DEMOCRACY AND ELECTORAL MANIPULATION
(A CASE STUDY OF KACHIA LOCAL GOVERNMENT AREA COUNCIL ELECTION 2008)
ABSTRACT
Election in its normal democratic sense
is a way through which the electorates in any society appoint their
leader or representatives to exercise political power on their behalf.
The conduct of any election should be tree and fair and reflecting the
with of the people but this could not be attained in the 2008 Kachia
Local Government Election. The election was characterized by all kinds
of activities that were inimical to success. These include thuggery,
looting, arson killing, destruction of properties and other form of
electoral manipulation. This research was therefore conducted to examine
Democracy and electoral manipulation: A case study of Kachia Local Government Council Election of 2008.
to guide the study, research questions and hypothesis were formulated.
The population for the study which was drawn from all the (12) electoral
words that make up the Local Government, cut across age, sex,
occupation, class and so on a total number of (40) questionnaires were
administered or distributed to the respondents in the electoral words of
the Local Government simple percentage (frequency of concurrency). Was
use to analyze data collected. There is a relationship between poverty
and violence in Kachia Local Government council election of 2008. The
results of the funding was positive showing that there is relationship
between poverty and violence in the Kachia Local Government Council
Election of 2008.
CHAPTER ONE: INTRODUCTION
1.1 BACKGROUND TO THE STUDY
The hundred and twenty-five years
between the French Revolution in 1979 and the outbreak of the World War
in 1914 remarkable in the history of government for the development of
the rise of democracy (Appadorcil, A, 1978, 233) the man emergence of
democracy as a dominant other things been seen as a pivotal instrument
of advancing and maintaining progress in some parts of our society.
Democracy is a continuous process and
struggle towards actualization of certain values freedom, equality and
justice. No matter how democracy is understood, interpreted and
practiced, it has a philosophical justification premised on certain
cherished human values and ideas. These values and ideas. These values
are freedom, equality and Justice (Nnoli O. 1986, 160).
Democracy as a concept does not have a
generally agreed definition. It is defined differently by different
scholar based on different perceptions of concept.
Democracy is a term that is used to
describe an idea, process a series of event leading to change or course
of action or a system of government. As an idea, process or system,
democracy entrenches and expand the right, ability and capacity of
people in any community big or small, from the most complex to the least
complicated, to take control of their lives, through participating, as
fully as possible in discussion and decisions on issues that affect them
and their community.
Democracy can also be said to exist
where the leaders of apolitical system are elected by competitive
election in which the bulk of the population have the opportunity to
participate.
Democracy is a form of government where a
constitution guarantees basic personal and political rights, fait and
free election and independent courts of law. It could also be seen as a
political government either carried out by the people or the power to
government is granted to elected representatives. It is a government of
the people exercised either directly or through elected representatives.
Democracy may also be continuatives. Democracy may also be considered
as a primary sources of power.
It also seen as majority rule. Democracy
from a different point of view could be understood as a principles of
social equality and respect for the individual within a community.
The Kachia Local Government Council
elections of 2008 have been associated with turmoil, killing,
assassinations and wanton destruction of properties.
Kachia Local Government Area is a constituency located in the southern part
Since not much work has be done on the
2008 Kachia Local Government election manipulation, it is important to
conduct this research in order to provide researched document on
manipulation with a view of knowing the nature of manipulation in the
local government.
Since this research work is aimed at
assessing the level and dimension of the 2008 election manipulation. An
issue of this magnitude needs serious and intellectual attention since
the key issue in democracy is about how good government can be
entrenched. There is therefore, the need for intellectuals to look into
the problems of election manipulation since election is central to the
realization of democratic values and goals.
1.2 STATEMENT OF PROBLEM
The Kachia Local Government Council
election of 2008 was married by widespread election manipulation. This
degenerated 60 violence of wanton destruction of lives and properties.
The focus of my study. Therefore is to examine the nature and conduct of
the elections which resulted into violence with greater objectivity and
merit, so much so that glaring irregularities were recorded. This
situation generated grievances and resentments and subsequently
threatened the peace of the area.
