COMPUTERIZED GUEST INFORMATION TRACKING SYSTEM
CHAPTER ONE
INTRODUCTION
1.1 BACKGROUND OF STUDY.
Information technology is an essential
tool to guest tracking. The faster and more effectively it works, the
safer our business management is.
Information system (IS) refers to a system that comprises of persons,
data records and activities that process data and information in an
organization, and it includes the organization‟s manual and automated
processes. In a narrow sense, the term information system refers to the
specific application software that is used to store data records in a
computer system and automates some of the information-processing
activities of the organization.
The term information technology has
ballooned to encompass many aspects of computing and technology, and the
term has become very recognizable. The information technology umbrella
can be quite large, covering many fields. IT professionals perform a
variety of duties that range from installing applications to designing
complex computer networks and information database.
Since the first wave of computerization
in the 1970‟s, the implementation of information technology within
policing has been questioned and often met with resistance. The
development of an information technology strategy must be viewed in the
context of increasing expectations and pressure for reform within
organizations.
The business environment in which banks
operate is changing; increased demands for efficiency has led to
information technology being recognized as a valuable and innovative
addition to guest tracking system.
Over the last decade, computer and
telecommunication technologies have developed at an extraordinary rate.
Increased computer power, advances in data transmission, attractive and
user-friendly graphic interfaces present bank with unprecedented
capacity to collect, store, analyze and share data with stakeholders
inside and outside of bank.
Historically, the innovation of
information systems has served as the catalyst for dramatic changes in
the organization work and has presented both opportunities and
challenges to operators.
Some banks have made tremendous efforts in creating databases for guest information system for security purposes.
1.2 STATEMENT OF PROBLEM
Keeping record of visitors in a bank has
been a big task for the management. Often the identity of the guest is
forgotten as soon as he/she leaves the bank. This is a big security risk
as there is need to maintain an automated record of daily visitors to
the bank in case security issues arise.
1.3 PURPOSE OF STUDY
The purpose of this study is to design
software that will serve as an electronic register to keep record of
daily guest to the bank. The software will maintain a centralized
database system for the purpose of information sharing.
1.4 SIGNIFICANCE OF THE STUDY
The software developed will be beneficial to the bank management in so many ways:
1. Maintain a centralized database for Guest records
2. Retrieve previous information on guests from the system easily using serial query language
3. Have a good surveillance on the guests information for security purposes
4. Know the number of guests they receive on daily basis
5. Track the frequency of a guests visitation to the bank
1. Maintain a centralized database for Guest records
2. Retrieve previous information on guests from the system easily using serial query language
3. Have a good surveillance on the guests information for security purposes
4. Know the number of guests they receive on daily basis
5. Track the frequency of a guests visitation to the bank
1.5 OBJECTIVE OF STUDY
The purpose of this research work is to develop a system that should be able to achieve the following:
1. To provide an electronic register to keep record of guest visit to the bank
2. To produce a system where information and output report will be produced much faster, more accurately and more detailed.
3. Keeping record of total number of guest coming to the bank on daily basis.
4. Keep track of old guest in case of any security breach.
5. Provide password to prevent unauthorized users from accessing and manipulating information.
1.6 SCOPE OF THE STUDY
This research project covers only
records on the banks managers guest and some other management staff, as
it will be difficult to maintain guest record on every staff of the
bank.
1.7 CONSTRAINS AND LIMITATION
Due to time constraint and limited
resources, the use of biometric could not be incorporated into the work
for authentic identification of guest.
1.8 DEFINTION OF TERMS
ARRIVAL FILE: This is
master file consisting of the guest name, companies name and address,
state, country, nationality, profession etc. which also include the mode
of payment to be used by the guest.
DATABASE: This is the collection of related data/information
GUEST: This guest are used in the contest of the work refers to individual, companies or corporate bodies that visited the bank
SOFTWARE: This is the logically written instruction that control the hardware.
No comments:
Post a Comment