane. Proximate analysis was
carried out to obtain percentage moisture content, ash content, total oil
content, protein content and carbohydrate content of the extracted oils. From
observation, it was noticed that as the diameter of the sieve decreased, the
quantity of oil obtained increased.
CHAPTER ONE
1.0. INTRODUCTION
1.1. BACKGROUND OF THE STUDY
There has been an increase in the world production of
oilseeds over the last thirty years (Murphy, 1994); this would appear to be
related to the increasing demand for oilseed products and by-products as
oilseeds are primarily grown for their oil and meal.
Oils from most edible oilseeds are used in the food industry,
though there is growing emphasis on industrial utilization as feedstock for
several industries with about 80% of the world production of vegetable oils for
human consumption. The remaining 20% utilization is between animal and chemical
industries (Murphy, 1994).
According to Rajagopal et al. (2005), bio-oils from oilseeds
are used as Straight Vegetable Oil (SVO) or as biodiesel (trans esterified oil)
depending on type of engine and level of blend of the oil; scent bean oil i.e.
Ozaki, Ijiliji, or Azamu is found mainly in the South-East of Nigeria and is
not an exception. This phenomenon has created a school of thought that it is
better to use oilseeds as bio-fuel, which will lessen the competition for
fossil fuels, which are not renewable.
Fossil fuels are not only costly in terms of price but are
also costly to the environment as they degrade land, pollute water and cause a
general destabilization of the ecosystem with global warming as an end result.
Furthermore, crude oil wields socio-political power that often dictates the
pace of economic growth in specific locations, especially non-oil producing
nations.
Nevertheless, the petroleum industry requires a greater
quantity of oil to meet its demand.
Demand, however, by the food industry alone is not secure for
many developing countries like Ghana that depend on imports of vegetable oil
and fossil fuels. In order to meet the required amounts needed by all
industries, these fats and oils must be available in large quantities locally
with an effective extraction process at an affordable cost. The ability of a
particular oilseed to fit into the growing industries depends on its utilization
potential, rate of production, availability and ease of the processing
technology. Thus while some oilseeds are being largely utilized in the oil
processing industries, quite a number of oilseeds are under-exploited.
Generally, oils and fats from seeds and nuts constitute an
essential part of man’s diet. Fats and oils, together with proteins,
carbohydrates, vitamins and minerals, are the main nutrients required by the
human body. Fats and oils are rich sources of energy, containing two and a half
times the calories of carbohydrates (per unit weight).
In addition to being a source of vitamins A, D, E and K, fats
and oils also contain essential fatty acids. These essential fatty acids are
not manufactured by the body and must be obtained from diets, with linoleic,
oleic and linoleic acids as examples of unsaturated fatty acids (NRI, 1995).
Modern processing of vegetable oils yields valuable products
such as oleo chemicals. Oleo chemicals are now largely being used in the
manufacture of many industrial products, namely building auxiliaries, candles,
detergents and cleaning agents, cosmetics, fire-extinguishing agents, flotation
agents, food emulsifiers, insecticides, lubricants, paints, paper, medicine and
chemicals. The meal or cake is used in the formulation and preparation of
livestock feeds and food additives.
The production of oil plants takes third place in the world
production in terms of value, after starchy plants and fruits, and ahead of
beverages and stimulants. Edible seeds and nuts noted for their oil contents
include palm nut, coconut, soya bean, olive, groundnut, sunflower seed, and
cottonseed, while non-edible seeds and nuts include jatropha seed, neem seed,
and castor bean. Moreover, bean oil has strengthened its dominant role among
fats and oils produced based on its quality and nutritional grade. Bean oil
contains linoleic, oleic and linoleic acids that are found in many plant oils.
Shortage of these fatty acids leads to deficiency symptoms
especially in growing children and animals. Bean oil has the highest content of
lecithin (1.1-3.2%) which is a surface-active compound used as an emulsifier in
the food and pharmaceutical industries, and other industries (Sigmund and
Gustav, 1991).
Among the industries that use oils and fats from oilseeds, apart
from the food industry, are the beauty, pharmaceuticals, aromatherapies,
building and construction, and the petroleum industry.
1.2. Problem Statement
Many plants have been identified as sources of oil, with some
of the plant species and their oil extracted and used as medicines and food.
However, very few of these species have their oil characteristics determined.
Because of the high demand of oils for various purposes
including medicinal, perfumery, soap making, insecticides et al. Imported oils
are very expensive to meet the demands of our local consumer industries;
therefore, it becomes necessary to source and synthesize these oils locally.
Since these oils can be produced locally, it gives no reason for their
importation or at least should reduce the rate at which these oils are imported
and give attention to local production.
1.3. OBJECTIVES OF THE STUDY
The purpose of this study is to
a. Find the percentage composition of oil in the bean seed
b. To determine the effect of particle size on the yield of
the oil.
1.4. SIGNIFICANCE OF THE STUDY
Exploitation of fruits and seeds as a source of oil can help
to reduce oil costs by diversifying the sources for this commodity. Data
generated from this study will benefit industries for production of oils for
various purposes.
In addition the content and composition of fatty acids of plant seed oils can serve as plants taxonomic markers.
In addition the content and composition of fatty acids of plant seed oils can serve as plants taxonomic markers.
1.5. JUSTIFICATION OF THE RESEARCH
Some factors and benefits of bean (“Ozaki, Ijiliji or Azamu”)
oil make the research worthwhile;
1 The bean is readily available.
2 Oil from this particular bean is medicinal and applicable
in pharmaceutical industries.
3 Small scale industries coming up as a result of oil
extraction can reduce unemployment.
4 It can attract foreign exchange earnings for Nigeria.
SOLD BY:
No comments:
Post a Comment