COMPUTER BASED DRUG INFORMATION MANAGEMENT SYSTEM AND DISTRIBUTION TRACKING SYSTEM
(UNIVERSITY OF NIGERIAN TEACHING HOSPITAL (UNTH) ENUGU)
CHAPTER ONE
INTRODUCTION
1.1 BACKGROUND OF STUDY
Computerization is defined as the
control of processes by computers and its peripherals. Today it would be
difficult to think of any process, business or action that could not
have profited from the numerous benefits of the computer system.
Controlling process or devices with computer started long ago since the
invention of computer. In the 20th century inventors tried to make
processes easier with the use of computers. Secondly computerization has
been greatly applied or used in controlling process that requires
frequent action such as drug procurement, drug management, drug tracking
and drug distributions in hospital management information system in
pharmacy departments of hospitals.
This project which is drug procurement
and distribution tracking system provides a computer based information
management system in a Pharmacy Department of the University of Nigerian
Teaching Hospital (UNTH) Enugu by designing a cost effective, user
friendly application, incorporating key attributes of data integrity and
system security suitable for use in the pharmacy department of the
hospital using Microsoft Access software in developing the database and
visual basic as the programming language. The overall aim of this
project is to optimize time and material in the processing of data
needed for effective operation of large pharmacy department of a
hospital. By this approach, data integrity, data redundancy, and
consistency will be ensured.
Drugs are the chemical substances that
are administered to patients for curative purposes and prophylaxis. It
can also be known as a medicine, because it is the essential part of
peoples care.
The ability of the computer to store and
retrieve information at a very fast and efficient rate makes its
application useful in management operations. Drug management involves
drug procurement, drug distribution, drug tracking and its information
management. Drug distribution is concerned with distribution of drugs
within the different medical units or departments in a hospital, while
drug procurement is concerned with the purchasing activities of the
drugs by the pharmacy department of the hospital. In the same vein, drug
tracking is concern with the continuous monitoring of the actual
quantity of drugs held in the hospital pharmacy or any other drug
warehouse /store. It also controls the stock level.
Pharmaceutical unit in a hospital is
concerned with drug management activities. They carry out the
responsibility of making appropriate selection and drugs used by
formulating an annual, monthly, weekly or daily list of drugs
requirement and management reports. However, in some hospitals today,
some pharmacists still use the manual system of operation which can lead
to inappropriate drug management errors due to problems of handling
voluminous file within a short period of time. This could make data to
be easily inaccessible and also delivery of drugs can lead to
misplacement of patients’ files.
1.2 STATEMENT OF PROBLEM
Drug procurement, tracking, distribution
and information management in this regard are routine processes carried
out in various hospitals across Nigeria. It is a common place to
observe that these routine processes are still preformed manually or are
minimally computerized even in our Teaching Hospitals.
This manual approach to these routine
operations has a lot of problems associated with it, ranging from poor
handling of drug data of patients, lack of good storage information
system for drugs and drug dispensary, delays, to the difficulty in
retrieving information on drugs and patients’ records. In view of all
these problems, it becomes necessary to develop a computer based drug
information management system and distribution tracking system. This is
what this research project is set to address by computerizing the
routine processes in our hospitals and in particular that of Pharmacy
Department of UNTH Enugu.
1.3 OBJECTIVES OF THE STUDY
The aim of this research project is to
design and implement a computerized drug information management system,
drug procurement and distribution tracking system. This includes:
(i). To order for drugs without mistake of procuring more than required.
(ii). To take good stock of drugs.
(iii). To prevent dispensary of expired drugs
(iv). To ensure accurate keeping of records of drugs
1.4 SIGNIFICANCE OF THE STUDY
The benefits derivable from this work include the following:
(i) It will provide reliable healthcare services.
(ii) It will guarantee hospital management and patients of genuine and safe drugs.
(iii) It will ensure an efficient and standard drug dispensary system.
(iv) It will provide a data base for stock taking of drugs procured and dispensed any moment.
1.5 SCOPE OF THE STUDY
This research work will cover only the
Pharmaceutical Department of the University of Nigerian Teaching
Hospital (UNTH) Enugu. It will present an up to date and comprehensive
design of the following:
(i) Planning and control system which includes inventory control and drug distribution
(ii) Drug procurement procedure in a hospital.
(iii) The expiry status of each drugs at any point in time
(iv) The Database of all kinds, types and names of some drugs that would be store and operate on.
1.6 ASSUMPTION
It is assumed that all the information
gathered with the respect to inventory control is correct as implemented
by the university of Nigerian teaching hospital (UNTH) Enugu.
1.7 LIMITATIONS OF THE STUDY
1. Time constraint; There is limited time go and meet the hospital pharmacist for proper information.
2. Due to the sensitive nature of
organizational information, there was reluctance to release vital
information which may jeopardize the security of the organization.
1.8 PROJECT REPORT ORGANIZATION
This research project covers almost all
you need to know about drug procurement and distribution tracking
system. Chapter one is the introduction and it covers the statement of
problem, objectives of the study, significance of the study, scope of
the study, assumption, limitations of the study and definition of terms.
Chapter two is the literature review; it gives the detailed meaning of
every associated word in my topic. Chapter three is the design and
methodology; this involves the operation of the existing system and the
method used. Chapter four is the system analysis and implementation;
which talked about the operation of the proposed system. Chapter five is
the summary, recommendation and conclusion.
1.9 DEFINITION OF TERMS
Database: A collection of logically related data to meet the information need of organization.
DBMS: Database Management Software that enable the user to define, maintain Control the database.
Application Program: A computer program that interacts with the database.
MENU: This is a list
of options presented on the screen with each option identified by short
code followed by longer description of its purposes.
Drug: It is referred to as a medicine or chemical substances that are administered to Patients for curative measures.
Pharmacy: A placed in a hospital where medicine or chemical substances are kept, stored and prepared.
Flowchart: A diagram that shows connection between the different stages of process of the system.
Primary Key: The candidate key that is selected to identify the individual within the relation
Foreign Key: An attribute or a set of attributes within one relation that matches the candidate key
Relation: A relation is a named table with columns and rows
Attribute: An attributes is a named column of a relation
Domain: A set of allowable values for one or more table
Null: it represents a value for an attribute that is currently unknown or not applicable
Database design: The process of creating a design that will support emprise mission statement and mission required database e system.
Software: These are program for computer which allows certain specific task to be accomplished e.g. word process etc.
Hardware: Computer equipment used to perform input processing and system output activates.
Management information system:
collection of people, database, and devices produced to use in
providing routine information to manager and decision makers of the
organization.
SOLD BY:
No comments:
Post a Comment