COMPARATIVE EVALUATION OF THE EFFECTIVENESS OF SOME PRESERVATION TECHNIQUES SUCH AS SMOKING, SUNDRYING AND SALTDRYING ON CATFISH (CLARIAS) INOCULATED WITH FISH BEETLE (DERMESTES MACULATES)
ABSTRACT
Fish is an important source of protein
for humans and there has been efforts to preserve this valuable source
of essential amino acid. The clarias spp purchased from Kwato pond in
nasarawa were deride through, sundrying smoking and saltdrying and
infested with an insect beetle D. maculatus., and the effect determined
through weighing the average weight loss and culturing of the sample to
determined the bacteria and fungi load. The average loss in weight for
that preserved by saldrying was 75g while the bacterial counts was
18cfu/ml and it shown very few fungal growth, the average weight loss
of fish preserved by smoking method was 61.2g while the bacterial count
was 48cfu/ml. The average loss in weight for the fish preserved by
sundrying was 36.1g while the bacterial count was 76cfu/ml with heavy
fungal growth. This result shows that saldrying is the method of
preserving fish for a short period storage. Therefore salting drying
method should be encouraged and handling should be done properly to
avoid contamination before, during and after the process.
CHAPTER ONE
1.0 INTRODUCTION
Fish is an important resource for humans
worldwide, especially as food. Commercial and subsistence fishers hunt
fish in wild fisheries (fishing) or farm them in ponds or in cages in
the ocean (aquaculture). They are also caught by recreational fishers,
kept as pets, raised by fish keepers, and exhibited in public aquaria.
Fish have had a role in culture through the ages, serving as deities,
religious symbols, and as the subjects of art, books and movies (Yusuf,
2001).
There are different species of fish but
my main concern in on Clarias commonly known as catfish. They are found
in inland waters and is one of the most widespread catfish genera in the
world. The genus is found in Southeast Asia and East Asia westwards
through India and the Asia Minor to Africa. The diversity of these
catfishes is highest in Africa. Some (notably the walking catfish) have
become pest species where they have been accidentally introduced
(Hadiaty, 2011)
Clarias species are recognized
by their long-based dorsal and anal fins, which give them a rather
eel-like appearance. These fish have slender bodies, a flat bony head,
and a broad, terminal mouth with four pairs of barbels. They also have a
large, accessory breathing organ composed of modified gill arches.
Also, only the pectoral fins have spines (Rattagool, 1988).
There are a number of techniques that
have been or are used to tie up the available water, techniques such as
drying, salting and smoking have been used, and have been used for
thousands of years. In more recent times, freeze-drying, water binding
humectants, and fully automated equipment with temperature and humidity
control have been added. Often a combination of these techniques is used
(Froese et al., 2011).
Salting is the preservation of food with
dry edible salt. It is related to pickling (preparing food with brine,
i.e. salty water), and is one of the oldest methods of preserving food.
Salt inhibits the growth of microorganisms by drawing water out of
microbial cells through osmosis. Concentrations of salt up to 20% are
required to kill most species of unwanted bacteria. Smoking, often used
in the process of curing meat, adds chemicals to the surface of meat
that reduce the concentration of salt required. Salting is used because
most bacteria, fungi and other potentially pathogenic organisms cannot
survive in a highly salty environment, due to the hypertonic nature of
salt. Any living cell in such an environment will become dehydrated
through osmosis and die or become temporarily inactivated. Available
water is necessary for the microbial and enzymatic reactions involved in
spoilage (Mwita et al, 2008).
1.1 WHY AND HOW DOES FRESHLY CAUGHT FISH SPOIL?
Freshly caught fish spoil easily and
need to be properly preserved. The three most popular methods of fish
preservation are sundrying, smoking, and sundrying. Top quality fresh
fish are essential for fish preservation. Of all flesh foods, fish is
the most susceptible to tissue decomposition, development of rancidity,
and microbial spoilage. Keep freshly caught fish alive as long as
possible. A metal link bag will permit fish to remain alive longer in
the water than a stringer. Spoilage and slime-producing bacteria are
present on every fish and multiply rapidly on a dead fish held in warm
surface water. Fish begin to deteriorate as soon as they leave the
water. To delay spoilage, clean the fish as soon as possible (FAO,
1981). Thorough cleaning of the body cavity and chilling of the fish
will prevent spoilage. Fish spoilage occurs rapidly at summer
temperatures; spoilage is slowed down as freezing temperatures are
approached (Leconintre G. et al 2007).
