Design And Implementation Of Computerized Medical Duties Scheduling System
(A Case Study Of University Of Nigeria Teaching Hospital)
ABSTRACT
There is always the need to introduce
more changes or modification in Hospital curricula particularly in the
area of their duties scheduling to be able to meet demand. Medical
duties scheduling is a list of activities or things to be done showing
the time or dates when they are intended to happen in a tabular form.
The design of Hospital medical duties scheduling to a particular duties
at a particular time to avoid unnecessary clashes. Medical duties
scheduling system enable in to tract the where about of any medical
personnel at a particular point in time and the problems- encountered in
manual preparation are been detected solution to the problem of medical
duties scheduling system are solved and recommendation made on how to
maintain the system effectively.
CHAPTER ONE
1.0 INTRODUCTION
Hospital is an aspect that schedule
plays a vital role for succeful achievement of its curriculums. Hospital
work take a succeeding step. Each step has a specified duration of time
and a mapped out work coed associated with it. The time stipulated to
be utilized maximally to enable you cover the work load elaborately.
The issue of analysis the work load and
time involved in an Hospital category and distributing the work load is
time intervals. For maximum knowledge in pact it a great concern to the
professorate in the field. This is where comprehensive medical duties
schedule is always designed to suit the curriculum.
Medical duties schedule does not only
involved the all capture of time duties to medical personnel, it also
involve the careful allocation other resources like cabour force ad
space available. When all these factor are not adequately taken care of,
it lead to classes which hinder the effective Hospital operation.
1.1 STATEMENT OF PROBLEM
The problem associated with the old manual system of medical outies scheduling hindered effective table predication.
It takes a lot of time to process the
volume of data involved menially. This makes analysis and synthesis
difficult for man to carry out.
The existing system waste a lot of time.
This delay the in effect set back of the Hospital operation. The manual
medical duties scheduling causes lot of have and clashes. Duties
clashes between Doctors also medical duties scheduling unreliable.
Due to manual approach toward medical
duties schedule, the there is a problem of time consuming, Repeated
process and clash/conflict of fixtures.
1.2 PURPOSE OF STUDY
This study is carried
out with a view of producing a computerized medical duties scheduling
during manual medical duties scheduling. The new system will also to
produce a comprehensive and authentic medical duties schedule.
This study also proves the capabilities
of the computer in the area of processing concerning the Hospital
sector. By implementing computer, one would be able to obtain
information needed at a particular point in time. Finally, the study was
also carried out to the rode of medical duties schedule medical duties
preparation in valves a lot of work in area of processing (ie allocation
of available resources) to avoid clashes.
The major clashes that always occur is
the Doctors and nurses clashes. The Doctor clash takes place when two
Doctor is assigned to work at the same period of time, like wise nurses
clash.
To handle this aspect successfully and
to produce a reliable result a more sophisticated machine like computer
has to e introituses. The computer with it sophisticated features will
handle the time table preparation (processing) in an automatic way. It
automatically according to pre-defined program instructions. This will
lessen the work involved in the preparation of medical duties scheduling
and aid in producing adequate and comprehensive medical duties
scheduling.
1.3 AIM AND OBJECTIVES
Several department in the University of
Nigeria teaching Hospital Enugu have been for the past year eve till
date designing their Duties schedule manually.
The primary aim of this project work is
to relied the burden and obstacle hungering the production of effective
medical duties schedule by developing a computer program which will be
timely, more accurate more reliable and more comprehensive. This new
system also makes the entire operation very easy.
1.4 SCOPE AND DELIMITATION
The overall goal of this work is purely
investigative and prescriptive. The university of Nigeria teaching
Hospital Enugu have been selected as our case study.
Our work is limited to the study of
medical duties scheduling system existing in university of Nigeria
teaching Hospital and designing a program for its computerization.
1.5 LIMITATION AND CONSTRAINTS.
Encountered many difficulties in the
pursuit of material and resources that help for the succeful completion
of this project work.
It was also difficult to collect data
form mine case study due to unavailability of personnel it give me
adequate information in my area of study.
1.6 ASSUMPTION
I assume that with the aid of computer
when implemented, the medical duties schedule will be efficient and more
effective so as tackles the procedures involved automatically.
The time consumed in repairing the work manually every year or month by month will be reduced.
1.7 DEFINITION OF TERMS.
Hospital:- According to oxford advanced
accuracy, Hospital is an institution providing medical treatment and
care for ill and injured people or A building where people who are sick,
injured or ill are given medical treatment and care.
COMPUTER:- A computer
is an election machine or devices working under the control of stored
programs (system software) automatically accepting data as input,
processing it and producing information as output.
SYSTEM:- system is a
network of interrupted procedures pried together to perform a specific task.
MEDICAL:- It is
connected with the way of treating illness that
do not involved cutting the body.
SCHEDULE:- A plan that
list all the work that you have to do and when you must do each thing.
MANUAL:- This is a physical way of carry out intervention.
DUTIES TIME INTERVAL:- Duties time interval is the interval form the start of duties to the close of duties each days.
No comments:
Post a Comment