CARDIO PROTECTIVE ACTIVITIES OF N HEXANE EXTRACT OF DESMODIUM VELUTINUM STEM ON ALBINO WISTER RAT
ABSTRACT
This study evaluates the cardio
protactive effect of N-hexane extract of Desmodium Velutinum stem on
albino wister rat. Rats used in this study were grouped into four and
each group was fed differentely. Rats in group one, three, and four were
fed with the aid of a syringe without needle with 6ml of the
lipoprotein food mixture containing 3.6g of the cow’s brain twice a day
for seven days. Rats on group two was fed with only grower’s mash and
water for seven days; rats in group three was later administered orally
2ml of dissolved vasoprin drug once in a day for 3 days. Rats in group
four were also administered orally 0.5ml of the liquid drug extract of
Desmodium Velutinum stem once a day for 3 days. During these three (3)
days, the rats were given grower’s mash and water. After the feeding
period, the rate fed with the cow’s brain showed a significant increases
in the activities of marker enzymes such as creatine kinase (CK),
creatine kinase MB (CKMB), Aspartatatranseaminase (AST),
Alaninetransminase (ALT), and lactatedehydrogenase. This study shows
that N-hexane extract of Desmodium Velutinum stem posses cardio
protective effect on albino wister rats than the known drug (vasoprin)
if only one can increase the dosage of the extract for a period of time.
CHAPTER ONE
1.0 INTRODUCTION
The heart is a hollow muscular,
cone-shaped organ, lying between the lungs in a block of tissue called
the mediastinum (Khader, 2004). The heart begins beating some few weeks
following conception and beats throughout life (Khader, 2004). It is
also the strongest muscle in the human body and functions to maintain a
constant circulation of blood throughout the body, it also acts as a
pump and its action is composed of a series of events known as the
cardiac cycle. The heart is composes of three layers of tissue which
are; the pericardium, the myocardium and the Endocardium. The heart acts
as a pump which drives blood into and through the arteries, but the
right and the left side of the heart functions separately from one
another some of the diseases associated with the cardiovascular system
includes coronary heart diseases (CHD) which is the most common of heart
diseases and it occurs when the arteries supplying blood to the heart
narrow or harden from the build-up of plaque (Gina, 1996.),Ischemic
heart disease, cerebrovascular disease( CeVD),peripheral vascular
disease, Heart Failure etc and some of the pharmacological treatment
includes Angiotesin commonly prescribes includes Benazepril, Captopril,
Moexipril, Beta Blockers which includes, Acebutolol, Betaxolol,etc.
The heart marker enzymes includes
creatine kinasse(CK-MB)which is the enzyme used as the definitive serum
marker for the diagnosis or exclusion of acute myocardial infarction
(Andreas,2009).
Troponin 1 Rapid test which is a lateral
flow chromatographic immunoassay for the qualitative detection of
cardiac Troponin 1(CTn1)and its complex in human serum or plasma at the
level equal or higher than 1ng/ml. Myoglobin which is also designed for
qualitative determination of myoglobin in human whole blood serum or
plasma as an aid in the diagnosis of myocardial infarction (MI) and
myoglobin is also a low molecular weight cytoplasm protein which is
released into the blood stream when muscle cells are damaged and this
protein is released into the blood stream more rapidly than any other
myocardial marker and elevated levels can be detected as early as one
(1) hour after the onset of AMI(Penttila,2002). Demodium velutinum has
been suggested to have some therapeutic effect in the treatment of
cardiovascular disorder and in the reducing of high cholesterol content
in the body. Demodium Velutinum is one of the few shrubs
species that has been identified as a well adapted to acid tropical soil
and a good nutritive value(Schultze-Kraft, 2002).Every culture has
relied on the variety of natural medicines found in healing plants for
the therapeutic properties (Armstrong, 2004). Researchers find that
food and their individual constituents perform similar fashion to modern
drugs and sometimes better without the dreaded side effect. The leaves
and young stems are rich in crude protein and mineral elements and can
provide higher levels of some nutrient (Bakker, 1994). Natural plants
have been valuable sources of mineral agent with proven potential of
treating infectious diseases and with lesser side effects compared to
the synthetic drug agents (Guyton, 2002). Hence potentially useful drugs
can often be recognized from their relative importance and uses in folk
medicine. Extract of Desmodium velutinum stem are used
traditionally in some diseases condition particularly headache and may
be a source of a pharmacological active agent useful in the treatment of
aches and pain(Anowi,2012). This work aimed at investigating any
hypocholesterolemic activity in the N-hexane extract of Desmodium Velutinum stem.
CHAPTER TWO
LITERATURE REVIEW
2.0 The Heart
The human heart is the size of fist.
However, it works relentlessly from before birth to death. The heart
being beating by 21 to 28 days after conception and beats throughout
life. It is also the strongest muscle in the human ( Anaya 1996).The
average heart beats about 100,000 times over a seventy year lifetime.
With each beat, the heart pumps blood through the blood vessels or
arteries to all parts of the body. It beats approximately 70 to 80 times
a minute; this rate can double during exercise or at time of emotion
SOLD BY:
No comments:
Post a Comment