DESIGN
AND IMPLEMENTATION OF HEALTH CLINICAL DATABASE INFORMATION
ABSTRACT
This project was centered on health clinical database
information system. The current process of keeping records of patients is being
operated manually and due to this procedure numerous problem are been
encountered. A design was taken to computerized the manual process in order to
check this problem. The problems were identified after series of interviews and
examination of documents after which analysis was made and a computerized
procedure recommended. This project will also suggest how to successfully implement
the computerized procedure and to overcome the obstacle that would hinder the
successful implementation of the system. The new system was designed using
Microsoft visual basic 6.0 programming language. This language was chosen
because of its easy syntax and features for developing windows based
applications.
CHAPTER
ONE
1.0 INTRODUCTION
1.1 BACKGROUND OF STUDY
Integrated of documentation and knowledge based computerized
services in information system is a tremendous means to help health professionals
in their daily practice and to improve its quality.
Effort is continuously being made in designing and
developing economically and reliable database system to satisfy a clinical
database information system. This project is about the design and development
of a clinical database system for medical management of the federal poly Nekede
medical centre and shows how records and data can be handled and stored within
the system.
The system will store patients’ records, drug inventory and
dispensation as well as other relevant clinical information within the
polytechnic community. The system will be used by the staff doctor, nurses,
clerks, consultants, and other relevant authorities as the demand may be within
the clinic. It will process data speedily and accurately, provide information
when and where required.
The clinical database system will be used to store data,
produce reports and handle management enquires. In clinics that are made up of
doctors, nurses, patient and other personnel staff, an Information system is
required to keep track of the day to day transaction of the clinic and to
improve the communication skills. Also this system will help in highlighting
risk/complex patients for consultant input alert of DNA; easily identify all
patient taking certain medications; monitor frequency of major complication
example peptic ulcer, check for known drug interaction; improve evidence based
practice, record questions in clinic for later response from the team when not
sure of correct reply.
Therefore, it is hoped that the design and development of a
clinical database system would provide a flexible and reliable management of
the polytechnic clinic. This program is carefully design to work in a
standalone system or in a multi-user environment.
1.2 STATEMENT OF THE PROBLEM
It is observed that federal polytechnic Nekede medical
centre most of its record on staff, students, patients, drug and inventory and
dispensary are handled manually. The problems associated with the manual method
include inaccurate data, poor quality of patient care and administrative
inefficiency. The task involved in this design is as follows:
- Careful study of the manual operation of federal polytechnic Nekede medical centre
- Collection of information on general problem confronting the medical centre
- Study the identified problems, design and develop a clinical database system that will help in solving these problems
- Develop computer software that will help in the management if the medical centre.
1.3 OBJECTIVES OF THE STUDY
The primary aim of this project is to design and develop a
clinical database system for federal polytechnic Nekede clinic, which will
achieve the following:
- Improve efficiency and the communication skill in the clinic
- Keep proper patients record, drug inventory, dispensing and efficiency of drug dispensed
- To bring about a computer pollution free environment that will ensure a secured public health of the staff, and the polytechnic community
- To acquire practical experience in the design and development of a clinical database system and other related software
1.4 SCOPE OF THE STUDY
The scope of this project is mainly on patient’s record, the
drug prescription, available drugs, the drug dispensed and the efficiency of
the drug dispensed. The application of query in getting the desired reports on
drug inventory in the pharmaceutical unit.
1.5 LIMITATION OF THE STUDY
- User resistance and misconception: Human fear towards change was a major problem encountered in this course of study; hence vital information was hidden away from me.
- Sensitivity of the study: Due to the sensitive nature of drug management, some secrets were not given out for professional reasons.
- Duration: The time allocated to carry out this project is quite small for adequate and complete investigation of the study.
1.6 METHODOLOGY
The project is carried out, following the appropriate stage
involved in design and development of clinical software. The stage are briefly
discussed below
- Problem identification: The problems associated with the medical centre are first identified. This is done by critically analysis of the existing system.
- Data collection: The data required for this clinical database is obtained by interviewing staff, students and other medical personnel. Also vital information was also obtained in designing and developing a clinical database.
- System modeling: Using relevant facts obtained from relevant sources, the clinical database system is designed.
- System development and implementation: The conceptual designed are developed and implemented as computer program. After the development and implementation, the system is tested to ensure that, is fulfils the objective of the project.
- System installation: The developed clinical database system software is installed on the computer system and made ready for use.
1.7 DEFINITION OF TERMS
History file: This is a master file that contains data antenatal form.
E.g. Patients’ names, address, medical histories, diagnosis, sex, age, type of
admission, drug treatment, data for admission and discharge.
1.8 DATA DICTIONARY
This contains the list of items used and their different
meanings according to how it is applied in the project.
CHAPTER
TWO
2.0 LITERATURE REVIEW
Computer to some people is a terrible complex invention
whose interference in other fields or sectors was regarded as repugnant and
unnecessary and should be therefore be avoided, while to others it a perfect
solution to all problems.
SOLD BY:
No comments:
Post a Comment