BIOCONTROL POTENTIAL OF BACILLUS THURINGIENSIS ISOLATED FROM SOIL SAMPLES AGAINST LARVA OF MOSQUITO
ABSTRACT
A major challenge for achieving
successful mosquito control is overcoming insecticide resistance.
Bacillus thuringiensis which is one of the most effective biolarvacide
for control of species of mosquitoes and monitoring of larval
susceptibility is essential to avoid resistance development. Mosquito
larvacidal activity of Bacillus thuringiensis was assessed by isolating
them from ecologically different soil habitats in and around Enugu
metropolis. The isolate organisms were confirmed as Bacillus
thuringiensis based on biochemical characterization and microscopic
observation. The larvacidal activity of Bacillus thuringiensis isolates
was tested against the larval of mosquito by using the standard cup
bioassay. The isolates of Bacillus thuringiensis showed a significant
level of variation in their larvacidal activity.
CHAPTER ONE
1.0 INTRODUCTION
Bacillus thuringrensis (Bt) is a well
known and widely studied bacterium which is known for its use in pest
management. Today it is the most successful commercial xenobiotic with
its worldwide application when compared with the chemical pesticides;
Bacillus thuringiensi has the advantages of being biologically
degradable, selectively active on pests and less likely to cause
resistance. Safety of Bacillus thuringiensi formulations for humans,
beneficial animals and plants explains the replacement of chemical
pesticides in many countries with these environmentally friendly pest
control agents.
Bacillus thuringiensis was first
isolated by the Japanese Scientist Ishiwata (1901) from skilkworm
larvae, bombyxmori, exhibiting sotto disease. After 10 years, Berliner
(1911) isolated the square gram (+) positive, spore-forming, rod shaped
soil bacterium from disease flour moth larvae, Anngasta Kachmiccalla, in
the Thuringia region of the Germany and named it as Bacillus
thuringiensis.
In the early 1930s Bacillus thuringiensi
was used against Ostrinianubilis, the European corn borer. The first
commercial product was available in 1938 in France, with the trade name
sporeine (Weiser, 1986). It was Bacillus thuringiensis subspecies
Kurstaki that was used for the control of the insect (Lepidopteran)
pests in agriculture and forestry (Luthy & Ebersold, 1981). New
commercial products arrived in 1980s after the discovering of subspecies
thuringiensis opened the gate for black fly and mosquito larvae
control.
Like all organisms, insect are
susceptible to infection by pathogenic microorganisms, many of these
infections agents have a narrow host range and therefore, do not cause
uncontrolled destruction of beneficial insects and are not toxic to
vertebrates. Bacillus thuringiensis is a major microorganism, which
shows entamopathogenic activity (Glazer & Nikaido, 1995, Schnepf, et
al. 1998) which forms parasporal crystals during the stationary phase
of its growth cycle.
Most Bacillus thuringiensi preparations
available on the market contain spores with parasporal inclusion bodies
composed of δ – endotoxins. In commercial production, the crystals and
spores obtained from fermentation are concentrated and formulated for
spray on application according to conventional Agriculture practices
(Baum, Kakefuda, & Gawron-Burke, 1996). There are many strains of
Bacillus thuringiensi having insecticidal activity against insect order
(eg Lepidoptera, Diptera, Homoptera, Mollaphage, Coloptera). Only a few
of them have been commercially developed.
Bacillus thuringiensis insecticides are
divided into three groups, group one has been used for the control of
lepidopterans. These groups of insecticides are formulated with Bacillus
thuringiensi Subspecies. Kurstaki, group two contains thesandiego and
tenebrionis strains of Bacillus thuringiensis and has been applied for
the control of certain celopterans and their larvae. Group three
contains the Israelens is strains of Bacillus thuringiensis which has
been used to control black flies and mosquitoes.
CRYSTAL COMPOSITION AND MORPHOLOGY
The existence of parasporal inclusions
in Bt was first noted I 1915 (Berliner 1915) but their protein
composition was not delineated until the 1950s (Angus 1954). Hannay
(1953) detected the crystalline fine structure that is a property of
most of the parasporal inclusion. Bacillus thuringiensis subspecies can
synthesize more than one inclusion, which may contain different ICPs.
ICPs have been called data endotoxins; however since the term endotoxin
usually refers to toxin associated with the other membranes of
gram-negative bacteria, comprising a core lipopoly saccharide. Depending
on their ICP composition, the crystals have various forms (bipyramidal,
cuboidal, flat rhomboid, or a composition with two or more crystal
types. A partial correlation between crystal morphology, ICP
composition, and bioactivity against target insects has been established
(Bulla et al.1977). Hofte and Whitely, 1989, Lynch and Baumman, 1985).
