DESIGN
AND IMPLEMENTATION OF AUTOMATED EMPLOYMENT DIRECTORY AND LABOUR ASSIGNMENT
SYSTEM
ABSTRACT
Unemployment in the present day Nigeria resulted from
different misgivings and lack of direct approach to by those concerned to
tackle this problem. There are very few jobs compared to the large number of
citizens up to the age of being in the labor force. In recent years, subsequent
governments and corporate bodies have one way or the other tried to device a
means of reducing the instances of unemployment, some being successful to some
extent, and other cases having efforts and huge finances being wasted due to
lack of proper management, supervision and low productive system of operation.
This research project is dedicated to providing a new system that would solve
the problem of linking a large number of unemployed individuals to firms,
companies, institutions or government agencies that are in need of employing
people for one reason or the other. This project has an its case study. The
National Directorate of Employment (Owerri Secretariat). It is an agency formed
by the Federal Government with the sole purpose of employing as many unemployed
individuals into the labor force. This research work, right from its inception
is dedicated to greatly solving the problem of errors prone to the manual
method of collecting, managing and storing of data as well as distributing
processed information. It introduces an electronic means known as Automation, a
process that entails the use of the computer and its accessories to manage data
and information at a more efficient and effective rate. This would be achieved
by introducing an Automated Employment Directory for Labor Assignment System,
hence the project topic: “An Automated Employment Directory and Labor
Assignment System”.
CHAPTER
ONE
1.1 INTRODUCTION
Employment directory is a database of individuals which
provides a list, usually in alphabetical order, of people’s names, contact
address, telephone member and other personal information pertaining to a
particular group of individuals known as applicants. This directory in its
entirety also contains the curriculum vitae (C.V) of individuals grouped under
different sections such as job seekers, short listed candidates for an
interview or qualified persons designated an employment status, as the case may
be.
The directory on its own enables an individual to conduct
his/her search with little or no difficulty since the data he/she needs has
already been formatted in such way the individual can access it with little or
no skill at all. They usually stored under headings and are stored
alphabetically. Technology has evolved in recent times to a level where
competition between existing systems and a new design are accessed and compared
on the basis of reliability, compatibility, output design, speed and
efficiency, not to mention sophistication. Globally, people are mostly
interested in systems that can match any standard found in the international
market. This project, however is designed to assist employment agencies in
their bid to connect firms or organizations in need of some qualified
individuals to fill up vacancies in their establishments and also to help the
public to be well informed of such vacancies, hence the choice of the National
Directorate of Employment as the suitable case study for this research project.
1.2 PROJECT BACKGROUND
This project is based on the gradual process of completely
transferring the manual procedure of both managing and keeping track of
information and data related to employment delivery. It is a project totally
dedicated to the use of computes otherwise known as automation, to provide a
faster, more reliable and accurate process of managing information that is
greatly essential in the provision of employment by agencies working for the
government or contracted by private bodies.
Computers these days are gradually being introduced into
every sector of our daily lives and its use in managing database cannot be over
emphasized computers have come a long way to replace human limitations such as
the ability to perform series of repetitive activities without easily getting
weary or entirely bored. It has saved human energy and performs its activities/functions
much faster than the average man.
The few mention advantages and merits of automating
(computerizing) certain activities over the usual manual way of carrying out
similar activities, necessitated in making the researcher to propose and design
a new system, which will entail the gradual change from the existing system of
manually managing data to an automated system of the same procedure. This will
culminate in the use of the computer to:
- Input data
- Process the data into information
- Store the information and
- Access the information at any given time and place whenever the need arises.
Although
risks cannot be entirely ruled out when using an automated system, they are
however minimal and highly reduced to the lowest level when qualified personnel
are left to manage and administer the system.
1.3 STATEMENT OF THE PROBLEM
The primary function of the National Directorate of
Employment is to assist the government in providing jobs for the unemployed
populace and also to help the unemployed to get gainful employment for their
benefit. There are several problems hampering the link between qualified
personnel (or applicants) to some potential employers. Most of such problems
could be summarized into:
- Staff attitude: The nonchalant attitude of some of the staff of certain employment agencies towards requests due to some difficulty they encounter while collecting data. Also, some departments working under the some establishment view themselves as independent entities, hence the flow of information suffers serious setbacks and access to central data becomes increasingly difficult.
- Processing: Poor data and information flow within the organization due to job duplication and role redundancies and also errors due to incorrect entries from the public.
