DESIGN
AND IMPLEMENTATION OF PRODUCTION CONTROL SYSTEM
(A
CASE STUDY OF 7UP BOTTLING COMPANY)
ABSTRACT
This project will be centered on the production control
system. This production control system being operated manually ad due to the
numerous problem encountered and over payment. A design was taken to
computerized in order to check this problem the problem were identified after
series of interviews and examination of document after which analysis will be
made and a computerized procedure recommended. This project will also suggest
how to successfully implement the computerized procedure and to overcome the
obstacle that would hinder the successful implementation of the system. The new
system was developed using visual basic 6.0 and access database. This language
was chosen because of its easy syntax and features for developing windows based
applications.
CHAPTER
ONE
1.0
INTRODUCTION
In his definition K.O. Hockyer, defined production in 1990
as an act of putting together human being, materials, plant and money in order
to provide goods and services. The success of production comes about as a
result of effective planning execution and control of activities within the
frame work of the cooperate objective within the frame work of the cooperative
objective.
This a place where people are employed for the purpose of
making, uttering, reparing and or lamenting, finishing clearing, washing,
breaking and adopting for sale of any articles.
The factory is regarded as a continued self sufficient body
and it depend upon integration only when other parts of the organization
change. Although this view is fact changing, the dangers f these visions are
great, for example government registration may face a marketing change which
requires a design modification in turn, can alter processes in such a way that
operations may be displayed with consequent redundancy and retaining problems.
This problem would have seen and their effect integrated to
look, outside the four walls of their machine production unit. Similarly a
board decision to change from a selling policy where orders are accepted to
marketing policy. Where orders are sought will inevitably demand major changes.
In the white system of factory management. Again, this can be foreseen it the
factory managers look in wards and out wards.
Furthermore, the factory itself provide the environment for
it own constituent department and again the interaction of parts within
themselves and with host environment. The interdependency between the two
products important consequences.
1. Changes within the firm affect the
environment to survive therefore, organizations must be prepared to respond to
change and managers must not think as if any decision to affect a change is
only internal
2. Change in the environment, which
imposes change in the organization.
Today one of the most potentially powerful change agents is
the computer, which can permit the consideration problems that are more complex
than any which can be death with. For decision of the managers to be right, the
information normally must be timely accurate etc good information therefore
help to reduce uncertainly. A system that generates good information normally
is seen, addressed or sensed as a group of components that interact to achieve
a purpose such as the production of goods.
1.1 HISTORICAL BACKGROUND OF THE
STUDY
Seven up bottle company development in Nigeria is one of the
argest independent manufacturer and distribution of the well-known and widely
consumed brands of soft drinks in Nigeria. Their brand are pepsi. 7 up Miranda
teen and mountain dew, which we produce and market will dur present 9
manufacturing plants. The also market over 200 distribution centers that we
also call depots spread over the nooks and crane of Nigeria. Our workforce is
currently the in the neigbourhood of 35 employees. The cost associated with a
unit of sale increased in Q2 2009 over the corresponding period in Q2 2008.
This is reflected in the PB1 margain which decreased to 5. 62% in Q2 2009 6.44%
as at Q2 2008, and down from 6.38% as at the end of the financial year in
March, 2009. This shows that the company’s total cost as a percentage of to
stands at 94.38% up marginally from 93.36% recorded in the corresponding period
of 2003. PAT margin currently stands at 4 78%, down from 5.26% in the
corresponding period of 2008, but from 4.78%, down 5.26% in the corresponding
that the percentage of 90, PBT and PAT in the Q2 2009 result to the fully year
audited TO, PBY and PAT for the period ended March to the 2009 show that it
performs better both in log line and botton line in HYI. This can be attributed
to the Christian and new year sales and other ceremonies usually associated
with year end.
To
provide a system that will reduce the over head in maintaining independent date
fills with its associated redundancy and integrity problems.
1.3 SCOPE OF STUDY
The system is a tool for controlling production function
that go on daily in the 7up Company. For this reason aspects of production
control such as scheduling and manufacturing authorization is not covered,
including some aspect of dispatch processes. This system handle the material
(stock) control but does not go into the purchasing and costing. It provides
the necessary report that help in determine when to make purchase it generate
the bills of various models or vehicles produced in seven up.
It monitors and control the activity of various parties to
provide timely information that bears on meeting schedule.
1.4
LIMITATION OF THE STUDY
It is tested and proved, fact that the road to success is
smooth therefore the researcher encounter some hindrances.
SOME OF ITEM WITH ME
1. Time constant
2. Financial constant
1.5
SIGNIFICANCE OF THE STUDY
This research work will help to access and document report
from various departments within the company, which will affect immediate
decision-making. It will also solve the problem of misplacing important
document and accurate recording the system will help to meet up with customer
order and eliminate the problem of broken promises.
1.6
DEFINITION OF PERIODS
For a clear understanding of the terminology and the
following terms are hereby operationally defined.
COMPUTER
It can be defined as devices that accept data in one form
(input and process to produce data in another form output as information.
PROGRAM
This is a set of instruction written in a language of
computer. A program is used to make the computer perform a specific task
calculating interest period to saving account holder.
SYSTEM
These are set of instructions that are to be carried out by
computer in order to accomplish a given task.
HARDWARE
These are those parts of the computer that we touch and see
(physical parts) e.g. keyboard, monitor, mouse etc.
SOFTWARE
These are sets of instructions that are to be carried out by
computer in order to accomplish a given task.