GENERAL CHARACTERISTICS OF BACILLUS THURINGLENSIS
Bacillus thuringiensis is a member of
the genes Bacillus and like the other members of the taxon, has the
ability to form endospores that are resistant to inactivation by heat,
desiccation and organic solvent. The spore formation of the organism
varies from terminal to subterminal in sporangia that are not swollen,
therefore, Bacillus thuringiensis resembles other members of Bacillus
species in morphology and shape (Stahly, Andrews, & Yousten, 1991).
The organism is gram-positive and facultitative anaerobes. The shape of
the cells of the organism is rod. The size when grown in standard liquid
media varies 3 – 5um.
The most distinguishing features of
Bacillus thuringiensis from other closely related Bacillus species. (eg
Bacillus anthracis, Bacillus. cereus) is the presence of the parasporal
crystal body that is near to the spore outside the exosporangium during
the endospore formation, which is shown in figure 1:1 (Andrews,
Bibilops, & Bulla, 1985; Andrews, Faust, Wabiko, Raymond, &
Bulla, 1987; Bulla, Faust, Andrews, & Goodma, 1995). Bacillus
thuringiensis is an insecticide producing variant of Bacillus cereus
(Gordon, Haynes, & Pang, 1973) several Bt species also produce
Bacillus cereus type enterotooxin (Carlson, & Kolsto, 1993) plasmids
coding for the insecticidal toxin of Bacillus thuringiensis have been
transferred into B. cereus to make it a crystal producing variant of
Bacillus thuringiensis(Gonzalez, Brown, Carlton, 1982) molecular methods
including genomic restriction digestion analysis and 16 rRNA sequence
comparison support that Bacillus thuringiensis, Bacillus anthracis and
Bacillus cereus are closely relocated species and they should be
considered as a single species (Carlson, Caugant, & Kolstra, 1994;
Ash , Farrow, Dorsch, Stackebrandt, & Collins. 1991; Helgason et
al.2000).
CLASSIFICATION OF BACILLUS THURINGIENSIS SUBSPECIES
The classification of Bacillus thuringiensis based on the serological analysis of the flagella antigens was introduced in the early 1960s (de Barjac & Bonnefoi, 1962). This classification by serotype has been supplemented by morphological and biochemical criteria (de Barjac, 1981). Clutill (1977), explains that only 13 Bacillus thuringiensis subspecies were toxic to lepidopteran Larva only. And apparently Nematode (Narva et; al., 1991) enlarged the host range and markedly increased the number of subspecies up to the end of 1998, over 67 subspecies based on flagella H – Serovars had been identified.
The classification of Bacillus thuringiensis based on the serological analysis of the flagella antigens was introduced in the early 1960s (de Barjac & Bonnefoi, 1962). This classification by serotype has been supplemented by morphological and biochemical criteria (de Barjac, 1981). Clutill (1977), explains that only 13 Bacillus thuringiensis subspecies were toxic to lepidopteran Larva only. And apparently Nematode (Narva et; al., 1991) enlarged the host range and markedly increased the number of subspecies up to the end of 1998, over 67 subspecies based on flagella H – Serovars had been identified.
ECOLOGY AND PREVALENCE OF BACILLUS THURINGRENSIS
Although our knowledge about Bacillus thuringiensis occurs naturally and it can also be added to an ecosystem artificially to control pest, prevalence of Bacillus thuringiensis in nature can be said as “natural” and can be isolated when there is no previous record of application of the organism for pest control.
Although our knowledge about Bacillus thuringiensis occurs naturally and it can also be added to an ecosystem artificially to control pest, prevalence of Bacillus thuringiensis in nature can be said as “natural” and can be isolated when there is no previous record of application of the organism for pest control.
The Bacillus thuringiensis which belong
to artificial habitat areas are sprayed based insecticides (mixture of
spores and crystal). (Stahly et al. 1991). Thus, it is obvious that
Bacillus thuringiensis is widespread in nature. However, the normal
habitat of the organism is soil. The organism grows naturally as
asaprophyle, feeding on dead. Organic matter, therefore, the spores of
Bacillus thuringiensis persist in soil and its vegetative growth occurs
when there is nutrient available. Moreover Bacillus thuringiensis has
recently been isolated from marine environments (Maeda et al. 2000) and
from soil of Antarctica also (Foresty & Logan 2000).