1.2 INFESTATION OF D.Maculates ON FISH
Blatchford (1962) observed that insect
infestation is more likely to occur on fish under the influence of warm
temperature and high moisture content. The studies have been recorded
mainly with the biology of D.maculates as Usip and Etimibe 38 a pest of
smoked fish. Lale and Sastawa (1996) and Odeyemi et al. (2000) put the
losses due to susceptibility to pest infestation and deterioration of
smoked fish products at 50% during storage, leading to reduction of
nutritive quality of smoked fish. stated the control measures against
insect infestation of smoked fish which include preserving in the oven
at a minimal temperature and also the use of harmful chemical
insecticides such as heptachlor to keep away insects and other pests.
Spoilage is a metabolic process that causes food to be undesirable or
unacceptable for human consumption due to changes in sensory nutritional
characteristics (Doyle, 2007). Since fish is highly susceptible to
deterioration immediately after harvest and to prevent economic losses,
the processing and preservation of fish is of utmost importance (Okonta
and Ekelemu, 2005). Odeyemi (2000) noted that smoke-dried fish is one of
the highly digestible and respectable sources of proteins and essential
minerals in the tropics but it is highly susceptible to insect pest
infection.
In recent years, there have been
increasing and concerted efforts directed at developing natural pest
management control agents that are relatively cheap, safe, biodegradable
and environment friendly as alternatives to synthesized insecticides
(Boeke, 2001). Ayuba and Omeji (2006) stated that the gap between demand
and supply of fish is widened due to poor post-harvest handling, lack
of processing and storage facilities. The Dermestes species eat away the muscles leaving the skeletons when cured fish are stored for long periods. Lale and Sastawa (1996) and Odeyemi et al.
(2000) put the losses due to susceptibility to pest infestation and
deterioration of smoked fish products as 50% during storage, leading to
reduction of nutritive quality and market price of smoked fish. Oke et al.(2014) reported that the nutritive benefit of cat fish C.gariepinus (Burchell,1822) are threaten by its infestation by D.maculatus
during storage. Certain factors affect the development of insect pests
in smoked fish such as salt content, moisture content, temperature, etc.
It is of great importance to note that the most important environmental
factors that affect pest development are ambient temperature and
humidity.
1.3 IMPORTANCE OF FISH PRESERVATION
- Fish is very fast rotting being. So drying is must to keep them free from rotting.
- Drying fish has a great demand in the market. It also help to meet up the fish or protein
- Nowadays drying fish is also being used as nutritious protein food for poultry.
- Dried fish stays for long time.
- As the drying weights less so, it cost less while transporting.
- It is become not possible to consume or sell all fish then drying is a suitable way for preserving.
1.4 STATEMENT OF PROBLEM
The following problems were encountered during the research work:
(i) Animal/insect infestation
(ii) The weather condition.
(iv) collection of the insect beetle was very difficult (D. maculatus).
1.5 AIM OF THE STUDY
To Compare and evaluate the
effectiveness of some preservation techniques such as smoking, sundrying
and saltdrying on catfish inoculated with fish beetle
1.6 OBJECTIVE OF THE STUDY
This research work is intended carry out for the following:
- To determine the effect of preservation of fish techniques inoculated with D. maculates.
- To identify the most hygienic ways of preservation of fish and fungus associated with fish preservation.
1.7 SIGNIFICANCE OF THE STUDY
Fresh fish handling procedures
encompass all the operations aimed at maintaining food safety and
quality characteristics from the time fish is caught until it is
consumed. In practice, it means reducing the spoilage rate as much as
possible, preventing contamination with undesirable microorganisms,
substances and foreign bodies and avoiding physical damage of edible
parts. The immediate effect of fish handling procedures (e.g., washing,
gutting, chilling) on quality can easily be assessed by sensory methods.
Fish quality, in terms of safety and keeping time, is highly influenced
by non-visible factors such as autolysis and contamination and growth
of microorganisms. These effects can only be assessed long after the
damage has occurred, and the proper procedures must thus be based on
knowledge about the effects of the many different factors involved.
Large or small improvements are usually feasible when analyzing current
fish handling methods.
1.8 LIMITATIONS OF THE STUDY
Several factors which affect the rate at which salt is taken up and water is replaced in fish are:
- Environmental factors such as humidity, temperature, sunshine, raining season and human factor.
- The thicker the fish, the slower the penetration of salt to the centre.
- The higher the temperature, the more rapid the salt uptake.
- The higher the salt concentration, the more slowly the fish dries;
CHAPTER TWO
LITERATURE REVIEW
2.1 BACKGROUND OF THE STUDY
Fish is highly nutritious with high
protein content. However, it is a suitable medium for growth of
microorganisms, if poorly processed (Oparaku and Mgbenka, 2012). The
growth of microorganisms and other non-microbial activities such as
lipid oxidation contribute to the deterioration of fish products. An
increase in the ambient temperature triggers favourable conditions for
microorganisms to thrive, which reduces the quality of fish and its
potential keeping time leading to food loss (Abolagba et al., 2011).
No comments:
Post a Comment