DESIGN AND IMPLEMENTATION OF A TELECONFERENCE SYSTEM
ABSTRACT
This project topic, Design and Implementation of a Teleconference
System, is one of the state of the art invention and need of many
organizations for purpose of reducing cost, risk and time wastage. This
project strives to bridge the geographical distance between two or more
organization. Other importance of Teleconference includes: (i) For
organizations, delivery costs are reduced with resultant cost benefit in
terms of time, travelling and spread of resources over large groups.
(ii) Delivery of full courses, lessons, tutoring, project work and
training can be provided to the students through teleconferencing. The
study outlines the main concepts of the analysis and design methodology
of the proposed system, compares it to the existing and goes further to
explain the design and implementation of the system. System was achieved
using visual basic 6.0 and run on a windows xp or higher versions. The
fact finding techniques employed is interview, observation, online and
library research.
CHAPTER ONE
INTRODUCTION
INTRODUCTION
1.1 Background
As computer and electronics technology
continues to grow over the ages, many new innovations continue to flood
the industry, creating machine and avenues through which human
activities can be enhanced.
The development video messaging over
media is an important aspect of this growth in technology. Such
information was then able to be packaged and transmitted remotely from
source to intended users. But this was rarely a real time scenario. The
best we can get out of this was a live coverage of an event, which was
usually of high cost and difficult for individuals to own.
The advent of the internet offered
better opportunity for inventors to think of better ways of making the
communication of video information from source to target in real time
and with less cost. Many equipment have been developed to this effect.
Further improvement has given birth to what is now known as
teleconference.
The word ‘tele’ means distance. The word
‗conference‘ means consultations, discussions. Through teleconferencing
two or more locations situated at a distance are connected so that they
can hear or both see and hear each other. It allows the distant sites
to interact with each other and with the teaching end through phone,
fax, and e-mail.
The interactions occur in real time.
This means that the learners/participants and the resource persons are
present at the same time in different locations and are able to
communicate with each other. In some situations, questions can be
faxed/e-mailed early for response by the resource persons conference is
further described by Matthew Lombard and Theresa Ditton as ―an illusion
that a mediated experience is not mediated.” Today, it often considers
the effect that people experience when they interact with a
computer-mediated or computer-generated environment. The
conceptualization of presence borrows from multiple fields including
communication, computer science, psychology, science, engineering,
philosophy, and the arts. The concept of presence accounts for a variety
of computer applications and Web-based entertainment today that are
developed on the fundamentals of the phenomenon, in order to give people
the sense of, as Sheridan called it, ―being there.” Since
teleconferencing is actually a useful tool in organizations because it
is solely used to bridge the geographical distance between two or more
companies, and from my research, I have discovered that it is only big
companies that can actually afford it, so I designed this project
inorder to curb that trend that is allow smaller companies purchase and
also make use of it.
1.2 Aims and Objectives
The major objective of this work is to
develop a Computer Based Teleconference. It also targets at contributing
to academic research work.
1.3 Justification for the project
The need for a teleconference system is obvious for several reasons as shown below:
a. It Impacts on education by allowing live participation without physically being present for a lecture
b. Legal issues can still be treated even when a person is not fit to go to court
c. Press men can attained international conferences without having to be physically present
d. Telemedicine is possible because of teleconference
e. It makes the best use of the
available resources by expanding the learning opportunity and taking the
resources to the learners.
f. It overcomes time or scheduling
problems for the learners who can assemble at a learning center for a
limited period only because of their full time or part time work, and
family and community commitments.
g. It can be designed to meet local specific requirements of training in terms of content, language and conditions.
h. Training is of high quality and
consistent. There is exposure to multiple perspectives from the primary
sources, and therefore as the input from the resource persons is direct,
there is little loss of quality in transaction.
i. There is greater appeal, motivation and retention of information as a variety of teaching methodologies are used.
1.4 Scope of the Project
The scope of this work will include the following
a. A dynamic Network system that can communicate in real time
b. To be able to implement a video streaming server.
c. Explore the power of visual basic in data handling
a. A dynamic Network system that can communicate in real time
b. To be able to implement a video streaming server.
c. Explore the power of visual basic in data handling
1.5 Project Report Organization
This report is organized into five
chapters. The first chapter takes care of introduction: background, aims
and objectives, justification, and scope of the project. Chapter two is
the literature review. Chapter three is the project methodology,
analysis, limitations of the existing system, system design, system
flowchart and top down design were done. The input, processing and
output modules are critically analyzed.
In chapter four, system implementation,
testing and integration: choice of development tools, system
requirements, and testing were carefully done. Finally chapter five
closes up with summary, recommendations and conclusions: limitation,
Bill of Engineering Measurement and Engineering (BEME), bibliography,
appendices
CHAPTER TWO
LITERATURE REVIEW
2.1 General Overview of Teleconference
The word ‘tele’ means distance. The word
“conference” means consultations, discussions. Through teleconferencing
two or more locations situated at a distance are connected so that they
can hear or both see and hear each other. It allows the distant sites
to interact with each other and with the teaching end through phone,
fax, and e-mail.
The interactions occur in real time.
This means that the learners/participants and the resource persons are
present at the same time in different locations and are able to
communicate with each other. In some situations, questions can be
faxed/e-mailed early for response by the resource persons.
No comments:
Post a Comment