COMPUTER APPLICATION IN BANKING OPERATION: PROBLEMS AND PROSPECTS
(A CASE STUDY OF U.B.A LOKOJA)
CHAPTER ONE
INTRODUCTION
1.0 INTRODUCTION
For the past hundred years, organizations have tended to bear
the burden of maintaining, coordination and control have become formidable. The
larger organization tended to have more parts and each new parts where
interrelated with the others maintaining these relationships required the
transmission achieving its objectives as it grow, management and was required
to sanction ever increasing amount of data handling work. Larger patronage to
supervision and management personnel were designated to transmit and the
process screen condense and elaborated data from the various parts of the
organization.
Improved types of data processing and communication equipment
were installed and improved method for using the equipment were put into use.
Organizational functions were re-defined to reduce the burden of communication
and data processing.
In most business organizations including banking acquisition
of computer application often follow the need to ease the bottleneck as data
processing functions which build up as much organization grow larger more
complex in form and operation.
Having introduced computer application to its operation
depending on the degree of sophistication and application of such application,
a number of changes rise which involves the organization in a constant process
of adjustment.
Within such an organization some study and analysis must have
been made before that computerization project to work out its costs, benefit,
and nation hence, justify the investment. Also, the project post independent
reviews are undertaken to evaluate the efficiency of the implementation system
as well as their continued statist action of user expectation.
The researcher will investigate the impact both positively
and negatively computer has made study of United Banks for Africa (UBA) the
application which are then used by managers at all level, in all function to
make timely and effective decision for which they are responsible. United Bank
for Africa has now embarked on computerization of all its activities.
1.2 BACKGROUND OF THE STUDY
The problem of effective computer system in banking operation
has robbed the people of essential amenities as a lot of money here been cost
to fraud, mismanagement of financial and material resources also as a result
most United Bank for Africa are over staffed because recruitment has not been
based on the manpower needs of the banking operation where most workers were
employed based on man know man and through political connection without any
recruitment exercise.
Its therefore in the light of the above that it has become
imperative to research on computer application in banking operation with a
particular reference to Laokoja United Bank for Africa. This research finding
and recommendations would offer useful suggestions to solve the current or
present problems of ineffective computer application in banking operation thereby
ensuring prudent use of resources of our banking operation.
1.3 STATEMENT OF THE PROBLEM
The problem of this study is to determine the impact which
computerization or banking services had on an organization as (U.B.A) in its
services to customers. Another problems is that restrains on international
exchange limited by the economic environment (SEEM) limiting the amount of
material and services (computers, air conditioners generators, spare parts
training etc) that can be obtained from abroad.
Also, there is adequate of supply skilled talented and
creative professional to cope with present needs.
1.4 PURPOSE OF STUDY
The purpose of this study are as follows:
1. To
find out the impact of computerization of banking activities in an
organization.
2. To
evaluate the problem facing the application of these computers
3. To
use practical utilization of computer in all faces of U.B.A. banking system to
explain if it has helped in improving the services of the bank to the customer.
1.5 SIGNIFICANCE OF THE STUDY
Computer has come along way a very short time. It come into
being to meet the needs or scientific computations, business man has learn how
to apply them in projectable ways Nigeria cannot be left behind when one think
of the impact it has for the use of computer has made in the development of
business.
The rules guiding objectives are as follows:
1. To
private exercise of standard reputation comparable to the best available else
wherein the world.
2. To
be among those to introduce into Nigeria the more recently advise development,
technological etc in the banking industry world wide.
3. To
be amongst the more efficient banks in the industry United Bank for Africa Plc.
Of Nigeria has achieved the size complexity of structure and
operation and sophistication in application of computer technology to make a
bread study necessary.
The computerization programme past prevent and planned have
and will continue to have impacts on the total environment of UBA the need
arises for such impact to be measured and confluence predicted for the benefit
of further organizational sign.
1.6 SCOPE AND LIMITATION OF THE STUDY
The study is limited to the organization environment or
United Banks for Africa (UBA) attention will be directed mainly at the computer
sector of the banks, computerized. This is no research work that is free from
hazards and hardship this to the researcher. However, some of the limitation
are as follows. Such as financial constraints, time factors and inadequate text
books in the polytechnic library, this is some of the problem confronting the
researcher in the soft of writing this project. Even go the bank to collect
some information regarding the computer application they will not list to you
these now more. The research work so no difficult and hard for one to collect
some related information for research work.
More also, money is one of the problem which a research is
confronted within carrying out the research work involving the used of money in
almost all process even the cost of transportation which has made the research
so hard in terms of collecting some relevant information and data therefore,
finance is one of the problems which made it impossible for the researcher to
get more data relevant to the project.
Time is another problem that limits the research work, time
is not enough since the research work has to be carried out together with the
class work. This makes research work a bit difficult.
More also, money is one of the problem which a researcher is
confronted within carrying out the research work involves the use of money in
almost all process even the lost of transportation which has the research so
hard in terms of collecting some relevant information and data, therefore,
finance is one of the problem makes it impossible for the researcher to get more
data relevant of the project.
1.7 RESEARCH QUESTIONS
The research questions most of which as follows:
1. To
what extent has the banks benefited from computerization rather than manual
system?
2. How
far has computerization brought changes in the work of the bank as a whole have
any function been eliminated or some restricting made?
3. How
far has computerization of all banking operations gone in eliminating time
waiting by customer in banking halls?
Pattern adopted in the research study is that respondents are
mainly adults who are above age of 22 years (Hypothesis is this research shall
be tested) below with the view to know the validity of the research.
Computer application has no effective impact on the banking
operation. Computer application has an alternative impact on banking operation.
1.8 STATEMENT OF HYPOTHESIS
A hypothesis is a simple statement that gives the readers the
writer views point the writing of a hypothesis should begin after the writer is
done choosing a topic. The most important characteristics of the hypothesis is
that it provides an opinion. It is not a bland, factual statement. The
hypothesis is a statement that should encourage the reader to think about what
is written to question it to doubt it or even to agree with it.
1.9 DEFINITION OF TERMS
The related term of a used in the study are as follows:
Computer: A computer is an election machine processing internal
storage.
Capability: A storage pgoramme of instructions and the capability
for modification of the set of instruction during execution of the programmes.
Data: A collection or elements is made up of numeric, alphabets or
special character denoting facts, thus, date are unorganized facts.
Programme: A programme statement of it is an expression that instructs
the computer in details as to specific operation it is to perform or the order
in which it is to perform operation.
Input: Any form of input medium containing date is used to provide
the computer with data for processing
Hardware: Hardware to the name given to all the physical devices
finding in a computer system. In the computer room; the devices look like
large, insert, metal cabinet and there is little visible evidence of the
phenomenal speeds of which data is being processed within some of these
hardware an optional reader, and reader terminal keyboard.
Software: This is the name given to the determine within for the
computer what determine how data is handled by hardware to achieve desire
results in general software consist of the programme used by a computer
prepared either by the manufacturer or user, but specifically, the term
embraces the operating system application programme supplied by computer
manufacturers users.
Flow chart: A graphical representation of picture in a computer
programme symbolic shapes, such as rectangles and diamonds are used to indicate
the characteristics meaning of the steps. And flow chart is used to represent
particular activities involved in a system in a particular fashion
No comments:
Post a Comment