- Time wastage: Time wastages could be due to lack of well defined information retrieval system, insufficient number of employed personnel and delay caused by postal services. This affects the overall response time of the agency to requests.
1.4 OBJECTIVES OF THE PROJECT
This research project, from its inception, has some targeted
goals and objectives which serve as the motivating factor behind the system
design. The new design is intended to be efficient in the sense that the
database software would produce the required results satisfactorily without
much time and valuable resources being wasted. The project would in turn be a
reliable substitute in the sense that the usual process of manually storing,
retrieving already collected data or information, which are at most times error
prone due to human factors such as commission, are eliminated. In other words,
the project is aimed at improving information and data flow within the agency
(directorate). Usually, the research project is designed to eliminate
problems/set backs which the commonly experienced due to physical management
and processing of documents (files) of respective requests made to the agency.
From the above mentioned points, its objectives could be summarized into:
- Improving data and information flow (management) within the system
- Providing high quality information for the management to make relevant decision at the needed time.
- Reduction of unnecessary time wastages incurred during data processing, storage and retrieval of information.
- Making for a quicker response time.
- Linking qualified personnel to vacancies and also providing organizations with suitable applicants for vacant posts in their establishment.
- Reduction of clerical operations amongst other benefits.
1.7 SIGNIFICANCE OF THE PROJECT
The application of an automated employment directory and
labor assignment system will make for an improved public awareness due to the
fact that information processed or possessed by the agency (directorate using
the this new system) would readily be liked to the internet or the ‘yellow
pages’ as the case may be information generated can be readily passed unto the
public at a faster rate as would have been the case using the existing system.
In other words, rapid technological changes and improvement gave rise to a required
standard for which this new has attained.
Furthermore, this new system will lead to a greater
patronage from the public due to the efficiency and reliability associated with
the system. This project signifies a design which serves as the best feasible alternative
solution to the problem of data management and control. The new model and its
software capabilities enable the new system to be implemented in any part of
the world due to the portability nature of the software.
Finally, this study serves as a good reference material for
researches in the field or those undertaking a similar research.
1.8 RESEARCH METHODOLOGY
The research method adopted in this research project is as
follows:
1. Interview: Certain workers and employees at
the personnel department of the National Directorate of Employment were
interviewed; necessary information and raw data were both collected and noted.
Such information played a great role in the development of the new system.
2. Investigation and analysis of the
present system:
Here, the researcher studied the existing system as regards to its set
objectives, its functions and managerial capabilities.
3. Observation: The processes and procedures
involved in data and information flow in the agency were observed. Also, their
relationship with the intended results were observed, compared and carefully
noted.
4. System development: The new system was developed
firstly by carefully analyzing the problems evident in the existing system,
proffering solutions and therefore, the researcher went ahead to design a model
for the new system. Subsequently, the developed system was tested accordingly
with data for which required solution/results were previously achieved using
the manual system of operation. Both results were compared and it was found
that the solutions were similar but with the new solution, having me the target
with a higher degree of accuracy, at a quicker response time, improved
management control and also at a reduced cost.
1.8 SCOPE OF THE PROJECT
This research work is dedicated to bridging the gap between
the unemployed (job applicants) and prospective employers. It is purely limited
to the use of an employment directory to link applicants to various vacancies.
This project will only cover the area of using the directory database to
provide the necessary information required by an organization to employ
qualified individuals into positions needed to be filled. After the analysis of
the existing system, some areas were noted for improvement while some sensitive
areas demanded conversion, which could best be handled by a computer method
i.e. automation.
It must be noted however, that this project or model does
create job opportunities by design but provides an easy and more efficient
access to information needed for smooth employment delivery and labor
assignment it is therefore hoped that future researchers will carry out further
work on this subject.
1.9 LIMITATION OF THE PROJECT
There were certain constraints encountered while the
research for this project was being carried out. Listed below are some of the
prominent ones. They are:
Financial constraints: Limited source of funds as regards the high rate of
transportation culminated in the choice of the National directorate of
Employment as case study.
Time:
The time needed to travel outside the school environment to other places
(distant places in particular) in search for the required data was limited;
this also led to the choice of N.D.E Owerri as case study.
Privacy of data: Due to the sensitive nature of certain information, the
researcher was not able to get certain personal information about some
individuals from the agency.
Staff attitude: Some members of staff of the agency were not readily
helpful when approached for specific information. This was another source of
hindrance to the completion of the project.
Nevertheless, as there were hindrances and limitations
arising from different quarters, the researcher was able together all the
necessary information required for the completion of this project.
No comments:
Post a Comment