1.3 OBJECTIVES OF THE STUDY
The study seeks to achieve the following objectives:
- To suggest ways through which election manipulation could be reduced to the minimum level.
- To asses the level and dimension of the 2008 manipulation of Kachia Local Government Council Election.
- To know the level and dimension of Youth’s involvement in the 2008 election manipulation.
- To find possible solution to political apathy in Kachia Local Government of Kaduna State.
- To find possible solution in order to reduce political violence in the Kachia Local Government in Kaduna State.
The study is aimed at examining the
election manipulation in Kachia Local Government Council election of
2008. It will be difficult and out of place to extend the study beyond
the Kachia Local Government of 2008. because they are many constraints
that hindered me from expanding this project work such constraint are:
Time constraint has constituted one of
the major factor in this research work this is because this research
work is expected to beat a deadline in the presentation of the project
which can hinder this work for further or research work.
Scarcity of resources. (Both human and
material). These may include difficulty in laying one’s hands on some
crucial data and documents which are often times touted as secret or
official documents. It may also include financial constraint because
every stage of the research work from the field to the report writing
and the typing and blinding of the project could be very demanding
financially.
In different and unco-operative reaction
of certain respondent who may refuse to give coherent answers to one’s
question or even those who may be unwilling to spare time to fill in
simple questionnaires.
1.5 SIGNIFICANCE OF THE STUDY
Since not much has done on the 2008
Kachia Local Government election manipulation. It is importance to
conduct this research work with view to knowing the nature of
manipulation in the Local Government election in general and kachia
Local Government in particular.
Since this research work is aimed at
assessing the level and dimension of the 2008 election manipulation in
kachia Local Government Area, it will serve as a means of educating and
disabusing the minds of the populace on the negative acts election. The
2008 kachia Local Government election was married by Widespread violence
due to manipulation. As issue of this magnitude needs serious and
intellectual attention since the key issue in democracy is about how
governance can be entrenched. There is therefore the need for
intellectuals to look into the problems of election manipulation since
election is central to realization of democratic value and goals.
1.6 STATEMENT OF HYPOTHESIS/RESEARCH QUESTIONS
- What is the level of election violence in the kachia Local Government 2008?
- What is the nature of election manipulation in the 2008 kachia Local Government Council Election?
- Why did people resort to violence to register their resentment
- What are the major causes of violence in kachia Local Government Council Election 2008?
1.7 DEFINITION OF KEY CONCEPTS (OR RELEVANT TERM)
- DEMOCRACY: Is a form of government in which the people exercise their governing power either directly or through representatives periodically elected by them.
- ELECTION: Is the act of electing can debates to represent the people of a given country in the parliament, the executive and possibly into other arms of government as stipulated in the constitution of particular country.
- LOCAL GOVERNMENT: Local Government or Local Authority is a government set up by a central authority or state government as a means of ensuring effective administration at the grass root. In other words a local government is the type of government that help either the central or state government to carry out effective administration of the country at the grass root level.
- MANIPULATION: In term of democracy it implies the act of influence electoral process in order to favour groups or regions.
- CONSTITUENCY: An electoral constituency is simply an electoral district or an area from which one or more members or representatives are elected into political office. The division of a country into constituencies is ratered to a delimitation and it make for equitability in the allocation of parliamentary seats.
- WARD: Is a geographical unit for electing local government chairman and councilors.
1.8 ORGANIZATION OF THE STUDY
The chapter one, introduction, which
include the background of the study statement of the problem, objectives
of the study, the scope and limitations of study, significant,
statement of hypothesis for research questions, and definition of key
term.
Chapter two literature review which
include concept of democracy history of democracy in Nigeria, concept of
election history of kachia Local Government and location of kachia
Local Government.
Chapter three research methodology which
include research population and sample, research design and approach,
methods of data collection administration of instruments method of data
analysis and problems of methodology.
Chapter four data presentation and
analysis which include presentation of data analysis of data, test of
hypothesis and discussion of finding.
Chapter five summary conclusions and recommendations. Which include summary of findings conclusions, and recommendation.
SOLD BY:
No comments:
Post a Comment