However the true role of the bacteria is
not clear. Although it produces parasporal crystal inclusions that are
toxic to many orders of insects, some species of Bacillus thuringiensis
from diverse environments show no insecticidal activity. The
insecticidal activities of Bacillus thuringiensis are rare in nature.
For example, Iriarte et al.(2000) reported that there is no relationship
between mosquito breeding sites and pathogenic action level of Bacillus
thuringiensis in the surveyed aquatic habitats. While another study
suggested that habitat with a high density of insect were originated by
the pathogenic action of this bacterium (Itoqou Apoyolo et al.1995).
OTHER PATHOGENIC FACTORS OF BACILLUS THURINGIENSIS
At the period of the active growth cycle, the strains of Bacillus thuringiensis produce extracellular compounds; this compound might yield to virulence. These extracellular compounds include proteases, chitinases phospholipases, and vegetative conseticidal protein (Zhang et al. 1993; Sohneff et al. 1998).
At the period of the active growth cycle, the strains of Bacillus thuringiensis produce extracellular compounds; this compound might yield to virulence. These extracellular compounds include proteases, chitinases phospholipases, and vegetative conseticidal protein (Zhang et al. 1993; Sohneff et al. 1998).
Bacillus thuringrensis also produces
antibiotics compounds having antifungal activity (stab et al. 1994).
However the crystal toxins are more effective then these extracellular
compounds and allow the development of the bacteria in dead insect
larvae.
Bacillus thuringiensis strains also produce a protease, which is called inhibitor. This protein attacks and selectively destroys cecropiris and attacisis which are antibacterial proteins in insects, as a result of this, the defence response of the insect collapses. This protease activity is specific, it attacks an open hydrophobic region near C – terminus of the cecropin and it does not attack the globular proteins (Duthambar & Steiner, 1984).
Other important insecticidal proteins which are unrelated to crustal proteins are vegetative insecticidal protein. These proteins are produce by some strains of Bacillus thuringiensis during vegetative growth.
Bacillus thuringiensis strains also produce a protease, which is called inhibitor. This protein attacks and selectively destroys cecropiris and attacisis which are antibacterial proteins in insects, as a result of this, the defence response of the insect collapses. This protease activity is specific, it attacks an open hydrophobic region near C – terminus of the cecropin and it does not attack the globular proteins (Duthambar & Steiner, 1984).
Other important insecticidal proteins which are unrelated to crustal proteins are vegetative insecticidal protein. These proteins are produce by some strains of Bacillus thuringiensis during vegetative growth.
MORPHOLOGICAL PROPERTIES OF BACILLUS THURINGIENSIS
Colony forms can help to distinguish Bacillus thuringiensis colonies from other Bacillus species. The organism forms white, rough colonies, which spread out and can expand over the plate very quickly. Bacillus thuringiensis strains have unswallon and ellipsoidal spores that lie in the subterminal position. The presence of parasporal crystals that are adjacent to the spore in another cell is the best criteria to distinguish Bacillus thuringiensis from other closely related Bacillus species. The size number, of parasporal inclusion and morphology may vary among Bacillus thuringiensis strains. However, four distinct crystal morphologies are apparently the typical bipyramidal crystal, related to crystal proteins (Aronson et al. 1976). Cuboidal usually associated with bipyramidal crystal (Ohba&Aizawi 1986), amorphous and composite crystals related to cry4 and cry proteins (federicet al. 1990), and flat, square crystal related to cry3 proteins (Hernstadet al. 1986, Lopezmeza & Ibarra, 1996
Colony forms can help to distinguish Bacillus thuringiensis colonies from other Bacillus species. The organism forms white, rough colonies, which spread out and can expand over the plate very quickly. Bacillus thuringiensis strains have unswallon and ellipsoidal spores that lie in the subterminal position. The presence of parasporal crystals that are adjacent to the spore in another cell is the best criteria to distinguish Bacillus thuringiensis from other closely related Bacillus species. The size number, of parasporal inclusion and morphology may vary among Bacillus thuringiensis strains. However, four distinct crystal morphologies are apparently the typical bipyramidal crystal, related to crystal proteins (Aronson et al. 1976). Cuboidal usually associated with bipyramidal crystal (Ohba&Aizawi 1986), amorphous and composite crystals related to cry4 and cry proteins (federicet al. 1990), and flat, square crystal related to cry3 proteins (Hernstadet al. 1986, Lopezmeza & Ibarra, 1996
The classification was based in part on
the possession of parasporal bodies. Bernard et al.(1997) isolated 5303
Bacillus thuringiensis from 80 different countries and 2793 of them were
classified according to their crystal shape.
No comments:
Post a Comment